Company typePrivate
IndustryRail transport
FoundedMay 11, 1889; 137 years ago (1889-05-11)
FateDiscontinued
Headquarters
Bellefonte
,
United States
Key people
J. Wesley Gephart (general superintendent, president), Walter L. Ross (president), Charles Clement (president), Wallace H. Gephart (general superintendent, president)
ProductsFreight rail service (iron manufacturing shipments)

The Central Railroad of Pennsylvania was a brief 27.3-mile rail line that connected Bellefonte, Pennsylvania with the Beech Creek Railroad—a segment of the New York Central system—at Mill Hall, Pennsylvania. Its primary freight consisted of shipments originating from Bellefonte's iron manufacturing sector; however, the shutdown of local iron furnaces resulted in the railroad's discontinuation in 1918.

Origins

Established on May 11, 1889, the Central Pennsylvania Railroad was designed to link Unionville with Mill Hall by way of Bellefonte and the Nittany Valley. Subsequently, on December 11, 1890, the Central Pennsylvania Railroad Eastern Extension was formed to extend the line from Lamar to White Deer Township, aiming to establish connections not only with the New York Central at Mill Hall but also with the Philadelphia and Reading Railway.

These two entities consolidated on September 11, 1891. Despite this merger, the initial backers from Watsontown, Pennsylvania encountered difficulties progressing construction. Samuel H. Hicks, who served as president and general manager of the Wilkes-Barre and Western Railway, spearheaded efforts but managed only to grade approximately half a mile of track by mid-1892. Additional investors from Philadelphia and New York—including Robert C. Bellville and attorney Charles M. Clement—joined the board; nevertheless, funding remained inadequate.

A pivotal change occurred with J. Wesley Gephart, a Bellefonte entrepreneur and president of the Valentine Iron Company. Confronted with steep freight charges imposed by the Pennsylvania Railroad's monopoly, Gephart convinced Valentine Iron’s stakeholders that establishing an independent rail outlet was crucial for maintaining profitability. The Central Railroad was selected as their vehicle for this purpose. Local subscriptions contributed $75,000 toward construction costs, while the majority of financing derived from $600,000 in fifteen-year bonds underwritten by Drexel and Company.

In early 1893, representatives from Drexel joined the board. Banker Walter L. Ross assumed the presidency; Hicks was reassigned as vice-president; William J. McHugh took on roles as secretary and treasurer. Other board members included William M. McLaughlin and Charles O. Kruger alongside remaining original directors.

In June 1893, Gephart was appointed general superintendent to manage construction activities. Although plans for the eastern extension were abandoned, the stretch between Mill Hall and Bellefonte was completed and commenced operations on December 2, 1893.

Following this strategic redirection, original investors Hicks and Higbee from Watsontown resigned from the board in 1894. Their positions were filled by Charles W. Wilhelm of Reading (vice-president), Edward L. Welsh from Philadelphia, and Robert Valentine representing Valentine Iron. Later that year, McLaughlin succeeded Kruger on the board.

Route

The railroad featured these stations along its route:

Name Mileage Notes
Mill Hall 0.0 Junction with Beech Creek Railroad
Salona 2.1 station still standing today
Cedar Springs 2.6
Mackeyville 4.7
Kriders Siding 7.0
Clintondale 9.1
Lamar 10.1
Huston 11.3
Nittany 12.1
Snydertown 13.2 station preserved today after relocation to Centre Hall
Hublersburg 15.2
Dunkles 17.0
Hecla Park 18.1 opened in 1894 as an amusement park on former Hecla Furnace site
Zion 20.3
Nigh 23.1
Bellefonte 27.3 situated near Lamb Street along Spring Creek's edge

The railroad traversed Bald Eagle Mountain through the Fishing Creek water gap (Fishing Creek) and proceeded southwest across the flat terrain of Nittany Valley toward Bellefonte. It linked with the Nittany Valley Railroad approximately three miles east of Bellefonte before descending through Armor Gap to Spring Creek and entering Bellefonte’s downtown area. The enginehouse was positioned north of Bellefonte near Spring Creek; an interchange with the Pennsylvania Railroad facilitated service to American Lime and Stone Company's facilities located in Armor Gap.

Operations

In 1895, the railroad encountered a major obstacle when the Centre Iron Company’s exclusive shipping agreement with the Pennsylvania Railroad (PRR) was contested following its acquisition by Valentine Iron, which redirected shipments to the Central Railroad. Although initially victorious in court, Gephart ultimately lost on appeal, leading to his resignation as president of Valentine Iron; however, he continued his involvement with the Central Railroad.

Despite this challenge, the Central Railroad proceeded with infrastructure enhancements, notably replacing its final wooden trestle with a fill and iron bridge in 1896. Leadership transitions occurred as Walter Ross stepped down as president in 1899, with Charles Clement taking over the role.

In May 1899, Gephart re-engaged in iron production by founding the Bellefonte Furnace Company to resume operations at Coleville, utilizing ore from nearby mines and former Carnegie sites at Scotia. To support the furnace and transport limestone from quarries in Salona, he constructed an extension of the Central Railroad that crossed Spring Creek.

Gephart also played a role in establishing the Bellefonte and Clearfield Railroad in 1895, intended to link Milesburg to Clearfield and provide a route independent of PRR to coal mines and coke ovens; however, this line was never realized.

The railroad gained from local timber activities: between approximately 1899 and 1902, the McNitt brothers operated a narrow gauge logging railway originating at Hecla Park. After forming a partnership with E.M. Huyett in 1902, operations shifted to Snydertown where a new logging line remained active until 1909.

From 1902 to 1903, Edward Welsh succeeded Charles Wilhelm as vice-president. In 1903, traffic from Bellefonte Furnace was redirected exclusively through the Central Railroad of Pennsylvania. That same year, a fire destroyed the company’s enginehouse and damaged two locomotives; reconstruction was completed in 1904.

The discovery and exploitation of Mesabi Range iron ore deposits gradually replaced local sources, while large steel mills dominated production, rendering furnaces like Bellefonte obsolete. The unexpected death of founder Wes Gephart in 1905 further weakened prospects; his son Wallace H. Gephart took over as general superintendent. Charles Clement resigned as president in 1909, with Wallace Gephart assuming that position along with other leadership responsibilities.

The shutdown of Bellefonte Furnace in 1910 followed by Nittany Furnace in 1911 resulted in significant traffic decline for the Central Railroad. Passenger services ceased in November 1918; tracks between Bellefonte and Salona were dismantled in 1919. The segment from Mill Hall to Salona was operated by New York Central (NYC) as a siding until the 1950s to serve limestone quarry operations. The enginehouse and adjacent rail line were later repurposed by American Lime and Stone.