Central Chubut Railway
| Company type | Private company (British-owned) |
|---|---|
| Industry | Railway transport |
| Founded | 1884 |
| Founder | Lewis Jones, Asahel P. Bell |
| Defunct | 1958 |
| Fate | Nationalised and later closed |
| Successor | Ferrocarriles Patagónicos (Argentine State Railway), later General Roca Railway |
| Headquarters | Liverpool (company base) , United Kingdom |
Area served | Chubut Province, Argentina |
Key people | Lewis Jones, Asahel P. Bell, Jones Williams (engineer) |
| Products | Railway transportation services |
| Owner | British shareholders |
The Central Chubut Railway (in Spanish, Ferrocarril Central del Chubut) was a British-owned enterprise responsible for constructing and operating a rail line in Argentina's Chubut Province, located within the Patagonia region, during the late 1800s.
Origins
In 1884, Welsh immigrant Lewis Jones secured a concession from the Argentine authorities to develop and manage a railway linking the Chubut River valley with Puerto Madryn, situated on the southern coast of Península Valdés. To fund the project, Jones joined forces with engineer Asahel P. Bell and formed a company based in Liverpool.
The initiative received official approval through Law No. 1539 in October 1884. Construction commenced in 1886 under the supervision of engineer Jones Williams, advancing concurrently from both Puerto Madryn and Trelew. The labor force consisted of local workers alongside immigrants from Italy, Spain, Syria, Wales, and other nations.
On 11 November 1888, the first segment—spanning 70 km between Trelew and the quay at Puerto Madryn—was inaugurated, introducing the area’s inaugural telephone line. This railway dramatically shortened travel time from 20 hours on horseback to approximately 2 hours by train. Subsequent extensions included the Trelew to Gaiman stretch (50 km), opened on 31 December 1908, followed by an extension to Dolavon on 12 October 1915. Additionally, in 1910, a 450-meter-long dock was completed at Puerto Madryn, with its railway station finalized three years later.
Nationalisation
The company underwent nationalisation in 1920, becoming part of the Ferrocarriles Patagónicos division within the Argentine State Railway system. Track expansions reached Las Plumas, and in 1922 the CCR’s track gauge was altered to . Further development included branches extending to Rawson and Playa Unión in 1923, and in 1945 a spur line from Las Chapas to the Florentino Ameghino levee was established to transport roughly 1,500 tons of cement monthly from Comodoro Rivadavia.
Plans to extend the line from Las Plumas to Paso de Indios were abandoned due to reported technical difficulties. Other proposed expansions aimed at linking CCR with Trevelin and Esquel—connecting with the La Trochita railway—and further integrating it with the Comodoro Rivadavia Railway to reach Comodoro Rivadavia city. There were also intentions to procure diesel locomotives and construct a broad gauge route from Puerto Madryn to Sierra Grande to interface with the Nahuel Huapi railway near San Antonio Oeste.
Some accounts attribute resistance to expansion by British settlers intent on preserving Patagonia for sheep farming activities; others point to opposition from the livestock firm "La Argentina Southern Land Company," which declined involvement citing poor soil conditions that hindered financial backing.
Following the nationwide railway nationalisation of 1948 in Argentina, CCR was incorporated into the General Roca Railway, one of six divisions operating under state-owned Ferrocarriles Argentinos.
A report from 1949 indicated that CCR transported fewer than half the passengers carried by Comodoro Rivadavia Railway while moving comparable freight volumes as the Puerto Deseado Railway. Passenger traffic peaked at 197,936 in 1948 but declined to 161,805 in 1949 due to flooding disruptions. In 1950, government investments included acquiring a railcar for the Trelew-Rawson service, constructing housing for workers in Puerto Madryn and Trelew, renewing track infrastructure, and enhancing dock facilities at Puerto Madryn.
Decline and cessation
The railway's narrow gauge, originally set at 1,000 mm during Welsh administration and later reduced to 750 mm under government management, hindered its integration with Argentina's wider rail system. According to a 1960 assessment, operational expenses reached A$42,876,527 while income was merely $7,867,092. The volume of freight transported plummeted from 70,931 tons in 1956 down to 29,339 tons by 1960, primarily due to the rise of road transportation competition.
During Arturo Frondizi's presidency, the railway ceased operations in 1958. By 1961, portions of the rolling stock were sold off for spare parts, and others were reassigned to La Trochita. Efforts to restart service in 1964 met resistance from regional bus operators; following a fire that destroyed 15 coaches stored in Trelew warehouses, these revival plans were ultimately abandoned. The tracks were removed between 1969 and 1974. Nonetheless, by 1975, some assets—including three locomotives built by Henschel & Son along with freight cars—remained intact.
After closure, various station buildings were adapted for alternative purposes: Trelew and Puerto Madryn stations were converted into bus terminals; Trelew and Gaiman stations now function as museums; Playa Unión station operates as a police facility; and stations stretching from Campamento Villegas to Las Plumas have been transformed into agricultural properties.