Jump to content

Edinburgh and Bathgate Railway

From Alfawiki
Edinburgh and Bathgate Railway
Company typeRailway company
IndustryRail transport
Founded3 August 1846
Defunct1923
FateAbsorbed into London and North Eastern Railway
Headquarters
Bathgate
,
Scotland, United Kingdom
Area served
East Central Scotland
Key people
Thomas Grainger (engineer)
ProductsPassenger and freight rail services

The Edinburgh–Bathgate line is a railway situated in East Central Scotland, initially established and operated by the Edinburgh and Bathgate Railway. Apart from a brief stretch at the original terminus in Bathgate, the primary route continues to operate, offering frequent passenger services managed by ScotRail.

Extension to Airdrie and Glasgow

In 2005, the Scottish Executive unveiled plans to enhance public transportation connections between Glasgow and Edinburgh, alongside upgrading the incomplete portion of the A8 to motorway standards.

The previously closed section of the Bathgate and Coatbridge Railway—stretching from the 1989 Drumgelloch station to Bathgate—was reconstructed and electrified, linking with the North Clyde Line at Drumgelloch. This development established a vital fourth rail corridor between Glasgow and Edinburgh, improving access for communities in West Lothian to the Greater Glasgow region.

Starting 12 December 2010, services running between Edinburgh and Bathgate were incorporated into the North Clyde Line, enabling routes from and via . The entire extension project reached completion by 8 March 2011.

History

The Edinburgh and Bathgate Railway commenced operations in 1849, connecting a junction near Ratho to Bathgate. Immediately upon opening, the company leased the line to the Edinburgh and Glasgow Railway. The discovery of shale oil in the vicinity from 1850 led to a substantial increase in traffic. Additional railways converged at Bathgate, integrating this line into a through route linking Edinburgh with Glasgow via Airdrie. Although passenger services ceased in 1956, they were restored on the Edinburgh to Bathgate segment in 1986. The through route extending to Airdrie and Glasgow was reopened and electrified in 2010; today, it remains a heavily trafficked corridor for passenger travel.

Authorisation and opening

The Edinburgh and Bathgate Railway (E&BR) received parliamentary approval through the Edinburgh and Bathgate Railway Act 1846 (9 & 10 Vict. c. cccxxxii) on 3 August 1846. Its main line spanned approximately 11 miles (17 km), connecting Bathgate—a significant manufacturing hub at the time—to a junction near Ratho on the main line of the Edinburgh and Glasgow Railway.[note 1] Although authorisation was granted for branches to Midcalder, Binny Quarries, Whitburn, as well as a loop from Whitburn back to Bathgate, only one branch was constructed by E&BR. The initial share capital amounted to £250,000.[1] Subsequent legislation—the Edinburgh and Bathgate Railway (Deviation and Amendment) Act 1847 (10 & 11 Vict. c. ccxlvi) and the Edinburgh and Bathgate Railway (Extension and Deviation) Act 1848 (11 & 12 Vict. c. cxvi)—permitted route modifications.[2]

Construction was supervised by engineer Thomas Grainger.[3]

The sole branch developed was directed towards Uphall, accompanied by a mineral railway extending to Binny Quarry near Ecclesmachan. The main line officially opened on 12 November 1849. At the encouragement of the E&GR, E&BR leased its railway to E&GR for a term of 999 years commencing from opening day, with an annual charge of 4% on capital cost plus a portion of revenue.[note 2][note 3][2]

Effectively functioning as a holding entity, E&BR continued until railway grouping occurred in 1923.[4]

Original stations along the route from Bathgate Junction (near Ratho) included Broxburn, Houston, and Bathgate.[5]

Bathgate's Industrial Evolution

Once a center of traditional industry, Bathgate underwent significant transformation through the efforts of James Young, who, in 1850, patented a method to produce paraffin from torbanite, a variety of oil shale located on the Torbanehill estate between Bathgate and Whitburn. Young joined forces with Edward William Binney and Edward Meldrum to establish the Bathgate Works in February 1851, marking the inception of the world's first commercial oil production facility. Following the exhaustion of torbanite deposits, commercially viable shale with lower oil content was extracted in Bathgate and its surrounding regions. The Edinburgh and Glasgow Railway constructed a branch line from the E&BR route to Blackhall, linking Young’s facility; this connection commenced operations in 1850, branching off east of Bathgate station.

By 1855, the Monkland Railways had extended tracks eastward from Blackstone Junction and Armadale to reach Bathgate, thereby connecting it to Airdrie and Coatbridge through the rope-operated Ballochney Railway segment. Although this route was bypassed by 1859, a direct North British Railway (NBR) line between Coatbridge and Glasgow was only completed in 1871.

Several mineral branch lines were also developed from the E&BR mainline to serve local extraction points.

The North British Railway's Role

On 1 August 1865, the North British Railway (NBR) absorbed the Edinburgh and Glasgow Railway (E&GR), which had itself acquired the Monkland Railways just one day earlier.

In 1866, the E&BR resisted NBR proposals for bills that would grant NBR direct access to mineral sites, aiming to reduce dependence on E&BR infrastructure. The NBR board responded by offering to purchase E&BR outright, proposing a return of 5% on capital for seven years increasing to 5.5%, while assuming all outstanding E&BR debenture liabilities. This offer was ultimately declined by shareholders. During an August 1866 meeting, the chairman of E&BR attributed the rejection to internal divisions within NBR.

The NBR continued expanding local rail facilities with branches reaching Pumpherston Oil Works and Camps brickworks in 1869 (from Houston) and extending to Seafield Oil Works in 1875 (from West Calder Branch Junction).

In 1897, NBR inaugurated a chord at Bathgate facilitating direct through traffic from the northern section (Blackstone) towards the eastbound route to Edinburgh.

Passenger Operations

By 1895, daily passenger service comprised seven trains along the line, supplemented by two extra runs on Saturdays; some of these operated as semi-fast through trains connecting Edinburgh and Glasgow.

Bangour Private Railway

Bangour Village Hospital, a psychiatric institution near Dechmont, commenced operations in June 1904. Due to poor road infrastructure and substantial supply requirements, a private branch railway was authorized under the Edinburgh and District Lunacy Board Act (1900) and opened for public use on 19 June 1905 from the E&BR line. Managed by the North British Railway (NBR), this branch included an intermediate public station at Dechmont, used extensively by hospital personnel commuting daily. The terminal Bangour station was private, with tickets distinctly marked "Bangour (Private)".

According to NBR agreements, the hospital guaranteed an annual income of £1,500; however, actual receipts were approximately £300 per year, necessitating a subsidy of £1,200. During World War I, Bangour’s function expanded to care for wounded soldiers, prompting improvements in road access. After wartime demand diminished, the railway branch ceased operations on 1 August 1921, with passenger services likely having ended earlier on 4 May 1921.

The twentieth century

In the early decades of the twentieth century, the shale oil sector reached its height, supported by numerous mineral railways linking shale extraction sites and processing facilities to the Bathgate line. Nevertheless, by 1918, the industry faced a steep decline due to competition from more affordable liquid oil imports from the Middle East.

Following the enactment of the Railways Act 1921, the North British Railway was absorbed into the London and North Eastern Railway in 1923. Later, in 1948, nationalization transferred control of the line to British Railways’ Scottish Region.

Bathgate continued to serve as an industrial center, with Leyland Motors operating at the former Albion Motors factory. Despite this industrial activity, passenger numbers dropped sharply, resulting in the cessation of passenger services on 8 January 1956. Freight operations persisted intermittently, primarily supported by vehicle manufacturing. Seasonal passenger trains ran until 1960.

Mid-century developments

During the 1970s and 1980s, road congestion worsened in Edinburgh. Concurrently, Livingston New Town experienced significant growth after a slow initial phase. This expansion prompted proposals to reinstate the E&BR line as a branch off the Edinburgh and Glasgow main line to Bathgate, following its original alignment.

Reopening

Since passenger services ended in 1956, the route had been used exclusively for freight—mainly automotive-related—until it was reopened for passenger traffic on 24 March 1986 by British Rail. Considerable investment from Lothian Regional Council aimed to alleviate commuting challenges into Edinburgh caused by rising road congestion and to counteract West Lothian’s industrial downturn, which included the termination of shale oil extraction, coal mine closures between 1984 and 1986, and the planned closure of British Leyland’s Bathgate factory.

To reduce expenses, three miles of track were removed, and a single track section was established between Cawburn Junction and Carmondean Junction, serving Uphall railway station and Livingston North railway station. Passenger trains operated to Bathgate terminus while a freight-only line remained between Carmondean Junction and Bathgate yard.

The reopening surpassed expectations in terms of ridership; Sunday services were introduced, and weekday peak frequencies increased from hourly to every half hour. From 1986 until electrification was completed, diesel multiple units provided service—initially predominantly Class 101 units, then replaced by Class 150 units from 1987 onward, followed later by Class 158 or Class 170 units during 2008–09.

Upon completion of the Airdrie–Bathgate rail link and electrification works, services were incorporated into the North Clyde Line schedule using Class 334 electric multiple units. Due to delays in delivery of Class 380 trains, initial operations between Edinburgh and Bathgate continued with diesel units. In 2011, a half-hourly service commenced between Edinburgh Waverley and Helensburgh Central.

Topography

  • Bathgate Junction; point where line diverges from Edinburgh to Glasgow main line; currently known as Newbridge Junction;
  • Broxburn; opened on 12 November 1849; renamed Drumshoreland in May 1870; closed on 18 June 1951; previously a Broxburn station existed on E&GR main line until 1849;
  • Pumpherston branch junction; provided access to Pumpherston Oil Works (1869–1961) and Camps Brick Works (1869–1959);
  • Houston; inaugurated on 12 November 1849; renamed Uphall on 1 August 1865; closed on 9 January 1956; reopened on 24 March 1986;
  • Bangour Branch Junction; branching point for Uphall and Bangour Asylum Railway (1905–1921);
  • Dechmont; opened October 1850 with service only on Wednesdays; closed December 1861; site later used for Dechmont station on Bangour branch;
  • Livingstone; opened on 12 November 1849; also spelled Livingston;[note 4] closed on 1 November 1948; replaced by Livingston North station located approximately 0.80 miles (1.29 km) east on reopening date of 24 March 1986;
  • Bathgate Junction; divergence towards Monkland Railways route;
  • Bathgate; opened on 12 November 1849; renamed Bathgate Upper in 1856; closed on 9 January 1956; reopened on 24 March 1986; closed again on 12 December 2010 when a new through-line station was inaugurated.[5][6][7][8] [9][10]

Notes


Cite error: <ref> tags exist for a group named "note", but no corresponding <references group="note"/> tag was found

  1. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named carter
  2. ↑ 2.0 2.1 Cite error: Invalid <ref> tag; no text was provided for refs named jurist
  3. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named skempton
  4. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named paterson
  5. ↑ 5.0 5.1 Cite error: Invalid <ref> tag; no text was provided for refs named cobb
  6. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named bradshaw1895
  7. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named stansfield
  8. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named quick
  9. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named sa1960
  10. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named sa