The Diablo Canyon Power Plant, situated near Avila Beach, California within San Luis Obispo County, California, stands as the only active nuclear power station in California following the 2013 shutdown of the San Onofre Nuclear Generating Station. It also holds the distinction of being the largest single generating facility in the state. During its construction phase, the plant encountered considerable resistance, resulting in nearly two thousand arrests over a span of two weeks in 1981.
Owned and operated by Pacific Gas & Electric (PG&E), Diablo Canyon comprises two four-loop pressurized-water reactors designed by Westinghouse, delivering a combined electrical output close to 2,256 MW. Together, these reactors produce roughly 18,000 GWh annually, providing electricity to more than three million customers. This accounts for approximately 8.6% of California’s total electricity generation and nearly 25% of its carbon-free energy supply. The plant’s average generation cost is about six cents per kilowatt-hour, which is lower than PG&E’s 2014 average purchase price of 10.1 cents per kilowatt-hour from other sources.
Despite being located near the Shoreline and Hosgri fault lines—faults that were not identified during the plant’s construction—the Nuclear Regulatory Commission (NRC) conducted a seismic risk evaluation in 2016. This assessment estimated a core damage frequency of one event per 7.6 million reactor years, indicating strong earthquake resistance measures are in place. Diablo Canyon falls under the jurisdiction of NRC Region IV.
In 2016, PG&E revealed plans to retire both reactors by 2024 and 2025, citing California’s renewable energy mandates that favor variable energy sources over nuclear power. This shift challenges the plant’s economic sustainability by restricting continuous operation. Analysts from the California Independent System Operator (CAISO) cautioned that shutting down Diablo Canyon could undermine grid stability and increase reliance on fossil fuels, thereby threatening California’s greenhouse gas reduction goals. Both the California Energy Commission and CAISO have projected possible summer power shortages resulting from Diablo’s closure combined with natural gas plant retirements and diminished hydroelectric imports due to ongoing drought conditions.
A collaborative report by MIT and Stanford published in 2021 found that prolonging Diablo Canyon’s operational life until 2035 would reduce state electricity-related carbon emissions by 11% annually, yield cumulative savings of $2.6 billion (which could grow to $21 billion if extended to 2045), and improve grid reliability. The decommissioning process is expected to last several decades with an estimated cost of around $4 billion.
Operation
The Diablo Canyon Power Plant occupies roughly near Avila Beach, California, with its primary power generation facilities covering about . PG&E holds ownership over approximately of land at this location.
Unit One
Unit One is a Westinghouse-supplied pressurized water reactor rated at 1138 MWe. It commenced operations on May 7, 1985, and holds a license valid until November 2, 2024. In 2006, this unit produced 9,944,983 megawatt-hours with an impressive capacity factor of 99.8%.
Unit Two
Unit Two is another Westinghouse reactor with a capacity of 1118 MWe. It began service on March 3, 1986, and its license extends through August 20, 2025. In 2006, it generated 8,520,000 megawatt-hours at an 87.0% capacity factor.
Cooling
The facility employs a once-through cooling (OTC) system that draws seawater from the Pacific Ocean to condense steam from turbines. Engineered for complete water recirculation and minimal environmental disturbance, the reactors can reduce intake during storm surges to protect kelp beds. The temperature of discharged water is limited to no more than above ambient ocean levels.
California’s OTC plants utilize filtration techniques to lessen aquatic organism entrainment. In a 2013 ranking of bio-fouling and larval impact among state power plants, Diablo Canyon placed thirteenth; fossil-fueled gas plants at Moss Landing exhibited greater ecological effects. In 2014, the California Water Board reviewed the potential expenses involved in converting Diablo Canyon to use cooling towers—a subject that remains contentious—with some stakeholders proposing artificial reef creation as compensation for environmental impacts.
Electricity production costs
While the exact pricing has not been publicly revealed by the plant’s operator, it is reported that Diablo Canyon generates electricity at approximately 6 cents per kilowatt-hour. This rate is notably lower than the 2014 average of 10.1 cents per kilowatt-hour that PG&E paid to other energy suppliers.
Workforce
Diablo Canyon employs roughly 1,200 PG&E personnel alongside about 200 subcontracted workers. Labor unions including the International Brotherhood of Electrical Workers (IBEW) and the International Association of Machinists represent these employees. Routine refueling outages and maintenance activities create over 1,000 temporary jobs, providing a significant boost to the surrounding economy. The workforce utilizes generative artificial intelligence tools to effectively handle large volumes of documentation.
History
Pacific Gas & Electric Company faced a six-year process involving hearings, referendums, and legal disputes before Diablo Canyon was approved. Earthquake safety was a major issue; although initially considered secure in 1968, the Hosgri fault was identified offshore by the time construction finished in 1973. This fault had previously generated a magnitude 7.1 earthquake in 1927, posing considerable seismic risks.
To address these concerns, PG&E reinforced structural designs to enhance earthquake resilience. In 1981, an error was discovered in the blueprints for the second reactor—they were not reversed as intended. Despite this and other design challenges, the Nuclear Regulatory Commission (NRC) reaffirmed its safety approval from 1978 in 1982.
PG&E and NRC officials also tackled worries about potential fuel rod leaks during seismic events, asserting that such occurrences are anticipated and managed within safety protocols. Further seismic investigations did not delay the renewal of operating licenses.
An NRC assessment from August 2010 estimated that the annual probability of an earthquake causing core damage at Diablo Canyon stands at roughly one in 23,810.
In 2009, PG&E sought a 20-year license extension for both reactors from the NRC. Following the Fukushima disaster in 2011, PG&E requested postponement of license issuance until new seismic analyses—expected to take three years—were completed.
On June 24, 2013, a transmission failure led to loss of offsite power to Diablo Canyon’s startup transformers. Both units continued operating powered by their turbine generators; emergency diesel generators activated as a precaution but did not carry load, ensuring continuous electricity delivery via the 500 kV grid.
Community involvement and opposition
The construction of Diablo Canyon faced significant legal opposition and acts of civil disobedience from anti-nuclear groups such as the Abalone Alliance. In 1981, protests resulted in approximately 1,900 arrests—the largest number associated with anti-nuclear activism in U.S. history—including that of musician and activist Jackson Browne.
In 2011, State Senator Sam Blakeslee and U.S. Representative Lois Capps called for renewed safety evaluations. Representative Capps urged the NRC to suspend license renewals until independent seismic assessments of nearby faults were completed. The Alliance for Nuclear Responsibility petitioned to stop relicensing altogether, while local organizations like Mothers for Peace advocated for shutting down the facility.
Post-Fukushima developments
In the aftermath of the Fukushima Daiichi incident, concerns about the seismic and tsunami vulnerabilities of Diablo Canyon escalated. Unlike Fukushima’s elevation of approximately 20 feet above sea level, Diablo Canyon is situated at an elevation of 85 feet. A comprehensive nationwide assessment by the NRC concluded that Diablo Canyon is well-equipped with robust systems and protocols to withstand extreme events.
On June 2, 2011, the NRC postponed the environmental review process for Diablo Canyon’s relicensing while completing its safety assessment. The Atomic Safety Licensing Board deferred scheduling changes related to objections raised by San Luis Obispo Mothers for Peace. Both PG&E and this group regarded the delay as a procedural achievement.
S. David Freeman, former GM of Sacramento Municipal Utility District, criticized the ongoing operation of Diablo Canyon, characterizing nuclear energy as expensive and hazardous. He referred to both Diablo Canyon and the decommissioned San Onofre plant as potential "disasters waiting to happen," highlighting their aging infrastructure, proximity to active fault lines, and dense coastal populations in California.
Closure extension
In January 2016, several contributors to An Ecomodernist Manifesto, including Robert Stone, David Keith, Stewart Brand, Michael Shellenberger, and Mark Lynas, signed an open letter addressed to California Governor Jerry Brown, PG&E CEO Tony Earley, and other state officials urging against shutting down Diablo Canyon. They underscored the plant’s importance in fulfilling California’s climate objectives by supplying carbon-free electricity.
Environmental advocates such as S. David Freeman and Damon Moglen from Friends of the Earth commissioned an analysis estimating that extending Diablo Canyon’s operational licenses would cost approximately $17 billion, compared to $12–15 billion for replacement through renewables and energy efficiency initiatives. These stakeholders engaged PG&E and environmental organizations in negotiations involving the plant’s unions, who consented to closure following receipt of $350 million allocated for retraining programs and retention incentives. Lieutenant Governor Gavin Newsom endorsed a gradual transition focused on greener alternatives.
On June 21, 2016, PG&E revealed a Joint Proposal developed with environmental groups and labor unions aimed at investing in energy efficiency improvements, renewable energy sources, and storage solutions while systematically phasing out nuclear power. PG&E cited California’s electricity policies favoring renewables over nuclear and fossil fuels—leading to Diablo operating at roughly half capacity—and highlighted that fixed costs effectively doubled per-kWh generation expenses.
The company’s CEO acknowledged the benefits of greenhouse gas-free power but attributed the closure decision largely to regulatory frameworks. The operating licenses for Diablo Canyon Units 1 and 2 were scheduled to expire in 2024 and 2025 respectively; PG&E’s application for closure was approved by the California Public Utilities Commission in January 2018, followed by withdrawal of its Nuclear Regulatory Commission license extension request in February.
By October 2020, the California Independent System Operator (CAISO) warned that retiring Diablo would pose serious challenges to grid reliability and likely increase reliance on fossil fuels, threatening progress toward greenhouse gas reduction targets. Analyses suggested that without proper strategies, natural gas plants could fill the supply gap, potentially adding up to 15.5 million metric tons of emissions by decade’s end.
David G. Victor, a professor at UC San Diego, observed that anti-nuclear sentiment in California outweighs pro-climate policy influences. A 2021 report from MIT and Stanford concluded that maintaining Diablo Canyon operations through 2035 would lower annual carbon emissions from electricity by 11%, save $2.6 billion cumulatively, and enhance grid stability; extending operations until 2045 could result in $21 billion in savings. Critical factors include California’s SB100 mandate for 100% clean electricity by 2045, ongoing drought conditions limiting hydroelectric output, and rising electricity demand during heatwaves.
Former U.S. Energy Secretary Steven Chu supported this study’s findings, emphasizing nuclear power's role as a reliable zero-carbon energy source essential when renewable generation is intermittent. He described the plant's planned shutdown as “distressing” and called for reconsideration.
Continuing operations could facilitate drought mitigation by powering desalination facilities at roughly half the cost of current plants or produce hydrogen fuel more efficiently than wind or solar alternatives.
In October 2021, both the California Energy Commission and CAISO cautioned about possible summer blackouts due to Diablo’s closure coinciding with shutdowns of four natural gas plants totaling 3.7 GW capacity alongside reduced electricity imports resulting from drought-affected hydroelectric generation and coal plant retirements.
The Washington Post editorial board argued that shutting down Diablo Canyon contradicts California’s carbon neutrality ambitions, raises costs associated with energy transition efforts, and exacerbates power shortages—as demonstrated during blackouts experienced in 2020.
In February 2022, a coalition of 79 scientists issued an open letter emphasizing that Diablo Canyon's annual output of approximately 18 TWh of low-carbon electricity is crucial for achieving decarbonization goals.
Addressing these issues, Governor Gavin Newsom proposed a $1.4 billion loan in August 2022 aimed at extending Diablo Canyon’s operational life by five to ten years. The California Legislature passed this initiative through Senate Bill 846 on September 1, which includes provisions for regulatory oversight allowing closure if continued operation becomes economically disadvantageous for consumers. PG&E intends to pursue additional funding from a $6 billion federal program designed to support nuclear facilities facing closure risks.
PG&E recommenced its Nuclear Regulatory Commission license renewal process late in 2022; further approvals remain pending from multiple state entities including the Department of Energy (DOE), State Lands Commission, Energy Commission, Coastal Commission, and Public Utilities Commission.
In November 2022, DOE granted $1.1 billion through the Civil Nuclear Credit program under the Infrastructure Investment and Jobs Act to facilitate continued operation of Diablo Canyon.
Seismic resilience
Diablo Canyon was originally engineered to resist earthquakes up to magnitude 6.75, considering seismic threats from nearby faults such as the San Andreas and Hosgri Faults. Subsequently, its design was enhanced to tolerate earthquakes reaching magnitude 7.5. The facility incorporates multiple layers of seismic monitoring and an automated safety mechanism that triggers immediate shutdown when substantial ground shaking is detected.
Independent Safety Oversight
Established in June 1988 as part of a legal settlement involving the Division of Ratepayer Advocates, the California Attorney General, and PG&E, the Diablo Canyon Independent Safety Committee (DCISC) operates independently. It consists of three members appointed respectively by the Governor, Attorney General, and Chairperson of the California Energy Commission, each serving staggered three-year terms. While the committee provides safety recommendations, it does not have authority over PG&E staff actions.
Emergency preparedness
The Nuclear Regulatory Commission delineates two emergency planning zones surrounding nuclear facilities: a 10-mile plume exposure pathway zone addressing airborne radioactive hazards, and a broader 50-mile ingestion pathway zone concerning contaminated food and water supplies.
By 2010, the population within a 10-mile radius of Diablo Canyon had grown to 26,123—a rise of 50.2% over ten years—while approximately 465,521 people lived within 50 miles, marking a 22.4% increase. Nearby urban centers include San Luis Obispo at 12 miles distance and Paso Robles located 31 miles away.
Emergency sirens cover a radius of 10 miles in compliance with federal regulations; however, county emergency systems extend coverage beyond this area from Cayucos to northern Nipomo. Businesses display siren alert information stickers, and schools along with public institutions maintain Protective Action Zone (PAZ) cards outlining evacuation routes and designated zones.
Electricity generation
| Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Total Annual Output | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2001 | 1,525,244 | 1,485,080 | 1,641,948 | 1,521,122 | 849,893 | 1,551,157 | 1,641,614 | 1,640,733 | 1,562,472 | 1,583,472 | 1,457,320 | 1,617,658 | 18,077,713 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2002 | 1,571,813 | 1,400,306 | 1,640,898 | 1,506,506 | 837,835 | 1,436,401 | 1,602,027 | 1,545,177 | 1,558,103 | 1,296,739 | 687,427 | 1,220,974 | 16,304,206 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2003 | 1,631,359 | 793,221 | 841,539 | 1,187,258 | 1,644,785 | 1,530,373 | 1,639,201 | 1,643,064 | 1,585,538 | 1,638,662 | 1,583,856 | 1,566,183 | 17,285,039 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2004 | 1,603,460 | 1,440,359 | 1,277,888 | 783,061 | 796,125 | 1,212,488 | 1,547,670 | 1,624,119 | 1,552,821 | 1,436,340 | 792,634</ small > | < small > 1163472 </ small > | 15 ,230 ,437 | - | 2005 | < small > 1613306 </ small > | < small > 1405477 </ small > | < small > 1634241 </ small > | < small > 1579485 </ small > | < small > 1631023 </ small > | < small > 1563650 </ small > | < small > 1635820 </ small > | < small > 1632265 </ small > | < small > 1446022 </ small > | < small > 1358644 </ small > | < small > 776329 </ small > | < small >1479040 </ small > | 17 ,755 ,302 | - | 2006 | < small >1648808 </ small > | < small >1497112 </ small > | < small >1658752 </ small > | < small >1229920 </ small > | < small >932000 </ small > | < small >1637676 </ small > | < small >1695432 </ small > | < small >1686784 </ small > | < small >1635172 </ small > | < small >1685593 </ small > | < small >1575764 </ small > | < small >1507982 </ small > | 18 ,390 ,995 | - | 2007 | < small >1693248 </ small > | < small >1525089 </ small > | < small >1690619 </ small > | < small >1554389 </ small > | < small >852197 </ small > | < small >1627930 </ small > | < small >1688585 </ small > | < small >1454699 </ small > | < small >1631781 </ small > | < small >1683859 </ small > | < small >1614813 </ small > | < small >1571281 </ small > | 18 ,588 ,490 | - | 2008 | < small >1656514 </ small > | < small >829903 </ small > | < small >840213 </ small > | < small >1261141 </ small > | < small >1638605 </ small > | < small >1632295 </.small> | <.small>1682212</.small> | <.small>1259242</.small> | <.small>1449057</.small> | <.small>1552863</.small> | <.small>1616118</.small> | <.small>1672364</.small> | 17 ,090 ,527 |
| 2009 | <.small>1488879</.small>
... (table continues with similar data through to year !2025) ... |
See also
- Critical Masses: Opposition to Nuclear Power in California, 1958–1978
- Dark Circle (film)
- Economics of nuclear power plants
- John Gofman
- List of articles associated with nuclear issues in California
- Nuclear policy in the United States
- Largest nuclear power plants in the United States
Further reading
- California Nuclear Profile – Diablo Canyon Nuclear Power Plant, Energy Information Administration, U.S. Department of Energy (DOE), September 2010
- Diablo Canyon 1 Pressurized Water Reactor, U.S. Nuclear Regulatory Commission (NRC), February 14, 2008
- Diablo Canyon 2 Pressurized Water Reactor, NRC, February 14, 2008
External links
- Articles with short description
- Energy infrastructure completed in 1985
- Energy infrastructure completed in 1986
- Buildings and structures in San Luis Obispo County, California
- Nuclear power plants in California
- Nuclear power stations using pressurized water reactors
- Pacific Gas and Electric Company
- Anti-nuclear protests in the United States
- 1985 establishments in California