The Bank of America Tower, also referred to as 1 Bryant Park, is a 55-story skyscraper situated in Midtown Manhattan, New York City. Positioned at 1111 Sixth Avenue, between 42nd and 43rd Streets and diagonally across from Bryant Park, the building was designed by Cookfox and Adamson Associates and developed by the Durst Organization on behalf of Bank of America. Standing at , it ranks as the ninth tallest structure in New York City and the tenth tallest in the United States.
This tower provides of office space, predominantly occupied by Bank of America. Its seven-level podium spans the entire city block and houses the Stephen Sondheim Theatre, a recognized landmark, along with retail outlets and a pedestrian atrium. The exterior is characterized by a curtain wall composed of insulated glass panels. Upon its inauguration, the building achieved LEED Platinum certification for its environmental design; however, by the early 2020s, its energy usage had surpassed municipal emissions standards.
Land acquisition efforts began in the 1960s under Seymour Durst, though progress was impeded due to divided property ownership. The project was revitalized in the early 2000s by Douglas Durst, who consolidated parcels through 2003. Construction started in 2004 with Bank of America as the primary tenant. Despite various construction obstacles, the $1 billion project was finalized in 2009. Other key occupants include Marathon Asset Management, Akin Gump Strauss Hauer & Feld, and Roundabout Theatre Company.
Site
The Bank of America Tower is positioned on the west side of Sixth Avenue (also known as Avenue of the Americas), between 42nd Street and 43rd Street in Midtown Manhattan, New York City. Although its official address is 1111 Avenue of the Americas, it is widely recognized as 1 Bryant Park. This "vanity address" was adopted at the request of its principal tenant, Bank of America, to create an association with nearby Bryant Park located to the southeast. Nevertheless, New York City authorities do not officially acknowledge 1 Bryant Park as a valid address since Bryant Park is not a street.
The rectangular parcel covers , featuring frontages measuring on both 42nd and 43rd Streets and on Sixth Avenue. The building occupies an entire city block alongside 4 Times Square to its west. The sidewalks are lined with 149 stainless-steel bollards spaced every apart. Surrounding landmarks include the Town Hall theater and Lambs Club to the north, The Knickerbocker Hotel southwestward, as well as Bush Tower and 1095 Avenue of the Americas to the south, with Bryant Park lying to the southeast. The site lies adjacent to New York City Subway tunnels running along its southern and eastern boundaries.
Former structures
The location, once characterized by hills and grassy fields with a stream marking its western edge, was previously home to several buildings. During the late 1800s, the area consisted primarily of row houses, which were subsequently replaced by commercial properties in the early 1900s. Numerous of these earlier constructions accommodated retail shops, dining establishments, and theaters.
Immediately prior to the tower's construction, two separate two-story buildings stood at 1111 Avenue of the Americas and 105-109 West 42nd Street. The Remington Building, a commercial edifice rising 20 or 22 stories, was situated at 113 West 42nd Street. Additionally, the Hotel Diplomat, a 13-story structure operational since 1911, occupied 108 West 43rd Street. The block also contained a Masonic Temple as well as the eight-story Roger Baldwin Building at 132 West 43rd Street, which formerly served as the headquarters for the American Civil Liberties Union. The northern portion of the Bank of America Tower integrates the Stephen Sondheim Theatre—originally Henry Miller's Theatre—rebuilt during the tower’s development.
Subway access
Next to the Bank of America Tower lies an entrance to the New York City Subway's 42nd Street–Bryant Park/Fifth Avenue station, which is served by the . This entrance is enclosed by glass and includes stairways descending from Sixth Avenue to the subterranean mezzanine level, along with an elevator. Its glass canopy is equipped with a BIPV system that produces a portion of the building’s electricity.
During construction, an underground corridor was created beneath 42nd Street to link the Bryant Park complex with the Times Square–42nd Street station. Upon completion, this passageway remained closed. Renovation plans scheduled between 2019 and 2022 intended to open this connection and establish a new entrance on 42nd Street between Broadway and Sixth Avenue. However, since the Durst Organization opted not to finance an underpass connecting the shuttle platform with the Tower’s passageway, an alternate ramp was built nearby instead, leaving the original corridor unused.
Architecture
The Bank of America Tower was commissioned by Douglas Durst of the Durst Organization and crafted by Cookfox Architects for Bank of America. The role of executive designer was fulfilled by Adamson Associates, while Severud Associates handled structural engineering, Jaros, Baum & Bolles managed MEP engineering, and Tishman Realty & Construction acted as the general contractor. A wide array of additional consultants and contractors supported its design and construction phases.
This skyscraper encompasses of office area across 55 floors above ground and three subterranean levels. It is distinguished by two spires: a southern architectural spire reaching 1,200 ft and a northern wind turbine standing at 960 ft. These features place it as the eighth tallest structure in New York City and the tenth tallest within the United States.
Notably, the Bank of America Tower was the inaugural commercial high-rise in the U.S. designed to secure LEED Platinum certification, establishing a pioneering benchmark for sustainable skyscraper design worldwide. Although incorporating green technologies increased construction expenses by 6.5%, anticipated annual energy savings were $3 million alongside an estimated $7 million productivity gain per year. Nonetheless, initially high occupancy levels curtailed these advantages. In 2018, the building earned a "C" rating on New York City's energy efficiency scale and confronted possible fines under a carbon emissions regulation enacted in 2019. Bloomberg reported in 2022 that emissions might surpass city limits by 50% come 2024, potentially incurring $2.4 million in yearly penalties.
Form and facade
Occupying the full site footprint, the structure includes a seven- to eight-story base beneath the tower portion located on the eastern side, which covers . The facade incorporates multiple angled planes designed to mitigate wind loads compared to a traditional rectangular form. Serge Appel from Cookfox explained that this approach aligns with Bank of America's ambition for "an iconic form" while optimizing views toward nearby buildings. One segment contains a rooftop garden spanning . The three basement floors extend as deep as below ground level.
The lower floors present an approximately rectangular layout, with protrusions of about at the northeast and southwest corners. The southeast corner facing Bryant Park forms a right angle along the lowest third but transitions into a chamfered wedge shape on higher levels, resulting in varying floor shapes throughout the tower. Although architects debated orienting the tower diagonally toward Bryant Park, they ultimately maintained alignment with the Manhattan street grid as an intentional "urban gesture." Due to sloping facades, upper stories are oriented diagonally.
Tower facade
The facade of Bank of America Tower is predominantly composed of a glass curtain wall covering over . At its base, vertical and inclined sections are present, while upper floors feature double and screen walls. Glass panels at lower levels are framed by horizontal and vertical mullions, with each floor showcasing full-height insulated glazing units. The upper and lower edges of these panels utilize fritted glass, leaving the central portions clear to preserve outward views. Overall, the curtain wall consists of 8,644 individual panels. On higher stories, mullions appear vertical but are slightly angled to conform with the sloped facade surfaces.
The design draws inspiration from both New York’s 19th-century Crystal Palace and the Durst family’s collection of crystal artifacts. Richard Cook from Cookfox described this curtain wall as embodying "the ideal of modern banking is open, clear, transparent."
Constructed to comply with LEED criteria, the curtain wall maximizes daylight penetration within lobby and office environments. Integrated photovoltaics (BIPVs) installed above the main entrance at 42nd Street and Sixth Avenue generate modest amounts of electricity; additional BIPVs are embedded within some spandrels on the eastern facade. The southeast chamfer includes a double-glazed wall that reflects summer sunlight effectively. Double-insulated curtain wall panels cover , allowing 73% transmission of visible light while fully blocking ultraviolet radiation. This configuration enhances energy efficiency by preventing heat gain during summer months and minimizing heat loss in winter.
An oxidized-bamboo canopy extends outward approximately beyond the principal entrance and continues inside as part of the lobby ceiling.[1]
Stephen Sondheim Theatre
The front elevation of Henry Miller's Theatre, presently known as the Stephen Sondheim Theatre, stands as a designated New York City landmark at 124 West 43rd Street and serves as the base structure for the Bank of America Tower. Crafted in a neo-Georgian architectural style by Paul R. Allen alongside Ingalls & Hoffman, this facade spans roughly 50 feet in height, 86 feet in width, and measures 4 feet in thickness. Its landmark designation mandated preservation during the theater’s integration into the Bank of America Tower project, preventing any modification or removal. To facilitate construction, the facade was temporarily upheld by a three-story steel framework and now projects outward from the surrounding glass curtain wall, crowned by a billboard.
At street level, the facade is anchored by a granite water table beneath a brick exterior. Centrally positioned are five rectangular doorways featuring recessed metal doors topped with stone lintels decorated with urn motifs and rosettes. Above the central entrances, a marquee bearing the name "Stephen Sondheim" signifies the theater’s rechristening. On either side of these doorways are segmental-arched passageways equipped with wrought-iron gates and lanterns, which formerly functioned as alley entrances.
The upper portions of the facade comprise red brick laid in common bond, arranged into two end pavilions framing five vertical bays. Each bay is defined by protruding brick pilasters capped with elaborately detailed Corinthian-style terracotta capitals. The second story includes rectangular windows adorned with stone keystones, brick voussoirs, and outward-curving iron balconies. The third story features three centrally located round-arched windows flanked by blind arches, also embellished with keystones and voussoirs. The end pavilions incorporate arched niches on the second floor and terracotta roundels on the third floor, topped by a terracotta frieze inscribed with "Henry Miller's Theatre" and triangular pediments surmounting each pavilion. A parapet completes the roofline of this historic facade.
Substructure
The building site rests upon robust Hartland bedrock. Along its southern boundary lies the cut-and-cover tunnel of the 42nd Street Shuttle, while to the east is the IND Sixth Avenue Line tunnel, constructed through cut-and-cover and mining techniques. Pre-construction soil borings indicated variable rock conditions: competent bedrock was typically encountered between 10 and 20 feet below grade near Sixth Avenue, deepening to approximately 50 feet near an old stream bed along the western edge. The underlying hard rock primarily consists of gneiss and schist characterized by joints that slope downward.
Foundations employ spread footings beneath column supports. An existing foundation wall on the eastern side was retained and repurposed as a retaining wall stabilized by piers spaced at ten-foot intervals and anchored into bedrock with rock anchors. During construction, rock bolts were installed to reinforce sections adjacent to subway tunnels, while seismometers continuously monitored any ground movement around these tunnels.
Superstructure
The Bank of America Tower’s structural framework integrates both steel and concrete elements. Its mechanical core—which contains stairwells and elevator shafts—is enclosed within concrete shear walls surrounding a lightweight steel skeleton; all other structural components are steel-based. The concrete mix incorporates 45% slag, a blast furnace byproduct that lowers carbon dioxide emissions by an estimated 50,000 tons; this slag comprises 68,000 cubic yards of concrete used throughout construction. Furthermore, 60% of all steel utilized in the superstructure is recycled material sourced predominantly within a 500-mile radius of New York City.
Vertical structural loads are directed towards the tower’s core; steel beams are placed atop upper elevator banks where load demands are minimal. Two orthogonal trusses positioned above lower elevator banks distribute heavier loads from upper floors effectively. Diagonal columns channel vertical forces inward toward the core. Perimeter columns are spaced every 20 feet and incline inward at varying elevations. Tie beams and connection systems counterbalance horizontal forces at intersections between vertical and diagonal columns. Horizontal trusses at multiple levels transfer lateral loads from sloping corner columns back to the shear walls within the mechanical core. Base load-bearing elements include box columns measuring 24 by 24 inches.
Floor construction consists of three-inch composite metal decking with a floor-to-floor height of approximately 14.5 feet. The typical distance from perimeter to core is around 40 feet; however, at northeast and southwest corners this extends to 55 feet using cantilevered filler beams to maximize interior space without adding columns. Cantilevered beam ends are vertically connected to distribute live loads across multiple floors. Above the Stephen Sondheim Theatre auditorium, plate girders channel vertical loads to sidewalls while a Vierendeel truss maintains an unobstructed view of the preserved facade.
The roof’s screen walls are supported by slender cantilevered beams engineered to bear mechanical equipment weight efficiently. Rising approximately 300 feet above roof level is an architectural spire featuring a cylindrical mast that tapers from 58 inches in diameter at its base to 26 inches at its summit. The mast is reinforced by pipe sections bolted in triangular configurations. LED lighting installed on the spire is controlled via Spireworks—an application enabling public users to modify lighting colors on timed sequences remotely.
Mechanical and environmental features
The building incorporates a cogeneration facility that fulfills up to seventy percent of its energy requirements.[1][2] Its output capacity is estimated to vary between and .[3][4] Fueled by natural gas, this plant powers essential office functions as well as key mechanical systems including lighting and elevators.[4] During periods of peak demand, it supplies roughly 35 percent of the energy consumed.[5] Supplementary energy is provided by a rooftop wind turbine.[6][7] Additionally, methane produced from organic waste generates about daily.[4] Distinctively, the tower is connected to an electrical substation located in Lower Manhattan, setting it apart from other skyscrapers in Midtown.[8]
In the basement, an ice-storage system creates ice overnight when electricity rates are lower.[1][2] This system includes 44 tanks containing of glycol solution maintained at approximately .[9] The air-conditioning setup employs chillers with capacities ranging from , which operate selectively to enhance energy efficiency.[3] Groundwater trapped within the bedrock is regulated at , serving as a heat source during winter and absorbing surplus heat in summer months.[4]
Air intake vents positioned just above the building’s base and near the rooftop draw in air that undergoes multiple filtration stages prior to ventilation.[7][9] These filters achieve a minimum efficiency reporting value of 15, effectively removing 95 percent of particulates, ozone, and volatile organic compounds—far surpassing the performance of comparable systems from the same era.[10]
Water conservation is a significant aspect of the building’s design, reducing consumption by approximately 45 percent compared to similar structures.[9] Rainwater is captured via a rooftop greywater system; with New York City’s average annual precipitation, this allows for collection of around each year.[4][11] Daily groundwater collection amounts to roughly .[11] Four storage tanks with capacities of each are strategically located throughout the building.[12] The harvested rainwater supports various uses including toilet flushing—all 300 toilets are equipped with dual-flush mechanisms.[13] Wastewater from toilets is discharged into the municipal sewage system; however, other water streams are treated and reused, resulting in a sewage outflow reduction of about 95 percent relative to comparable buildings.[9] None of the urinals require water for operation, saving approximately per urinal annually.[7]
Interior
Within the tower are three escalators and a total of 52 elevators, all produced by Schindler Group.[14] The elevators are divided into five groups: two banks accessible from ground level for general tenant use and three banks on the second floor reserved exclusively for Bank of America staff.[15] Four of these banks contain eight elevator cars each, while the fifth comprises six cars.[14] A destination dispatch system enhances passenger movement efficiency by enabling floor selection prior to entering an elevator cab.[14]
Lobby
The lobby, visible from Sixth Avenue and rising several stories, contains the elevator core along with security screening areas. It is adorned with high-end materials, including roughly of Jerusalem stone paired with cream-hued leather panels. The flooring consists of white granite sourced from Tamil Nadu, India, covering an area of , which includes tiles. Overhead, the ceiling is finished with carbonized bamboo, enhancing the design’s intention to harmonize with Bryant Park’s public environment.
Cookfox Architects selected dark oxidized stainless steel for elements such as the elevator entrances, security desks, and turnstiles, offering a stark contrast to the lighter metallic finishes used in other communal spaces. A distinctive arch measuring marks the main tenant elevator entryway. From a structural standpoint, the lobby’s columns are reinforced to bear extra loads if damaged, thereby improving the building’s overall durability.
Other lower-level spaces
Located at 43rd Street and Sixth Avenue just north of the lobby, the Urban Garden Room is accessible to the public as part of the city’s privately owned public space (POPS) initiative. Landscape designer Margie Ruddick created this area, featuring sculptures by her mother Dorothy Ruddick. The space is enclosed by glass walls that separate it from the lobby and contains plantings such as ferns, mosses, and lichen arranged on structures including a arch and a slab. Initially, the Durst Organization contemplated a full garden but ultimately dismissed it due to limited sunlight exposure. Following its 2010 opening, approximately 75% of the plants were replaced after experiencing die-off.
Henry Miller's Theatre, which did not have landmark status, was completely reconstructed to meet Americans with Disabilities Act of 1990 requirements and designed to achieve LEED Gold certification. The theater’s new design by Cookfox accommodates 1,055 seats—an increase from the original 955—and integrates artifacts salvaged from the original building. Reconstruction involved excavation extending to below street level in order to preserve the historic facade. To avoid interference with Bank of America’s trading operations above, the theater is acoustically isolated from upper floors.
At the base of the tower are multiple retail spaces including a Burger & Lobster restaurant that spans from basement to second floor and can be accessed through a pedestrian arcade connecting 42nd and 43rd Streets. This restaurant features windows overlooking 43rd Street, a lobster sculpture, and red dining booths. Additionally, a Bank of America branch operates at 115 West 42nd Street alongside a Starbucks located on the 43rd Street side.
Anita's Way is an enclosed pedestrian corridor running through the western end of the building, linking 42nd and 43rd Streets. Measuring wide and high, this passage serves as an entrance to the Stephen Sondheim Theatre while also functioning as a performance venue. Named in honor of Anita Durst—daughter of Douglas Durst and an arts leader at chashama—the walkway commemorates the organization’s previous presence on land cleared for this tower’s development.
Office space
Each office level is characterized by a ceiling height of and incorporates a raised floor system that conceals utilities and mechanical components beneath the surface.[16][17][18] The finished floor is elevated approximately above the concrete slab, while dropped ceilings above accommodate additional mechanical infrastructure.[19] Cooling is provided through an underfloor plenum distribution system.[9][7] At night, interior lighting accentuates the southeast chamfered corner, with upper floors extending up to .[20]
Occupying floors one through 36 plus the topmost level,[21] Bank of America's offices were crafted by Gensler.[22][23] The bank mandated illumination levels of 50 foot-candles, prompting the development of bespoke energy-saving fixtures equipped with dimmer functionality.[23] Workstations feature partitions standing tall, complemented by furnishings and carpeting in warm brown tones. Office layouts are organized into modules aligned with facade and ceiling divisions, while perimeter offices include furniture and opaque partitions arranged perpendicular to the curtain wall.[18] By 2013, Bank of America's trading floors occupied roughly one-third of the building's total space.[24][25]
Planning
The Durst family initiated property acquisitions on the block enclosed by Broadway, Sixth Avenue, and 42nd and 43rd Streets beginning in 1967, when Seymour Durst purchased a building that housed White's Sea Food Restaurant. Seymour intended to redevelop the area east of Times Square with office towers but abandoned these plans in 1973 due to a weakening office market. Subsequently, various proposals emerged for the site, including an unsuccessful early-1980s attempt to sell land to Joseph E. and Ralph Bernstein—later linked to Philippine dictator Ferdinand Marcos—which sparked disputes between the families. Other concepts included a Morgan Stanley tower proposed in 1987 before Black Monday and a Chemical Bank building in 1990.
In 1989, Seymour Durst installed the National Debt Clock on one of the site’s buildings. By 1990, he had acquired twenty parcels, including the Henry Miller Theater and Hotel Diplomat. After Seymour’s death in 1995, his son Douglas Durst continued purchasing land and developed 4 Times Square on the western portion during the late 1990s. Douglas’s daughter Anita utilized an empty storefront for her arts group chashama.
In 1998, New York City and state proposed using eminent domain to acquire remaining parcels for a Nasdaq headquarters project. The Bernsteins filed suit to prevent the seizure, leading to cancellation of the Nasdaq plan in 1999.
Early plans
In 1999, under Mayor Rudy Giuliani’s administration, Douglas Durst was encouraged to develop a tower alongside a Broadway theater seating approximately 1,500 on the site. Durst controlled about 85% of the block, with remaining lots owned by Joseph Bernstein, Susan Rosenberg, the Brandt family (owners of the Pix Theater), and Richard M. Maidman (owner of the Remington Building). Durst negotiated with the Brandts and entered discussions with real estate firm Tishman Speyer to co-develop the property. By late 2000, Durst and Tishman Speyer were close to finalizing plans for "1 Bryant Park," although Durst was still acquiring outstanding parcels.
By early 2001, only Bernstein’s, Maidman’s, and Rosenberg’s lots remained unsold; however, Bernstein and Maidman resisted selling to Durst. This prompted New York State’s Empire State Development Corporation to contemplate eminent domain acquisition. Bernstein’s company Triline Trading sued the state in April 2001, accusing it of colluding with Durst to suppress land values. Meanwhile, the Maidmans planned to convert their building into a hotel designed by Isaac Mizrahi, terminating a contract that would have granted Durst an option to purchase their property. In June 2001, Durst filed complaints regarding debris from Maidman’s building damaging his adjacent land.
Due to Durst’s failure to acquire Bernstein’s and Maidman’s parcels, two separate plots emerged: one at the corner of 42nd Street and Sixth Avenue surrounded by Bernstein’s holdings, and another near 113 West 42nd Street. The $600 million "1 Bryant Park" project was slated for the latter site with , while a $60 million thirty-story hotel was planned for the corner location. Despite setbacks following the September 11 attacks, Durst advanced with "1 Bryant Park," designed by Fox & Fowle Architects, expressing readiness for lower returns. He proposed state condemnation of Bernstein’s and Maidman’s lots to expand the tower; officials showed interest, leading Bernstein to withdraw his lawsuit against the state.
Bank of America and Final Development Plans
In December 2001, Richard Maidman consented to sell his property to Durst for $13 million. Although Maidman was in the process of converting his building into a hotel, he opted to sell amid the city's recovery following September 11, facilitating the creation of additional office space. Durst had obtained $115 million in financing from the Bank of New York and other lenders, allowing demolition to proceed prior to securing a tenant or construction loan. Susan Rosenberg occupied the corner at Sixth Avenue and 43rd Street until 2003 but was amenable to selling, preferring to be the final occupant. Durst also engaged in negotiations with Joseph Bernstein, who owned other parcels on the block. Fox & Fowle continued as architects into early 2003.
By March 2003, Bank of America was seeking a Midtown location to consolidate its New York City offices and considered Durst’s site near Bryant Park among options including Brookfield Properties. By May, Bank of America was close to finalizing a deal with Durst to lease half of the proposed tower. The city endorsed constructing the tower, while the state contemplated using eminent domain on remaining parcels, which faced resistance from Rosenberg and Bernstein’s associates who preferred negotiations over condemnation. Bernstein proposed redeveloping a 30-story hotel and offered Durst $40 million for the corner lot at 42nd Street and Sixth Avenue.
In mid-2003, Durst revealed intentions to apply for $650 million in tax-exempt Liberty bonds, intended for September 11 recovery efforts, to support construction funding. This application, alongside a similar request for the nearby New York Times Building, attracted public criticism. Opponents pointed to Durst’s political contributions to Governor George Pataki as potential conflicts and argued that bond proceeds should prioritize projects in Lower Manhattan more directly affected by the attacks. Despite objections, the New York City Industrial Development Agency approved the bond issuance. Bernstein opposed eminent domain for his property; nevertheless, state officials suggested Durst could exercise eminent domain on remaining lots if an anchor tenant was secured.
In December 2003, Durst and Bank of America announced their joint venture to develop a 51-story tower at 1 Bryant Park, designed by Cookfox Architects. The bank planned to occupy approximately half of the building’s 2.1 million square feet of office space. Bernstein and his partners agreed to sell their holdings for $46 million—equivalent to $384 per square foot—to Durst and Bank of America, leaving only the corner parcel at 43rd Street and Sixth Avenue outside their control. Bank of America’s commitment stimulated leasing interest from smaller firms and encouraged investment along 42nd Street between Bryant Park and Times Square. The project aligned with a broader trend of Times Square developments targeting financial services tenants.
Durst notified operators of Henry Miller's Theatre that it would be closed and demolished for construction purposes; the theater ceased operations in January 2004. By that month, Durst had acquired the final property needed and planned to relocate the National Debt Clock.
Construction
Durst and Bank of America obtained final authorization to issue Liberty Bonds for construction financing in February 2004. Due to elevated steel prices, construction was postponed until later that year. Tenants vacated by February, with demolition commencing in May. A groundbreaking ceremony was held on August 2, 2004, coinciding with heightened terror threat levels targeting major financial institutions—a timing Governor Pataki described as symbolic. A structural frame was erected to support Henry Miller's Theatre facade; its interior was carefully dismantled using hand tools and vibration monitoring.
Following commencement of construction, Durst reported robust demand for remaining office space. While Bank of America’s leased space cost below $100 per square foot, other tenants were willing to pay rents exceeding that figure. Law firm Cravath, Swaine & Moore expressed interest in early 2005. Bank of America pursued additional space near its existing offices and leased an extra 522,000 square feet in early 2006, bringing its total leased area to 1.6 million square feet. The bank planned six trading floors plus floors one through thirty-six along with the penthouse; only about 450,000 square feet remained available.
By late 2006, law firm Akin Gump Strauss Hauer & Feld signed leases at rents above $100 per square foot. Generation Investment Management—co-founded by Al Gore—also became a tenant. By mid-2007, pre-leasing neared completion with average asking rents reaching $150 per square foot. In May 2007, Durst and Bank of America announced intentions to refinance $650 million in Liberty Bonds; however, refinancing was delayed over a year due to the financial crisis beginning in 2008. The building reached its full height on June 26, 2007.
In October 2007, a crane accident caused structural damage and injuries, leading city authorities to temporarily halt construction activities. The spire was installed by December 15, 2007. By mid-2008, scaffolding around Henry Miller's Theatre facade was removed. That year saw several incidents: in August, a glass panel weighing approximately 1,500 pounds fell and injured two pedestrians; investigations led the New York City Department of Buildings to issue violations. In September, falling debris damaged facade panels without causing injuries. In November, a worker suffered injuries after falling from scaffolding.
Opening
The initial occupants began moving into the Bank of America Tower in 2008. By June 2009, the building underwent refinancing through a $1.28 billion arrangement led by Bank of America, which replaced the earlier Liberty Bonds financing. Later that year, the base of the tower welcomed the Aureole restaurant alongside Henry Miller's Theatre, which was subsequently renamed the Stephen Sondheim Theatre. By January 2010, the building's name was prominently displayed at its entrances.
Durst and Bank of America hosted an official grand opening in May 2010, where Al Gore commended Mayor Michael Bloomberg and other key contributors to the project. The tower achieved LEED Platinum certification—while the theater portion earned LEED Gold—making it the first office building in the United States to receive platinum status. At that point, its valuation stood at approximately $2.2 billion. Shortly thereafter, Durst and Bank of America refinanced $1.275 billion in construction loans by utilizing Liberty bonds and a commercial mortgage-backed security (CMBS) loan from Bank of America and JPMorgan Chase.
2010s to present
Prior to the construction of the Bank of America Tower, the neighborhood was characterized by discount retailers and areas occupied by homeless encampments; however, the tower’s completion significantly altered the landscape. After opening, asking rents for properties around Bryant Park surged to $100 per square foot. Despite holding platinum LEED certification, reports indicated that the building’s total energy consumption was double that of the Empire State Building, largely attributed to intensive usage on trading floors.
Among early retail tenants was Starbucks, which launched a location within the tower in 2011. During Hurricane Sandy in 2012, the building experienced a power outage due to its unique connection to a downtown electrical substation. In 2013, the Durst Organization collaborated with Brooklyn Grange Rooftop Farm to place honeybee hives atop the roof. That same year saw leases signed by asset managers QFR Management and TriOaks Capital Management, insurance underwriter Ascot Underwriting, and hedge fund QFR. By 2016, Burger & Lobster secured three floors for a restaurant adjacent to the Stephen Sondheim Theatre, bringing the tower to full occupancy.
In 2019, Durst and Bank of America refinanced the property with a $1.6 billion loan package—comprising $950 million in CMBS from Bank of America and $650 million in Liberty Bonds. Bank of America continued as the largest tenant; other notable occupants included Marathon Asset Management, law firm Akin Gump Strauss Hauer & Feld, and Roundabout Theatre Company. The building’s valuation exceeded $3.5 billion that year, placing it among New York City’s highest-valued office assets. Starbucks renewed its lease towards the end of 2020. That year also marked the closure of Aureole restaurant, which was succeeded by Charlie Palmer Steak.
Reception
During its development phase, The Village Voice described the tower as "alien" due to its reflective mirrored façades. The New York Times' David W. Dunlap characterized it as "a three-dimensional reminder that big banks now dominate New Yorkers' consciousness." Justin Davidson from New York magazine labeled it "a bulky glass stele," noting that a subtle twist added elegance to its form. On the other hand, Times architectural historian Christopher Gray viewed the tower as emblematic of Bryant Park’s evolution into a branded destination. Another writer for The Times remarked that the skyscraper provided both a "psychological and economic lift" for New York City in the aftermath of 9/11.
The environmental advancements incorporated into the Bank of America Tower were showcased in a 2006 exhibit at the Skyscraper Museum and featured in a 2008 podcast produced by the New York Academy of Sciences. In November 2008, a National Geographic Channel documentary focused exclusively on this building.
In June 2010, the tower was honored with the Best Tall Building Americas award from the Council on Tall Buildings and Urban Habitat. Additionally, it received an Award of Merit at the 2011 Annual Lumen Gala for outstanding achievements in lighting within New York City’s industry.
See also
- Architecture and buildings of New York City
- List of tallest skyscrapers in New York City
- Tallest skyscrapers in the United States
Sources
External links
- Bank of America Tower at the Durst Organization official site
- ↑ 1.0 1.1 1.2 Cite error: Invalid
<ref>tag; no text was provided for refs namedCOOKFOX 2021 - ↑ 2.0 2.1 Cite error: Invalid
<ref>tag; no text was provided for refs namedArchDaily 2012 - ↑ 3.0 3.1 Cite error: Invalid
<ref>tag; no text was provided for refs namedCrosbie 2010 2 - ↑ 4.0 4.1 4.2 4.3 4.4 Cite error: Invalid
<ref>tag; no text was provided for refs namedDi Justo p. 28 - ↑ Appelbaum, 2009
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedemporis2 - ↑ 7.0 7.1 7.2 7.3 Cite error: Invalid
<ref>tag; no text was provided for refs namedDi Justo p. 29 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namednyt20121104 - ↑ 9.0 9.1 9.2 9.3 9.4 Cite error: Invalid
<ref>tag; no text was provided for refs namedCrosbie 2010 3 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedBarista p. 32 - ↑ 11.0 11.1 Cite error: Invalid
<ref>tag; no text was provided for refs namedNYREJ 2010 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedp215465083 - ↑ Field, 2012
- ↑ 14.0 14.1 14.2 Cite error: Invalid
<ref>tag; no text was provided for refs namedElliott p. 5 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedOMINY p. 29 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedvda - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedSnoonian p. 44 - ↑ 18.0 18.1 Cite error: Invalid
<ref>tag; no text was provided for refs namedAL p. 55 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedSINY p. 26 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedg188646833 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedp216343760 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedDetail-online.com 2020 - ↑ 23.0 23.1 Cite error: Invalid
<ref>tag; no text was provided for refs namedAL p. 52 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedThe New Republic 2013 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedWalsh 2013
- Articles with short description
- 42nd Street (Manhattan)
- Bank of America buildings
- Bryant Park buildings
- Leadership in Energy and Environmental Design platinum certified buildings
- Office buildings completed in 2009
- Sixth Avenue
- Skyscraper office buildings in Manhattan
- Sustainable buildings in the United States
- Times Square buildings
- Bank buildings in Manhattan
- Pages with reference errors