Jump to content

Allegheny and Bald Eagle Railroad, Coal and Iron Company

From Alfawiki
Adapted from the English Wikipedia article Allegheny and Bald Eagle Railroad, Coal and Iron Company, available under CC BY-SA 4.0Updated 24 July 2025
Bellefonte and Snow Shoe Railroad
Company typePrivate
IndustryCoal transportation, Rail transport
Founded1859
FounderThomas Burnside, Jacob Gratz, William A. Thomas (financial backer)
Defunct1881
FateAcquired by Bald Eagle Valley Railroad (subsidiary of Pennsylvania Railroad)
Headquarters
Centre County
,
United States
Area served
Centre County, Pennsylvania
ProductsCoal transportation

The Bellefonte and Snow Shoe Railroad was a coal-transporting railway located in Centre County, Pennsylvania, founded in 1859 and under the control of the Pennsylvania Railroad starting in 1881. As coal mining declined during the 1930s, traffic diminished, leading to the line’s abandonment in 1959.

Origins and construction

Initially incorporated in 1839 as the Allegheny and Bald Eagle Railroad, Coal and Iron Company, its founders included investor Thomas Burnside and Philadelphia coal landowner Jacob Gratz, who possessed over near Snow Shoe, Pennsylvania. The railroad’s purpose was to link the western Allegheny Mountains with Bald Eagle Creek. Although the Pennsylvania General Assembly renewed its charter several times, actual development remained dormant until 1855 when Bellefonte ironmaster William A. Thomas acquired Gratz’s coal properties, spurring new financial backing.

A charter amendment in 1855 permitted extension to Bellefonte, an important transportation center. After surveying was finalized in 1857, construction commenced in 1858. By 1859, the railroad connected Snow Shoe’s coal mines to Snow Shoe Intersection (present-day Wingate) situated in the Bald Eagle Valley. Furthermore, it laid of track from Snow Shoe Intersection to Bellefonte for the struggling Tyrone and Lock Haven Railroad, securing a lease on this segment for 999 years. The entire project was completed at a cost of $269,000—significantly under its $600,000 capitalization—highlighting efficient financial management uncommon for that era.

On March 24, 1859, the company adopted the name Bellefonte and Snowshoe Railroad Company. A formal inauguration occurred on June 21, 1859, featuring a special train journey from Bellefonte to Clarks, then serving as the line’s endpoint. Extensions reaching Snow Shoe were added later that year, with scheduled passenger service beginning in December.

Independent operation

Operations started at Bellefonte, a crucial location for iron furnaces reliant on coal and the uppermost navigable point on the Bald Eagle & Spring Creek canal. Using the Tyrone and Lock Haven right-of-way, the line extended northward through Spring Creek valley to Bald Eagle Valley at Milesburg. The Tyrone and Lock Haven intended to connect Lock Haven to the north and Tyrone to the south but only completed limited grading beyond Milesburg and Wingate—where the Bellefonte & Snow Shoe branched onto its own tracks. The route traced Wallace Run valley through Gum Stump before climbing the Allegheny Front via four switchbacks at Wallace Run forks. It then passed through Rhoads, Jonathan Run, South Fork Beech Creek gorges, and Fountain en route to Snow Shoe. The distance between Wingate and Snow Shoe measured 20.26mi. Switchbacks eased the steep climb from Wingate by reducing the ruling grade to 2.84%, while a gentler 1.09% grade applied from Snow Shoe up to Rhoads summit. Engineer William Harris optimized tractive effort to balance hauling loaded coal cars uphill from Snow Shoe against empty cars ascending from Wingate.

As mining activity grew, further extensions were constructed. In 1861, a branch from Snow Shoe heading north then west toward Gillintown and Moshannon was incorporated in 1863 as the Moshannon Railroad, operated jointly with Bellefonte and Snow Shoe, adding approximately 2mi of track.

Concurrently, the Pennsylvania Railroad controlled the Tyrone and Lock Haven line—reorganized as the Bald Eagle Valley Railroad in 1861—and extended it southward from Wingate to Vail by 1863. This extension linked with the PRR-operated Tyrone and Clearfield Railroad and achieved completion of Milesburg to Lock Haven by 1865.

In 1869, Bellefonte & Snow Shoe upgraded its facilities by installing a telegraph system between Snow Shoe and Wingate. Plans developed in 1871 for a branch from Bellefonte toward Oak Hall intended to connect with the Lewisburg, Centre and Spruce Creek Railroad; however, financial difficulties delayed this project until it was ultimately constructed by the Bellefonte, Nittany and Lemont Railroad.

A major accident occurred on June 11, 1878, when Miller's Spring Trestle gave way beneath a southbound mixed train traveling from Snow Shoe to Bellefonte. The train plunged approximately 55ft into a ravine, resulting in one passenger fatality along with injuries sustained by two passengers and four crew members.

Snow-Shoe Branch

In January 1881, the Bellefonte & Snow Shoe Railroad ended its independent operations and was acquired by the Bald Eagle Valley Railroad, a long-established subsidiary of the Pennsylvania Railroad (PRR). Subsequently, on April 7, 1881, the Bellefonte & Snow Shoe and Moshannon Railroads were consolidated into the Bald Eagle Valley Railroad, creating what became known as the Snow-Shoe Branch.

Under the direction of Bald Eagle Valley management, multiple branch lines were constructed to serve coal mining operations. The Sugar Camp Branch was extended in 1890, stretching 4.75 miles from a point north of Snow Shoe to Clarence, providing service to the Lehigh Valley Coal Company’s #9 Mine. Near the Beech Creek crossing, the Grauer Branch diverged and ran 2.04 miles northward to reach Sugar Camp and Clarence Colliery #1. Additionally, in 1903, the Fountain Branch was built, measuring 1.32 miles and crossing the Beech Creek Railroad to connect with Lehigh Valley Coal Company’s #14 Mine.

On March 31, 1908, the Bald Eagle Valley Railroad was fully integrated into the Pennsylvania Railroad system, bringing the Snow-Shoe Branch and its associated spurs under PRR control. Between 1914 and 1915, PRR extended the Sugar Camp Branch by an additional 3.87 miles to access Poorman Side and Cherry Run #4 Mine operated by Big Sandy Coal Company near Shettleston. That same year saw the construction of the Big Sandy Branch, which stretched 2.41 miles to serve Lehigh Valley Coal Company’s #25 Mine.

Despite these infrastructure investments, the route faced decline due to broader industry difficulties. The Fountain Branch was dismantled by 1923, while the economic hardships of the Great Depression resulted in numerous coal mine shutdowns. The Big Sandy Branch was abandoned in 1935. Remaining traffic primarily consisted of shipments for a fire brick manufacturer near Clarence and operations from surviving mines; however, mine branches were progressively reduced. Ultimately, on March 6, 1959, PRR discontinued service on the entire segment north of Wingate.

The history of this branch illustrates PRR’s strategic attempts to leverage local coal markets through focused infrastructure development, although sustained growth was ultimately constrained by economic downturns and evolving industry conditions.