Jump to content

Green Line (MARTA)

From Alfawiki
Green Line (MARTA)
Company typeRapid transit line
IndustryPublic transportation
Founded1992-12-29
Headquarters
Atlanta, Georgia
,
United States
Area served
Atlanta, Georgia
ProductsRapid transit service

The Green Line is a rapid transit route that forms part of the MARTA rail network, operating solely within the city limits of Atlanta, Georgia. Its service stretches between and stations.

History

Initially, the Green Line was conceived as a short segment of the planned North Line, which was intended to extend beyond Bankhead station toward areas such as Northside Drive in Brookwood Hills, including stops like the former Perry Homes public housing site. However, construction ceased at Bankhead without further extension.

The earliest portions of what are now the Blue and Green Lines were inaugurated between June and December 1979, representing MARTA’s first rail segments. The branch serving Bankhead, originally known as the Proctor Creek Line, began operation on December 29, 1992. This line was initially integrated with the East-West Rail Line and depicted in blue on system maps. Following 2006, it was distinguished by adopting a green color. MARTA officially introduced a color-based naming convention in 2009, at which point this branch was formally designated as the Green Line.

Future

On March 25, 2024, Atlanta’s mayor, Andre Dickens, revealed proposals for four new infill stations within the MARTA rail system. Subsequently, on April 11, Dickens identified two of these stations as planned additions to the Green Line: Joseph E. Boone (situated between Bankhead and Ashby) and Krog Street/Hulsey Yard located along the shared Blue/Green Line segment.

Plans dating back to 2021 include extending platforms at Bankhead station, which serves as the western endpoint of the line, to support eight-car train operations. This modification would facilitate extending Green Line service eastward to , incorporating stops at and . Presently, only a limited number of weekday Green Line trains reach Avondale station, while East Lake and Decatur stations continue to be served exclusively by Blue Line trains.

Operations

Between just west of Ashby and Edgewood/Candler Park, the Green Line shares its tracks with the Blue Line. During peak hours, Green Line trains commence service from Avondale, bypassing both Decatur and East Lake stations before moving onto a pocket track located east of Edgewood/Candler Park.

On weekdays, Green Line trains run continuously between Bankhead and Edgewood/Candler Park stations until 9:00 p.m. During weekends and holidays, service operates between Bankhead and King Memorial stations up to 9:00 p.m. After this time on all days, train service is restricted to running between Bankhead and Vine City stations until closing.

Line description

The route of the Green Line includes sections that are elevated, at-grade, and underground. Beginning at Bankhead station, it follows alongside Proctor Creek through West Atlanta—the only part of its path not shared with other lines. The Green Line then merges with the Blue Line prior to Ashby station and proceeds into downtown Atlanta where it intersects with both the Red and Gold Lines at Five Points station. The Green Line concludes its route at Edgewood/Candler Park station in East Atlanta; meanwhile, the Blue Line continues onward to Indian Creek station.

Stations

arranged from west to east


Station Code Inaugurated Rail Line
Connection
Service Schedule
Primary Line
Standard operation
Shuttle
9:00 pm – 1:00 am
Bankhead P4 December 29, 1992 ● ●
Ashby W3 December 22, 1979  Blue  ● ●
Vine City W2  Blue  ● ●
GWCC/CNN Center W1  Blue  ●
Five Points  Blue   Red   Gold  ●
Georgia State E1 June 30, 1979  Blue  ●
King Memorial E2  Blue  ●
Inman Park/Reynoldstown E3  Blue  ▲
Edgewood/Candler Park E4  Blue  ▲


External links