Adapted from the English Wikipedia article Genesis Solar Energy Project, available under CC BY-SA 4.0Updated 7 August 2025
Genesis Solar Energy Project
Company typeSubsidiary
IndustryRenewable energy
Founded2013; 13 years ago (2013)
FounderNextEra Energy Resources (parent company)
Headquarters
Riverside County
,
United States
Area served
Lower Colorado River Valley, California
ProductsConcentrated solar power
OwnerGenesis Solar, LLC (subsidiary of NextEra Energy Resources)
ParentNextEra Energy Resources

The Genesis Solar Energy Project is a concentrated solar power facility situated on Bureau of Land Management territory in eastern Riverside County, California. Managed and owned by Genesis Solar, LLC, a subsidiary of NextEra Energy Resources, this plant is positioned roughly west of Blythe within the Lower Colorado River Valley.

This installation consists of two separate units, each delivering a net output of 125 MW (140 MW gross), employing solar trough technology. At the time it commenced operations in 2013 and 2014, it ranked among the largest solar power plants globally, alongside other significant projects in Riverside and San Bernardino counties. The combined area occupied by the power block and solar arrays spans about , while the remaining land accommodates evaporation ponds, access roads, administrative facilities, and secured open spaces. The site contains 1,840 Solar Collector Assemblies, each measuring , amounting to a total solar aperture of .

With a construction expenditure of approximately US$1.25 billion, Genesis Solar contributes substantially to California’s renewable energy portfolio. It boasts an electrical capacity of 250 MW and has maintained an average capacity factor of 28.32% between 2016 and 2020, producing close to 620 GWh annually.

A study conducted in 2014 evaluated the potential effects of the project on local avian populations, highlighting ongoing environmental considerations pertinent to expansive solar developments.

Production

Since reaching full operational status, the Genesis Solar Energy Project has generated yearly electricity ranging from about 538,000 to 629,000 MWh, accumulating over 6 million MWh between 2013 and 2023. The highest annual output was approximately 628,831 MWh recorded in 2017. The maximum theoretical annual generation capacity is estimated at around 580,000 MWh.

Generation (MW·h) of Genesis Solar Energy Project
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2013 345 6,684 7,029
2014 4,892 13,080 48,455 60,960 72,621 80,979 68,861 66,969 63,976 46,236 35,271 13,813 576,113
2015 16,876 40,980 60,875 70,919 72,725 70,898 70,190 69,009 52,732 41,160 33,601 21,489 621,454
2016 17,573 45,940 55,704 55,737 79,177 76,282 77,787 67,890 58,971 48,245 30,618 10,218 624,142
2017 21,248 28,112 62,031 64,575 75,992 83,297 68,336 68,704 62,515 55,708 22,099 16,214 628,831
2018 24,000 37,452 50,348 63,379 79,074 80,337 65,787 67,571 67,820 43,918 29,755 13,701 623,142
2019 21,504 32,737 49,442 64,304 71,059 76,978 70,784 73,918 60,203 56.903 26.794 12.417 617.043
2020 18.874 34.184 46.428 68.153 82.837 78.973 82.897 64.037 50.644 46.579 29.435 6.088 609.129
2021 1.905 16.631 55.797 66.672 78.899 67.839 55.492 62.516 52.333 42.882 27.358 10.283 538.607
2022 22.275 37.730 55.671 68.625 80.949 78.285 62.529 57.542 50.694 50.523 31.068 17.816 613.707
2023 13.879 32.899 40.676 70.312 79.404 82.249 73.300 64.977 59.064 53.893 29.489 18 .042 618 .184
2024 (partial) 24 .675 |53 .182 |66 .029 |81 .067 |79 .534 |73 .400 |66 .545 |63 .708 |49 .184 |31 .085 |31 .086 623 .699
2025 (partial) 44 .616 | | | | | | | | | | 50 .565
Total (2013-2023) 6 ,070 ,352