Jump to content

Dutchess and Columbia Railroad

From Alfawiki
Newburgh, Dutchess and Connecticut Railroad
Company typeRailroad company
IndustryRail transport
PredecessorDutchess and Columbia Railroad
Founded1866
Defunct1907
FateMerged into Central New England Railway
Headquarters
Matteawan, New York
,
United States
Area served
Dutchess County, New York; Connecticut border near Millerton
ProductsRail transport services (passenger and freight)

The Newburgh, Dutchess and Connecticut Railroad operated within Dutchess County, New York, United States. Its route extended northeastward from the Hudson River at Fishkill to the border of Connecticut near Millerton. Initially chartered in 1866 as the Dutchess and Columbia Railroad (D&C), the line was designed to link small rural communities with the Hudson River Railroad and the New York and Harlem Railroad. In 1868, while still under construction, it was leased by the Boston, Hartford and Erie Railroad (BH&E). The first operational section opened in July 1869, reaching Pine Plains by February of the following year.

Following BH&E's collapse in March 1870, D&C management swiftly took back control of the railroad. The final stretch to the state boundary was completed in 1871. During the mid-1870s, this railroad became part of the New York, Boston and Montreal Railway, which also failed, resulting in a foreclosure sale of D&C in August 1876. It was then reorganized as the Newburgh, Dutchess and Connecticut Railroad (ND&C) in January 1877. By 1881, the BH&E’s successor, the New York and New England Railroad (NY&NE), started utilizing the southwestern portion of ND&C and constructed a short branch line to access Fishkill Landing on the Hudson River. The Clove Branch Railroad, originally built in 1869 and extended in 1877, ceased operations in 1897.

In 1905, the ND&C was purchased by the New York, New Haven and Hartford Railroad (NYNH&H) and was subsequently placed under its subsidiary, the Central New England Railway, in 1907. Passenger train service on various segments ended between 1921 and 1933. Most of the ND&C route was abandoned between 1925 and 1938; only the section from Beacon to Hopewell Junction remained active for freight purposes. After multiple changes in ownership, this segment is currently part of the Beacon Line, which is used by Metro-North Railroad primarily for transferring equipment.

Origins

The Dutchess and Columbia Railroad (D&C) received its charter on September 4, 1866.[1] Its intended path ran northeast from Plumb Point in Fishkill to connect with the New York and Harlem Railroad at Hillsdale station located in Craryville.[2] Although initially planned to transport lead and iron ore westward from around Ancram and coal eastward from Pennsylvania’s coal fields,[3] townships in Columbia County declined to finance the northern alignment. This led to a rerouting eastward from Pine Plains toward Millerton to meet with Harlem’s line.[1] While this adjustment bypassed most Ancram mining areas, it provided a connection with the Connecticut Western Railroad advancing westward from Hartford—thus transforming it into a bridge route.[3] Construction commenced at Plumb Point in 1868.[2]

In November of that year, D&C entered into a lease agreement with the Boston, Hartford and Erie Railroad (BH&E).[4] The BH&E had completed rail lines from Waterbury to Boston and Providence by 1855 but faced difficulties navigating western Connecticut’s terrain.[5] Aiming to circumvent New York City and challenge the dominance of the New York, New Haven and Hartford Railroad (commonly known as New Haven), BH&E—under Erie control—planned to route coal shipments through Newburgh.[3] To facilitate this, BH&E constructed a steamship terminal at Denning's Point where Fishkill Creek meets the Hudson River, connected by a trestle to D&C tracks.[2]

Operations on D&C began on June 21, 1869 between Dutchess Junction (Plumb Point) and Hopewell Junction, which was intended as BH&E’s connecting point.[4][3]Cite error: The opening <ref> tag is malformed or has a bad name BH&E provided all rolling stock during this period.[4] Prior to completion of Dutchess Junction station facilities, trains operated via Hudson River Railroad between Fishkill Landing and Dutchess Junction.[2] Later that same year, the Clove Branch Railroad inaugurated its line from Clove Branch Junction north of Hopewell Junction extending toward Sylvan Lake mines.[4][6] By October 1869, D&C had reached Millbrook and extended service to Pine Plains by February 1870.Cite error: The opening <ref> tag is malformed or has a bad name[4]

Expansion

The financially strained BH&E collapsed in March 1870. Instead of yielding to the receivers appointed for BH&E, the D&C executives reclaimed control of their railroad. On March 22, the president and secretary executed a bold "midnight train operation," dismantling tracks near the engine house, rousing a conductor to operate a locomotive, and retaking stations along the route. By March 25, normal operations resumed, utilizing a purchased engine and passenger cars leased from the Hudson River Railroad. Following legal proceedings, BH&E relinquished its claim on the line.

The D&C extended its track through Millerton, linking up with the Connecticut Western at the New York-Connecticut border on July 24, 1871. Millerton became a key junction; later that year, the Connecticut Western leased the D&C segment between State Line and Millerton. The Poughkeepsie and Eastern Railroad (P&E) commenced service from Poughkeepsie to Stissing Junction on January 24, 1871, and later expanded from Pine Plains to State Line on October 1, 1872, operating over D&C tracks between Stissing Junction and Pine Plains through trackage rights.

In 1870, the Harlem Extension Railroad was established by combining the Lebanon Springs Railroad and Bennington and Rutland Railroad, forming a route from Chatham to Rutland. Toward the end of 1872, the D&C merged with several railroads—the New York and Boston Railroad, the unbuilt Putnam and Dutchess Railroad, and the Clove Branch—to create the New York, Boston and Northern Railway. In 1873, this entity further consolidated with the Harlem Extension and the unbuilt Pine Plains and Albany Railroad to form the New York, Boston and Montreal Railway (NYB&M). The Clove Branch along with the D&C stretch between Clove Branch Junction and Pine Plains were designated as part of its mainline connecting New York to Rutland.

Newburgh, Dutchess and Connecticut

The Rhinebeck and Connecticut Railroad, which began operations in 1875, provided a more direct and flatter route to the Hudson River than the D&C. This allowed for reduced rates and supplanted the D&C as the Connecticut Western’s principal western link, negatively impacting D&C’s revenue stream. Construction of two planned segments was halted by 1875 due to the Panic of 1873; subsequently, both NYB&M and D&C declared bankruptcy. The Clove Branch regained independence during this period. In August 1876, D&C was sold at foreclosure and reorganized on January 15, 1877, under the name Newburgh, Dutchess and Connecticut Railroad, with headquarters in Matteawan. That same year, the Clove Branch was extended approximately to Clove Valley to serve an ironworks facility, partially following right-of-way graded by NYB&M.

The New York and New England Railroad (NY&NE), successor to BH&E, reached from Danbury, Connecticut to Brewster, New York in July 1881 before extending further to Hopewell Junction by December. The ND&C was accessed via trackage rights to reach the Hudson River. NY&NE constructed a short branch line from ND&C to Fishkill Landing. Passenger trains running between Fishkill Landing and Boston commenced service on December 12, 1881. At that time, ferry service across the Hudson connecting with Erie Railroad also began; notably, its inaugural freight car transported 800 turkeys from Livonia destined for Providence. Within weeks of operation, NY&NE handled more freight traffic than all other railroads in Dutchess County combined.

The Poughkeepsie Bridge opened in 1889 featuring connections westward to Erie Railroad and northeastward toward Silvernails as part of Central New England and Western (successor of Connecticut Western). The Dutchess County Railroad, linking the bridge to Hopewell Junction, was finished in 1892. These continuous routes significantly diminished demand for ferry service at Fishkill Landing. Consequently, ND&C shifted focus toward local freight operations such as coal distribution within Dutchess County. The NY&NE came under control of its competitor New Haven in 1895 and was fully merged into it by 1899. The Clove Branch—leased by ND&C—ceased operations in 1897 due to iron ore depletion and was dismantled by 1898.

Central New England Railway

In 1892, the Central New England and Western combined with the Poughkeepsie Bridge and Railroad Company to create the Philadelphia, Reading and New England Railroad, which was under the control of the Philadelphia and Reading Railroad. By 1899, this entity was renamed the Central New England Railway (CNE), remaining within Reading's sphere of influence. Control of the CNE shifted to the New Haven in 1904, mainly to obtain ownership of the Poughkeepsie Bridge. Despite being a New Haven subsidiary, the CNE maintained a considerable degree of operational independence. Additionally, the New Haven transferred the former NY&NE Fishkill Landing branch line to CNE management.

By 1905, daily passenger operations on the ND&C featured several round trips linking Fishkill Landing, Pine Plains, Millerton, and State Line with connections to CNE trains. In July that year, New Haven agreed to acquire the ND&C primarily to secure the track segment between Wicopee Junction and Hopewell Junction and to prevent access by the New York Central Railroad. The formal transfer took place on September 14, 1905, after which ND&C services were incorporated into CNE operations, with some routes redirected to Poughkeepsie rather than Fishkill Junction. In 1907, ND&C merged with the Poughkeepsie and Eastern, Dutchess County, and Poughkeepsie Bridge railroads to form a consolidated CNE.

The CNE undertook rationalization of redundant lines within rural Dutchess County. On October 2, 1909, it discontinued service on the former Poughkeepsie and Connecticut Railroad stretch between West Pine Plains and West Salt Point, diverting traffic onto parallel ex-Poughkeepsie and Eastern tracks that included ex-ND&C routes between Pine Plains and Stissing Junction. By 1912, scheduled service comprised two daily round trips from Fishkill Landing to Millerton, one daily trip from Fishkill Landing to Pine Plains via Dutchess Junction, along with additional daily round trips operating on ex-NY&NE lines between Fishkill Landing and Hopewell Junction.

By 1915, service patterns included approximately one and a half daily round trips between Beacon (previously Fishkill Landing) and Pine Plains, a southbound daily trip from Pine Plains to Hopewell Junction, plus a Beacon–Millerton round trip. Other CNE and former NY&NE round trips connected Millerton, Stissing Junction, Pine Plains, and points west of Hopewell Junction. The 1.03-mile segment linking Wicopee Junction and Dutchess Junction was abandoned in 1916, leaving only the southern connection to Beacon operational.

Abandonment

Passenger service on the section between Shekomeko and Millerton ceased on December 18, 1921. This portion saw sporadic freight use until January 21, 1925, when abandonment was authorized by the Interstate Commerce Commission. Passenger operations between Millerton and Pine Plains via Boston Corners ended simultaneously. In October 1923, a gasoline-powered railcar was introduced on the Beacon–Pine Plains route; however, the sole daily round trip between Pine Plains and Shekomeko terminated in 1927. By December of that year, services east of Millerton were curtailed back to Canaan, Connecticut, shortly before all passenger operations ceased in Connecticut.

In 1927, CNE was fully merged into New Haven. By 1932, passenger service had dwindled to a single gasoline railcar providing limited trips on former CNE lines; these were discontinued in September 1933. The track segment between Pine Plains and Shekomeko was abandoned by late 1935. Freight operations from Stissing Junction to Millbrook ended in July 1936 due to deteriorating trestle conditions.

In April 1938, the ICC approved abandonment for most remaining ex-CNE routes in New York State, including the former ND&C line running from Hopewell Junction to Pine Plains. This abandonment took effect on August 1, 1938; nonetheless, New Haven retained control of the Maybrook Line as a vital freight corridor over the Poughkeepsie Bridge and preserved freight service on Beacon–Hopewell Junction.

Following New Haven's merger into Penn Central in 1969 and Penn Central’s absorption into Conrail in 1976, a fire in 1974 damaged the Poughkeepsie Bridge severing connections west of the Hudson River. Consequently, Conrail upgraded the ex-ND&C spur leading to Beacon to accommodate increased freight volumes. In 1981 Conrail sought abandonment of this spur along with the Maybrook Line segment between Poughkeepsie and Hopewell Junction; while abandonment of Maybrook occurred in 1982, Beacon–Hopewell Junction remained active.

Maybrook Properties—a subsidiary of Housatonic Railroad—acquired the remaining Maybrook Line (Beacon–Hopewell Junction–Derby) from Conrail in 1992. The Metro-North Railroad purchased the New York section as its Beacon Line in January 1995. Metro-North filed for federal approval to abandon this line beginning in 2021; although Housatonic initially opposed this move, it later expressed no objection after suspending operations for two years. In July 2023, the Surface Transportation Board rejected Metro-North’s abandonment request due to procedural issues. The railroad refiled for abandonment in December 2023; approval was granted effective February 2024, allowing conversion of the corridor into a rail trail.

Route

Stretching approximately 57 miles across Dutchess County, New York, the Newburgh, Dutchess and Connecticut Railroad extended from the Hudson River to the border with Connecticut. Its southwestern endpoint was located at Dutchess Junction in Fishkill, where it linked with the Hudson River Railroad. The route traced the Fishkill Creek valley northeastward to Hopewell Junction, where it intersected with both the New York and New England Railroad and the Dutchess County Railroad. From Hopewell Junction, the line proceeded north through rugged terrain featuring steep inclines near Moore's Mills before reaching Verbank, then curved around Oak Summit toward Millbrook.

At Stissing Junction, the Poughkeepsie and Eastern Railway merged onto the ND&C line, sharing trackage rights up to a divergence south of Pine Plains. After 1910, a connection branched off there to join the Central New England mainline. Continuing east from Pine Plains, the ND&C faced an average gradient of 1% over a 10-mile stretch to Winchells, including steeper grades of 2.8% near Shekomeko and 1.9% close to Winchells. A 3.5-mile descent at a 1.5% grade led into Millerton, where the line crossed paths with the New York and Harlem Railroad. At the state boundary, it connected with both the Hartford and Connecticut Western Railroad and the Poughkeepsie and Eastern Railroad. Due to these steep inclines, passenger trains were restricted to speeds of 15 miles per hour between State Line and Pine Plains.

A short branch line at the southwestern end, initially constructed by the New York and New England Railroad, diverged at Wicopee Junction west of Matteawan and ran northwest along the Hudson River Railroad to reach the ferry terminal at Fishkill Landing (now Beacon). The Clove Branch Railroad, closely linked with the ND&C, extended eastward from Clove Branch to Clove Valley.

Station listing

The majority of stations along this route were modest square buildings topped with flat roofs.

15.70 (25.3) Arthursburg 17.33 (27.9) rowspan="3"|LaGrange, New York Lagrange 18.81 (30.3) Billings 21.35 (34.4) Moores Mills 23.51 (37.8) rowspan="2"|Union Vale, New York Verbank Village 24.35 (39.2) Verbank 27.21 (43.8) Washington, New York Oak Summit 29.14 (46.9) Millbrook, New York Millbrook 32.74 (52.7) Washington Shunpike 34.49 (55.5) rowspan="4"|Stanford, New York Anson's Crossing 36.29 (58.4) Bangall 38.73 (62.3) Stissing Junction Junction with Poughkeepsie and Eastern Railroad. 40.47 (65.2) Attlebury 42.67 (68.7) rowspan="4" Pine Plains, New York Briarcliff Farms | Junction with Poughkeepsie and Eastern Railroad and Poughkeepsie and Connecticut Railroad | Shekomeko |
Miles (km) Municipality Station Connections and notes
0.0 (0.0) Beacon Lua error: expandTemplate: template "NYNH&H stations" does not exist. Located on an 1881-built spur; connection with Hudson River Railroad.
0.0 (0.0) Fishkill (town) Lua error: expandTemplate: template "NYNH&H stations" does not exist. Connection point with Hudson River Railroad.
1.0 (1.6) Beacon – Wickopee Junction—junction with Beacon spur.
1.8 (2.9) Matteawan
3.8 (6.1) Fishkill (town) Glenham
5.93 (9.54) Fishkill (village) Fishkill
7.71 (12.4) Fishkill (town) Brinckerhoff
12.25 (19.7) East Fishkill Lua error: expandTemplate: template "NYNH&H stations" does not exist. Junction with New York and New England Railroad and Dutchess County Railroad.
13.36 (21.5) Clove Branch

Junction with Clove Branch Railroad.

References

  1. ↑ 1.0 1.1 Cite error: Invalid <ref> tag; no text was provided for refs named robinson
  2. ↑ 2.0 2.1 2.2 2.3 Cite error: Invalid <ref> tag; no text was provided for refs named stuart
  3. ↑ 3.0 3.1 3.2 3.3 Cite error: Invalid <ref> tag; no text was provided for refs named gateway
  4. ↑ 4.0 4.1 4.2 4.3 4.4 Cite error: Invalid <ref> tag; no text was provided for refs named clinton
  5. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named sne
  6. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named frank