Jump to content

Brae oilfield

From Alfawiki
Adapted from the English Wikipedia article Brae oilfield, available under CC BY-SA 4.0Updated 10 August 2025
Brae field
Company typeOil and gas field
IndustryPetroleum
Founded1974
FounderPan Ocean
Headquarters
United Kingdom (Scottish waters)
Area served
North Sea
Key people
TAQA Bratani (operator)
ProductsOil, natural gas, natural gas liquids

The Brae field is an oil reservoir located in Scottish waters, its name derived from a Scots term meaning hillside. Discovered in 1974 by well 16/7-1, which was drilled using the semi-submersible rig Odin Drill on behalf of operator Pan Ocean, this field lies within UKCS block 16/7a and is currently operated by TAQA Bratani.

This field consists of three main accumulations containing roughly 70 million tonnes of oil liquids alongside 22 cubic kilometres of natural gas. Production activities are centered on primary platforms that exploit the reserves beneath, with continuous infill drilling aimed at recovering remaining undrained zones. The operational lifespan of these platforms is extended through several subsea tieback developments. Gas extracted from the field is transported to St Fergus in Scotland via the SAGE pipeline, while oil is delivered through the Forties pipeline system.

Field reservoirs

The hydrocarbon reservoirs within the Brae field exhibit the following characteristics:

Brae field reservoir properties
Field Brae South Brae Central Brae North
Reservoir Upper Jurassic sandstones Upper Jurassic formations
Depth 12,000–13,500 ft Approximately 12,000 ft
Oil column thickness 1,500 ft
API gravity 37° 33° 47° (NGL)
Sulfur content 0.64 % 0.64 %
Gas Oil Ratio (GOR) 1,400 scf/bbl 5,000 scf/bbl
Carbon dioxide concentration Up to 35% 8 %
Pressure and temperature conditions 7,200 psi, 240 °F 7,000 psi, 240 °F
Bubble point pressure 3,688 psi
Recoverable oil reserves 267 million barrels; 40 million tonnes 65 million barrels; 9 million tonnes 204 million barrels; 21 million tonnes
Recoverable natural gas liquids (NGL) 33 million barrels NGL 6 million barrels
Recoverable gas volumes 155 billion cubic feet 682 billion cubic feet; 22 billion cubic metres

Topside facilities

The topside facilities for Brae Alpha (Brae South) were engineered by Matthew Hall Engineering after securing the contract in August 1979. The platform was equipped with 19 wells dedicated to oil production, 14 water injection wells, two gas injection wells, and provision for 11 additional slots. Its production capacity reached up to 100,000 barrels of oil per day, alongside 12,000 barrels per day of Natural Gas Liquids (NGL) and 4.25 million standard cubic metres of gas daily. Two parallel production trains incorporated three-stage separation processes, with the initial stage operating at a notably high pressure of 248 bar. Power generation relied on four Rolls-Royce SK-30 gas turbines rated at 25 MW each. Accommodation facilities supported up to 240 personnel distributed over 14 topside modules with a total weight of approximately 31,000 tonnes.

Brae Bravo (Brae North) topsides were also designed by Matthew Hall Engineering following a contract awarded in October 1983. Initially installed were 12 oil production wells, three gas injection wells, and space for 19 spare slots. The platform’s capacity allowed for processing 75,000 barrels of liquid hydrocarbons daily and handling 11.3 million standard cubic metres of gas per day. It featured a single production train with four-stage separation beginning at a first-stage pressure of 103 bar. Electrical power was supplied by three Rolls-Royce/GEC ERB-124C gas turbines each rated at 24 MW. Accommodation was provided for 240 personnel within 21 modules weighing a combined total of around 33,000 tonnes.

East Brae’s topsides were designed under an October 1988 contract with Matthew Hall Engineering as well. The initial configuration included 13 oil wells, four gas injection wells, and capacity for 13 spare slots. Production capability amounted to 120,000 barrels of liquid hydrocarbons and 17.6 million standard cubic metres of gas daily. This platform operated a single production train with three-stage separation beginning at a first-stage pressure of 102 bar. Electric power was supplied through subsea cables from Brae Alpha and Bravo platforms. Accommodation supported up to 160 personnel with topsides weighing roughly 18,500 tonnes.

Brae platforms – construction details
Platform installation Fabrication contractor Construction site Installation date
Brae Alpha McDermott Scotland Ardersier yard April 1982
Brae Bravo McDermott Scotland Ardersier yard June 1987
Brae East Trafalgar House Offshore Fabricators Methil yard May 1993
Topsides weight |32,000 tonnes |40,000 tonnes |- Accommodation capacity |240 |240 |- Well slots available |46 |34 |- Planned wells |14 producers; 14 water injection; 2 gas injection |12 production; 3 gas injection |- Installation date |June 1982 |1987 |- Production commencement |July 1983 |1988 |}

See also

External links

Key facts about Brae platforms
Platform Brae Alpha Brae Bravo
Platform type Steel jacket Steel jacket
Primary functions Drilling, production, accommodation Drilling, production, accommodation
Coordinates 58°41’33”N 01°16’54”E 58°47’32”N 01°20’51”E
Water depth 112 m 99.5 m
Jacket mass 18,600 tonnes 22,000 tonnes
Number of legs 8 8
Pile count 36 36