Energy Northwest
| Company type | Public power joint operating agency |
|---|---|
| Industry | Energy |
| Predecessor | Washington Public Power Supply System |
| Founded | January 31, 1957 in Washington, United States |
| Headquarters | Richland , United States |
Area served | Pacific Northwest |
| Products | Nuclear, hydroelectric, wind, solar, battery storage power generation; energy project management and operations |
| Website | www |
Energy Northwest—originally known as the Washington Public Power Supply System—is a public power joint operating agency located in the Pacific Northwest. Established by Washington state legislation in 1957, its mission was to supply utilities across the Northwest with power at cost. The agency’s headquarters are situated in Richland, Washington, within the Tri-Cities area. During the 1970s, it gained notoriety under the nickname "Whoops!" due to its excessive commitment to nuclear energy projects, which resulted in a financial collapse and triggered the second largest municipal bond default in U.S. history. In 1998, it was rebranded as Energy Northwest. Today, its membership comprises 28 public power utilities, representing 23 of Washington's 29 public utility districts.
Energy Northwest operates under the supervision of two governing bodies: an executive board consisting of 11 members—including five directors from its board, three individuals appointed by the governor, and three public representatives—and a board of directors made up of delegates from each member utility.
The consortium’s portfolio encompasses nuclear, hydroelectric, wind, solar, and battery storage facilities that collectively contribute nearly 1,400 megawatts to the regional power grid. Among its primary assets are the White Bluffs Solar Station, Packwood Lake Hydroelectric Project, Nine Canyon Wind Project, Horn Rapids Solar, Storage and Training Project, and the nuclear plant known as the Columbia Generating Station.
As a municipal corporation, Energy Northwest possesses the authority to issue public bonds to fund power generation and utility infrastructure developments. Additionally, it provides specialized business services related to energy production and technical operations, including project management as well as facility operation and maintenance.
History
The early momentum behind public power initiatives took root during the 1920s and 1930s, driven largely by the Washington State Grange, a grassroots organization advocating for dependable and affordable electricity in rural areas. To address the increasing demand for energy throughout Washington state, public utility districts were established.
On January 31, 1957, the Washington state legislature founded the Washington Public Power Supply System (now Energy Northwest) as a collaborative operating agency designed to distribute both risks and benefits associated with building and managing power generation plants. Participating public utilities received electricity at production cost.
The agency’s inaugural project was the Packwood Lake Hydroelectric Project located in Lewis County, Washington. This facility produces 27.5 megawatts of electricity while maintaining environmental stewardship and has remained operational for over sixty years. In 2008, Energy Northwest sought renewal of its operating license; this was granted by FERC in 2018 for an additional 40 years.
In September 1962, Congress approved construction of the dual-purpose N Reactor at the Hanford Nuclear Reservation. This reactor was intended both for producing weapons-grade plutonium and generating steam for electricity production. With support from Senator Henry "Scoop" Jackson, Energy Northwest assumed responsibility as the non-federal operator for steam generation. Groundbreaking occurred in 1963 under President Kennedy’s administration, with commercial operations commencing in April 1966 at a capacity of 860 megawatts.
During the Hydro-Thermal Power Program of the 1970s, Energy Northwest embarked on building five large nuclear reactors simultaneously. This ambitious expansion resulted in overextension that contributed to financial failure amid escalating costs and project delays. The city of Seattle withdrew from participation in plants four and five after analyses recommended prioritizing conservation efforts and alternative energy sources instead.
Neil Strand resigned as managing director in February 1980 following criticism related to budget overruns and setbacks during nuclear plant construction. He had led Energy Northwest through nearly three challenging years during this period of instability.
Default
In January 1982, escalating expenses, project delays, and a decline in electricity demand prompted the termination of two WPPSS facilities and a suspension of construction on the two-reactor Satsop Nuclear Power Plant, which was approximately three-quarters finished. Seventeen months later, in June 1983, the Washington State Supreme Court declared the long-term take-or-pay agreements for purchasing power from the project unlawful. The subsequent month, WPPSS defaulted on $2.25 billion in municipal bonds, constituting the second largest municipal bond default in the history of the United States. The legal proceedings that followed extended for nearly ten years, during which WPPSS earned the media sobriquet "Whoops."
After default
Fuel loading at Columbia Generating Station commenced on December 25, 1983, progressing at a rate of 50 fuel assemblies daily and concluding on January 12, 1984. Columbia began commercial operations on December 13, 1984. On January 19, 2010, Energy Northwest submitted an application to the Nuclear Regulatory Commission seeking a 20-year license extension; this renewal was approved in May 2012. The facility, with a capacity of 1,116 megawatts, holds authorization to operate until December 20, 2043.
Energy Northwest also developed and manages the White Bluffs Solar Station demonstration project, inaugurated in May 2002. This low-maintenance installation comprises 242 photovoltaic panels delivering a generation capacity of 38.7 kilowatts DC.
Additionally, the agency constructed and operates the region’s inaugural public power wind facility, the Nine Canyon Wind Project. Dedicated in October 2002 and expanded in December 2003 and May 2008, it currently boasts a total generating capacity of 95.9 megawatts.
The most recent venture by Energy Northwest is the Horn Rapids Solar, Storage and Training project, which has been operational since November 2020. It includes a 4-megawatt DC solar array owned by Tucci Energy Services alongside a co-located battery energy storage system with a capacity of 1 MW/4 MWh operated by Energy Northwest.
Members
- Asotin County PUD
- Benton County PUD
- Centralia City Light
- Chelan County PUD
- City of Port Angeles
- City of Richland
- Clallam County PUD
- Clark Public Utilities
- Cowlitz County PUD
- Ferry County PUD
- Franklin County PUD
- Grant County PUD
- Grays Harbor County PUD
- Jefferson County PUD
- Kittitas County PUD
- Klickitat County PUD
- Lewis County PUD
- Mason County PUD 1
- Mason County PUD 3
- Okanogan County PUD
- Pacific County PUD 2
- Pend Oreille PUD
- Seattle City Light
- Skamania County PUD
- Snohomish County PUD
- Tacoma Public Utilities
- Wahkiakum County PUD
- Whatcom County PUD
See also
External links
- "As climate change intensifies, nuclear energy sector seeks expanded presence in Washington and nationwide". The Seattle Times. October 31, 2021.
- Investomedia
- The Cato Institute
- Los Angeles Times October 9, 1987
- HistoryLink.org – Overview of WPPSS – July 10, 2003 – (Essay 5482, David Wilma)
- Washington Public Power Supply System (WPPSS) Litigation Files, 2019–2019 housed at the National Archives and Records Administration
- Articles with short description
- Government of Washington (state)
- Nuclear power companies of the United States
- Municipal electric utilities of the United States
- Electric generation and transmission cooperatives in the United States
- Government units that have filed for Chapter 9 bankruptcy
- 1957 establishments in Washington (state)
- Energy in Washington (state)
- Cooperatives based in Washington