CPS Energy

From Alfawiki
CPS Energy
Company typeMunicipal utility
IndustryElectric utility, Natural gas utility
PredecessorSan Antonio Public Service Company
Founded1917
FounderAmerican Light and Traction (original owner)
Headquarters
San Antonio
,
United States
Area served
Bexar County and portions of seven adjacent counties, Texas, United States
Key people
Board of five trustees including the mayor of San Antonio (ex officio)
ProductsElectricity, Natural gas
ParentCity of San Antonio
Websitewww.cpsenergy.com

CPS Energy—previously known as the City Public Service Board of San Antonio—functions as the municipal electric utility provider for San Antonio, Texas. Since its acquisition by the city in 1942, CPS Energy has expanded its service to more than 840,750 electricity customers and over 352,585 natural gas users throughout its coverage area, which includes Bexar County along with portions of seven adjacent counties.

History

  • 1917 – Formation of San Antonio Public Service Company under ownership of American Light and Traction
  • 1942 – City acquires SAPSCo for $34 million, renaming it City Public Service
  • 2005 – Transitioned branding to CPS Energy
  • 2010 – Commencement of operations at J.K. Spruce 2 coal-fired power facility
  • 2012 – Acquisition of Rio Nogales combined-cycle natural gas plant located in Seguin
  • 2017 – Celebrated 75 years under municipal ownership
  • 2018 – Retired J.T. Deely coal plants Units #1 and #2 after four decades plus two years in operation

Generation sources

By May 2015, CPS Energy had secured contracts for 1,059 MW of wind energy and 444 MW of solar capacity.

Plant Name Type Rated Capacity Year Completed Cost Notes
Blue Wing Solar Project Solar-PV 14.4 MW 2010 Collaboration with Duke Energy
South Texas Project Unit 1 Nuclear 1250 MW 1987 $2.25 Billion 40% stake shared with NRG Energy and Austin Energy
South Texas Project Unit 2 Nuclear 1250 MW 1988 $2.25 Billion 40% ownership alongside NRG Energy and Austin Energy
J.K. Spruce Power Plant Unit 1 Coal-Fired 556 MW 1992 Situated at Calaveras Lake
J.K. Spruce Power Plant Unit 2 Coal-Fired 780 MW 2010 $1 Billion Located at Calaveras Lake; initially designed for 750 MW but capable of producing up to 780 MW
O. W. Sommers Natural Gas 892 MW 1972 Positioned at Calaveras Lake
Leon Creek Power Plant Natural Gas 417 MW 1949
Desert Sky Wind Farm Wind 160.5 MW 2001 Owned by American Electric Power, with CPS Energy purchasing all output
Rio Nogales Natural Gas 800 MW 2002 Located in Seguin; acquired in 2012 as a replacement for the coal-fired J.T. Deely facility
Braunig Power Station Natural Gas 1138 MW 1966 Situated at Victor Braunig Lake

Previous generation facilities include the coal-fired J.T. Deely Power Plant Units 1 and 2 with capacities of 486 MW and 446 MW respectively, which were retired in 2018; the W.B. Tuttle natural gas plant (425 MW), which was dismantled in 2011; and the Comal Power Plant, operational from 1925 until its closure in 1973 prior to redevelopment.

Governing structure

The governance of CPS Energy is managed by a board consisting of five trustees. The mayor of San Antonio serves automatically as an ex officio member during their mayoral term. The remaining four trustees each represent one of the city's geographic quadrants and are required to reside within their respective districts. These trustees are nominated by sitting board members for terms lasting five years, with the possibility of one renewal, pending confirmation by the San Antonio City Council.

Additionally, a Citizens Advisory Committee comprising fifteen members facilitates communication between CPS Energy and its customer base. Ten committee members are nominated through city council districts while five are selected from applicants interviewed by the Board. All committee participants must live within CPS Energy’s service boundaries and be customers themselves. The entire committee is subject to approval by the Board.