The B Line is a north-south light rail corridor in Phoenix, Arizona, forming part of the Valley Metro Rail network. Introduced on June 7, 2025, this addition transformed the system from a single route into a dual-line network. Stretching from Metro Parkway to Baseline/Central Avenue, the B Line encompasses 27 stations and significantly improves transit access within Phoenix’s central urban area.

Service description

Functioning as a newly established light rail route, the B Line extends from Baseline Road to the Downtown Phoenix Hub, then proceeds northward by merging with the pre-existing line up to Metro Parkway. To accommodate the expanded service demands, 17 new light rail vehicles will be incorporated into the fleet.

Beginning at Metro Parkway near the site of the former Metrocenter mall, the route travels eastward along an elevated viaduct above Interstate 17, runs parallel to Mountain View Road, and then heads south along 25th Street past the Rose Mofford Sports Complex. It continues southward to Dunlap Avenue, briefly turns east, and then moves south on 19th Avenue for approximately four miles. After three stops on 19th Avenue, it veers east onto Camelback Road for 2.5 miles before turning south onto Central Avenue entering Downtown Phoenix. Between Roosevelt and Lincoln Streets, the line operates on separate one-way tracks before converging again at Hadley Street and continuing south beneath Interstate 17 and over the Salt River bridge to its terminus at Baseline/Central Avenue station.

Hours and frequency

Time 4A 5A 6A 7A 8A-1P 2-6P 7P 8P-12A
Weekdays 12 20
Saturdays 15 20
Sundays/Holidays 20

Station listing

The following table lists all B Line stations from north to south, each situated within Phoenix city limits.

Station Date opened Neighborhood Major connections and notes
Template:Stn January 27, 2024 North Mountain Template:Rint Phoenix BRT (2030)
Park and ride: 263 spaces
Template:Stn
Template:Stn
Template:Stn Mar 19, 2016 Park and ride: 415 spaces
Template:Stn Alhambra
Template:Stn
Template:Stn Dec 27, 2008 Park and ride: 794 spaces
Template:Stn Park and ride: 410 spaces
Template:Stn Park and ride: 123 spaces
Template:Stn Park and ride: 135 spaces
Template:Stn Encanto
Template:Stn
Template:Stn
Template:Stn
Template:Stn
Template:Stn Central City
Template:Stn
Van Buren/1st Avenue (southbound only)
Van Buren/Central Avenue (northbound only) Template:Rint Phoenix BRT (2030)
Downtown Phoenix Hub
Lincoln/1st Avenue (southbound only)
Lincoln/Central Avenue (northbound only)
Template:Stn
Template:Stn
Template:Stn
Template:Stn
Template:Stn
Template:Stn Park and ride: 110 spaces


History

The northern segment of the B Line beyond Downtown Phoenix was originally constructed as part of the Valley Metro Rail network, debuting service to the Montebello/19th Avenue station in 2006. Later, the Northwest Extension Phases I and II, completed in 2016 and 2024 respectively, pushed the line’s northern endpoint further to Metro Parkway station.

The line was extended southward from Downtown Phoenix along Central Avenue reaching Baseline Road, incorporating eight additional stations and two park-and-ride locations into the Valley Metro Rail system. This expansion also featured a newly established central downtown station, which improved operational efficiency by allowing trains to perform short turn maneuvers during busy periods and special events.

Following environmental clearance from the Federal Transit Administration (FTA) in January 2017, the project moved forward into the design phase. Initial proposals to reduce Central Avenue’s general traffic lanes from four to two to accommodate rail tracks encountered public resistance. Nonetheless, the city council approved the plan, despite a subsequent unsuccessful ballot initiative intended to stop funding for Valley Metro Rail. Construction commenced in 2019 and was completed in 2025, with the extension officially opening on June 7.