Jump to content

Big Sandy Power Plant

From Alfawiki
Adapted from the English Wikipedia article Big Sandy Power Plant, available under CC BY-SA 4.0Updated 7 August 2025
Big Sandy Power Plant
Company typePower plant
IndustryEnergy
Founded1963
Headquarters
Louisa
,
United States
Area served
Over 175,000 customers
ProductsElectricity generation (268 MW capacity)
OwnerKentucky Power Company (a division of American Electric Power)
Number of employees
135

The Big Sandy Power Plant is a natural gas facility with a generating capacity of 268 megawatt (MW), owned and managed by Kentucky Power Company, a division of American Electric Power (AEP). It is situated along the Big Sandy River close to Louisa, Kentucky. Originally commissioned in 1963, the plant converted from coal to natural gas operations in 2016.

Plant Data

  • Workforce: 135 personnel
  • Number of customers served: over 175,000

Emissions Data

  • CO2 emissions in 2006: 6,830,275 tons
  • SO2 emissions in 2006: 46,476 tons
  • NOx emissions in 2006: 13,851 tons
  • Mercury emissions in 2005: 281 pounds

In 2009, the facility was ranked 40th among the top 100 coal-fired plants nationwide for Coal Combustion Waste (CCW) stored in surface impoundments, having released 915,079 pounds of such waste in 2006. The EPA designated its Fly Ash impoundment as having a High Hazard Potential Rating in June 2009 due to possible consequences if the dam were to fail; however, the probability of failure was not evaluated.

These emissions and waste figures are derived from the EPA's 2006 Toxics Release Inventory (TRI).

Conversion to natural gas

In 2011, AEP, the plant's owner, announced intentions to transition from coal to natural gas with goals of lowering fuel expenses, reducing greenhouse gas output, and decreasing airborne pollutants. The following year, AEP proposed a $1 billion modernization project aimed at continuing coal use and requested approval from Kentucky regulators for a 30% increase in electricity rates to finance this plan.

The conversion to natural gas was finalized on May 30, 2016. Afterwards, on September 24, 2016, Unit 2's cooling tower was brought down through implosion.

External links