HVDC DolWin3

From Alfawiki
Adapted from the English Wikipedia article HVDC DolWin3, available under CC BY-SA 4.0Updated 10 August 2025
HVDC DolWin3
Company typeTransmission system
IndustryElectric power transmission
Founded2017; 9 years ago (2017)
FounderAlstom
Headquarters
Germany
Area served
German mainland electrical grid
Key people
TenneT (owner since 2017)
ProductsHigh voltage direct current transmission of offshore wind power
ParentTenneT

HVDC DolWin3 represents a high voltage direct current (HVDC) transmission system designed to deliver Offshore wind power directly to the German mainland electrical grid. Distinct from typical HVDC installations, this system features one converter station positioned offshore on a dedicated sea platform. It employs Voltage-Sourced Converters with a capacity of 900 MW and ±320 kV voltage rating, connected by cables extending 160 km in total length.

The development was executed by Alstom, with cable supply handled by Prysmian and the offshore platform constructed by Nordic Yards. Groundbreaking for the onshore converter facility at Dörpen West occurred in May 2014, followed by offshore platform construction commencing in October 2014. By mid-2015, outfitting of the platform was underway, and the initial converter transformer installation took place in July 2015. Ownership transferred to TenneT in 2017, with the system becoming operational as of September 2018. Investment in this offshore transmission asset was provided by a fund overseen by Copenhagen Infrastructure Partners.

Connected wind farms

  • Merkur (396 MW)
  • Borkum Riffgrund II (448 MW)