Jump to content

Green Line C branch

From Alfawiki
C branch (MBTA Green Line)
Company typePublic transit line
IndustryPublic transportation
Founded1888
Headquarters
Boston, Massachusetts
,
United States
Area served
Greater Boston, Massachusetts
ProductsLight rail transit service
Websitewww.mbta.com/schedules/Green-C

The C branch, frequently referred to as the Beacon Street Line or Cleveland Circle Line, represents one of the four branches within the Massachusetts Bay Transportation Authority's Green Line light rail network serving the greater Boston, Massachusetts region. Originating at Cleveland Circle in Boston's Brighton district, the route proceeds at street level through Brookline, running along the center median of Beacon Street. The line then enters a tunnel through the Saint Mary's Street incline and converges with both the B and D branches at Kenmore. From there, trains continue beneath the Boylston Street subway to reach Copley, where the E branch joins before advancing through the Tremont Street subway into downtown Boston. Since October 2021, the C branch's terminus has been at Government Center.

As of February 2023, service frequency ranges from 7 to 8 minutes during weekday peak periods and shifts to intervals of 10 to 11 minutes during off-peak times, utilizing between 8 and 11 trains (comprising 16 to 22 light rail vehicles).

History

The initial rails on Beacon Street were installed in 1888, originally extending westward from Massachusetts Avenue to Coolidge Corner. By 1889, this line was lengthened to reach Cleveland Circle, granting access to the Reservoir carhouse. That same year marked the electrification of the Beacon Street line up to Cleveland Circle and introduced the earliest electric streetcar route running east along Beacon Street—the precursor to what became the Green Line A branch. A connection at linked streetcars traveling from Brookline Village along Washington Street to Beacon Street; this corridor eventually transformed into today's route 65 bus service.

The opening of the Tremont Street subway in 1897 rerouted Beacon Street operations through the Public Garden incline toward . The subsequent expansion of the Boylston Street subway in 1914 allowed the Beacon Street line to enter near Kenmore Square.

Adjustments during the early 1900s included reductions and shuttle conversions on Washington Street routes, culminating in bus substitutions by 1926 and eventual development into route 65. In 1929, a shuttle service between – was extended along Beacon Street reaching , enhancing rush-hour capacity with alternating two-car and three-car trains.

By 1931, services on Commonwealth Avenue and Beacon Street stretched from Park Street to Lechmere utilizing three-car train configurations. The underground Kenmore station commenced operations in 1932 featuring distinct tunnels for Commonwealth Avenue and Beacon Street lines; the latter surfaced near . In 1945, two-car PCC streetcar trains were introduced on the Beacon Street line, followed by three-car PCC formations by 1946. Between 1940 and its official designation as the C branch in 1967, this route was identified as route 61.

The connection of the Riverside Line to the Beacon Street tunnel occurred in 1959. Throughout the 1960s and 1970s, service modifications included reductions and temporary reroutes prompted by track maintenance. The Boeing LRVs were launched on this line in 1978, replacing three-car PCC trains with combinations of two-car PCC or LRV sets by March that year.

Track enhancements and operational changes persisted into the 1980s; notably, a temporary bus substitution took place in 1982 during track replacements which also resulted in permanently closing four stops to accelerate travel times. Service was extended to North Station by 1983 but experienced intermittent truncations back to Government Center until a permanent extension returned service to North Station in 2005. In October 2021, ahead of the opening of the Green Line Extension, the C branch was again shortened to terminate at Government Center.

More recent infrastructure projects included a full bus replacement from July through August 2020 for track and platform renovations—this work involved replacing eleven grade crossings, over of track renewal, and upgrading rail joints. Additional bus substitutions occurred in July 2022 for further trackwork and installation of train protection systems. During August 2022 closures affecting the E branch, some C branch trains were temporarily extended to .

Accessibility

The deployment of low-floor light rail vehicles in 2000 marked the beginning of accessible service on the Green Line. During the early 2000s, the MBTA enhanced several surface stops by installing raised platforms as part of the Light Rail Accessibility Program. Around 2000, portable lifts were added at Coolidge Corner and Cleveland Circle. Between 2002 and 2003, four surface stops—, Coolidge Corner, , and Cleveland Circle—were upgraded with raised platforms.

Track maintenance conducted in 2018–19, which included replacing platform edges, initiated accessibility improvements at the impacted stops. By June 2023, design progress had reached 15% completion for , , , , , , , and —covering all remaining C Branch surface stops except Dean Road. Plans unveiled in February 2024 indicated that Kent Street station would be closed, while Fairbanks Street and Brandon Hall stations would be merged into a single stop. Future developments also envision island platforms at Coolidge Corner and Cleveland Circle, alongside platform relocations at Washington Square and Saint Mary's Street.

In May 2024, the Federal Transit Administration granted $67 million to the MBTA to fund accessible platform construction at 14 stops along the B and C branches. The project is anticipated to be finished by fall 2026.

Traffic signals

Operating along a dedicated median on Beacon Street in Brookline, the C branch encounters 18 grade crossings at principal intersections. Similar to the B branch, streetcars on the C branch are required to halt at traffic signals. Although implementing traffic signal prioritization could improve Green Line speeds, the MBTA has judged that investing in streetcar sensor technology is not economically justified.

In 2007, public input showed rider support for signal prioritization, while MBTA officials advocated for additional analysis before allocating funds. The MBTA engaged a consultant in January 2008 to assess this matter. By 2011, Brookline was contemplating a formal request for MBTA collaboration to introduce signal prioritization aimed at expediting Green Line service along Beacon Street.

The "Go Boston 2030" initiative led by Mayor Marty Walsh includes prioritizing traffic signals on Beacon Street as a targeted project slated for completion within five years.

Station listing

  1. REDIRECT Template:Boston transportation system
Location Station Opened Notes and connections
East Cambridge Disabled access
  1. REDIRECT Template:Boston transportation system
March 21, 2022 The original surface station was operational from July 10, 1922, until May 23, 2020; currently serves D and E branches.
West End Disabled access
  1. REDIRECT Template:Boston transportation system
August 20, 1955 Serves D and E branches; C branch service discontinued since April 3, 1981.
North End Disabled access
  1. REDIRECT Template:Boston transportation system
June 28, 2004 Serves D and E branches; no C branch service since October 23, 2021.
Disabled access
  1. REDIRECT Template:Boston transportation system
September 3, 1898 Serves D and E branches; C branch service ended October 23, 2021.
Downtown Boston Disabled access
  1. REDIRECT Template:Boston transportation system
Template:Ric: Template:Ric
Template:Ric: Template:MBTA bus links
Disabled access
  1. REDIRECT Template:Boston transportation system
September 1, 1897 "Template:Ric" includes Red and Silver lines (SL5); bus connections available.
Nearby Downtown Crossing offers Orange line and bus links.
  1. REDIRECT Template:Boston transportation system
"Template:Ric" includes Silver line (SL5); bus connections available.
Back Bay Disabled access
  1. REDIRECT Template:Boston transportation system
November 13, 1921 "Template:Ric" includes bus connections.
Disabled access
  1. REDIRECT Template:Boston transportation system
October 3, 1914 "Template:Ric" includes bus connections.

"Template:Ric" includes bus connections. Fenway–Kenmore Disabled access

  1. REDIRECT Template:Boston transportation system

October 23, 1932 Bus connections available; adjacent to Lansdowne station providing access to Framingham/Worcester line.

rowspan=16 | Brookline Disabled access

  1. REDIRECT Template:Boston transportation system

rowspan=6 |1888 Bus connections offered.

bgcolor=lightgray | Carlton Street bgcolor=lightgray | Closed July 24, 1982

  1. REDIRECT Template:Boston transportation system
  1. REDIRECT Template:Boston transportation system
  1. REDIRECT Template:Boston transportation system

Disabled access

  1. REDIRECT Template:Boston transportation system

Bus connections available.

bgcolor=lightgray | Winchester Street rowspan=11 |1889 bgcolor=lightgray | Closed July 24, 1982

  1. REDIRECT Template:Boston transportation system
  1. REDIRECT Template:Boston transportation system
  1. REDIRECT Template:Boston transportation system

Disabled access

  1. REDIRECT Template:Boston transportation system

Bus connections available.

bgcolor=lightgray | Winthrop Road bgcolor=lightgray | Closed July 24, 1982

  1. REDIRECT Template:Boston transportation system
  1. REDIRECT Template:Boston transportation system
  1. REDIRECT Template:Boston transportation system

bgcolor=lightgray | Strathmore Road bgcolor=lightgray | Closed July 24, 1982 Brighton Disabled access

  1. REDIRECT Template:Boston transportation system

Connections at Reservoir include Green D line subway and bus services.


External links