Jump to content

Baltimore Metro SubwayLink

From Alfawiki
Baltimore Metro SubwayLink
Company typePublic transit system
IndustryPublic transportation
Founded1983
FounderMaryland Transit Administration
Headquarters
Baltimore
,
United States
Area served
Baltimore, Maryland and northwestern suburbs
ProductsRapid transit service
OwnerMaryland Transit Administration
ParentMaryland Transit Administration
Websitemta.maryland.gov/metro-subway

Baltimore Metro SubwayLink

The Baltimore Metro SubwayLink is a rapid transit system serving Baltimore, Maryland, and its northwestern suburbs, managed by the Maryland Transit Administration. While the section through downtown operates underground, much of the line beyond the city center runs on elevated or surface-level tracks. In , the system recorded an annual ridership of , with an average weekday usage of approximately as of .

History

The concept for the Metro SubwayLink emerged from the 1965 Baltimore Area Mass Transportation Plan, which envisioned six rapid transit lines extending from a central urban loop. By 1971, this plan was reduced to a network focusing on two lines: one extending northwest from Downtown Baltimore to Owings Mills, and another heading south toward Glen Burnie and the airport. Funding for the initial phase was secured in 1972; however, following advocacy by Anne Arundel County residents, the southern line was eliminated in 1975. The corridor south of Baltimore was later served by the Baltimore Light RailLink.

When service began on November 21, 1983, only the northwest segment was active, operating over between Charles Center and Reisterstown Plaza. An extension reaching Owings Mills opened in 1987, partially running along the median of Interstate 795. A further extension to Johns Hopkins Hospital was introduced in 1995. The entire project cost totaled $1.392 billion upon completion.

Currently, the system covers , comprising underground, elevated, and at-grade track segments. Of its 14 stations, eight are located underground at depths ranging from to , while elevated stations are positioned approximately above ground level.

At its inception, the Metro SubwayLink was notable for being the largest single user of Susan B. Anthony dollar coins in the United States, reflecting its substantial ridership and fare collection volume.

Work to implement cellular connectivity within underground sections commenced in September 2021 with an expected finish date of June 2022; however, as of December 2024, this enhancement remains incomplete.

Route

The Metro SubwayLink runs a single reverse "J"-shaped route. Trains travel southbound underground from Johns Hopkins Hospital, proceed west beneath Baltimore’s central business district, then turn north at Charles Center and northwest at State Center. The line emerges from the tunnel near Mondawmin station onto an elevated structure that parallels Wabash Avenue and the Hanover Subdivision along what was once part of the Western Maryland Railway corridor. It continues along the median strip of Interstate 795 until reaching its terminus at Owings Mills.

Trains heading toward Johns Hopkins Hospital are designated as "eastbound," while those traveling to Owings Mills are labeled "westbound."

Schedules

A complete journey on the line takes roughly 30 minutes. Train frequency varies from eight-minute intervals during weekday peak periods to fifteen-minute intervals during late nights and weekends. Operating hours run from 5 a.m. until midnight on weekdays and from 6 a.m. to midnight on weekends.

Fares

As of 2024, fare structures are unified across MTA buses, Metro SubwayLink, and Light RailLink services:

Category Full Fare Senior/Disability Student Mobility
Single Ride $2.00 $1.00 $1.50 $2.20
Day Pass $4.60 $2.30 – –
Weekly Pass $22.00 – – –
Monthly Pass $77.00 $23.00 – –

Passengers eligible for paratransit services may ride the Metro SubwayLink without charge.

Performance

During the 2010 fiscal year, the MTA recorded a 95% punctuality rate for the Metro SubwayLink service. The system achieved an average of 3.0 passenger trips per revenue mile and handled 13.4 million riders annually. Operating expenses were $11.59 per revenue mile, which is more cost-effective compared to local bus services, which averaged $13.57 per revenue mile.

Stations

The Metro SubwayLink consists of 14 stations, with all except Owings Mills, Old Court, and Milford Mill situated within the Baltimore city limits.

Location Distance (mi/km) Station Connections
Owings Mills 0.0 Owings Mills LocalLink: 87, 89
Lochearn 3.6 Old Court LocalLink: 37, 83
5.4 Milford Mill LocalLink: 81, 85
Glen 6.1 Reisterstown Plaza LocalLink: 82
Arlington 7.1 Rogers Avenue LocalLink: 28, 30, 31, 34, 80, 82, 89
8.3 West Cold Spring LocalLink: 28, 82
Mondawmin 10.1 Mondawmin CityLink Navy, Lime, Yellow; LocalLink: 22, 26, 29, 82, 83, 85, 91
Penn-North 10.8 Penn-North CityLink Lime, Gold; LocalLink: 85
Upton 11.3 Upton–Avenue Market CityLink Lime
Mount Vernon 12.5 State Center (Light RailLink at Cultural Center); CityLink Lime, Yellow; LocalLink: 54, 73; Express BusLink: Route 154; MTA Commuter Bus: Route 410
Downtown Baltimore 13.3 Lexington Market (Light RailLink); CityLink Blue; LocalLink: 54, 71, 80, 94; Express BusLink: Routes 105,115,120,150,154,163; MTA Commuter Bus: Route 320
13.8 Charles Center (CityLink Orange, Green, Silver, Red, Purple); QuickLink: 40; LocalLink:51,56,65,67,71,76,78,95; Express BusLink: Routes103,105,120,150,160; MTA Commuter Bus: Routes210,215,310,410-420; Charm City Circulator Purple
14.4 Shot Tower (CityLink Orange, Blue, Purple); QuickLink:40; LocalLink:54,67,76,78; Express BusLink: Routes105,150,154,160; Charm City Circulator Green

|- |Middle East |15.4 |Johns Hopkins Hospital |CityLink Pink, Gold, Brown,Lime; LocalLink:21 ,56 ;Express BusLinks:105 ,115 ,120 ,160 ;MTA Commuter Bus routes210 ,215 ,310 ,320 ,411 ,420 ;Charm City Circulator Green |}

Connecting services

The majority of Metro SubwayLink stations are accessible via several MTA bus lines. Soon after the Metro's inauguration in 1984, feeder bus routes were introduced using letter-number codes which were later unified under an "M" prefix. By the year 2008 these routes adopted two-digit numerical designations. In August of the following year (2009), the final four feeder routes were either renumbered or removed without changes to their paths but continued functioning as feeder services.

While there is no direct transfer between Metro SubwayLink and either the Baltimore Light RailLink or MARC Train commuter rail systems, some stations are conveniently close to one another. For example, Lexington Market Station is within a short walking distance from the Light RailLink’s Lexington Market stop. Similarly, State Center station lies near the Light RailLink’s Cultural Center station. Baltimore Penn Station is approximately half a mile from State Center station and MARC Camden Station is located about five blocks from Lexington Market Metro station.

Rolling stock

As of 2024, the majority of the fleet is composed of railcars produced by the Budd Company located in Northeast Philadelphia. To modernize the aging vehicles, new railcars are being manufactured by Hitachi Rail Italy at their Florida facility.

The initial batch of 100 Budd-built cars was delivered in 1983, with further additions made in 1986 to support system growth. These Universal Transit Vehicles mirror those previously operated on Miami Metrorail, a result of a collaborative procurement effort aimed at reducing costs. A number of these Budd railcars have since been phased out.

Trains are powered by an electric third rail and operate in married pairs, typically forming 4-car trainsets; during peak periods, 6-car configurations are utilized. Each car measures 75 feet in length and can carry up to 166 passengers, including 76 seated. Between 2002 and 2005, the fleet underwent a comprehensive mid-life refurbishment that included new flooring, seat reupholstering, and upgrades to LED destination displays as well as internal announcement systems.

In July 2017, the MTA awarded a $400.5 million contract for 78 new railcars from Hitachi Rail Italy, which share design similarities with Miami’s latest fleet. These Hitachi vehicles incorporate regenerative braking technology to improve energy efficiency. The initial units were delivered in October 2023, with a phased rollout planned through 2026 to replace older equipment.

Incidents

On February 11, 2018, the entire Baltimore Metro system was shut down for one month to carry out urgent track repairs discovered during a safety inspection. Prior to this, an aboveground section had already been closed for emergency maintenance. Full service resumed on March 9, 2018.

During the summer of 2023, a fire caused damage to part of the subway infrastructure, resulting in a temporary closure. Normal operations were restored within several days.

See also

External links