Jump to content

Haverhill station (Massachusetts)

From Alfawiki
Haverhill station
Company typeCommuter and intercity rail station
IndustryTransportation
Founded1840
Headquarters
Haverhill, Massachusetts
,
United States
Area served
Haverhill and surrounding areas
ProductsRail transportation services

Haverhill station is a downtown Haverhill, Massachusetts, United States facility serving both intercity and regional rail passengers. It functions as the northern endpoint for the MBTA Commuter Rail's Haverhill/Reading Line and is also a stop on Amtrak's Downeaster route. The station acts as a central connection point for local buses operated by the MVRTA, with the Washington Square Transit Center situated approximately east of the station.

The Boston and Portland Railroad extended its line to Haverhill in 1840, later becoming part of the Boston and Maine Railroad (B&M) in 1843. The original depot was replaced in 1867, then expanded with an additional floor between 1904 and 1906 during a project aimed at eliminating grade crossings. While B&M discontinued commuter rail service in 1976, it was reinstated in 1979 under the management of the Massachusetts Bay Transportation Authority (MBTA). Amtrak introduced Downeaster service to Haverhill in 2001.

Boston and Maine Railroad

The Boston and Portland Railroad commenced operations to , near Haverhill, on October 26, 1837. Completion of a Merrimack River bridge in 1839 allowed the line to extend service through Haverhill to East Kingston, New Hampshire by January 1, 1840. Renamed as the Boston and Maine Railroad (B&M) in 1843, the route quickly established commuter connections to Boston, with Haverhill remaining an important terminus despite some services being shortened to during the 1850s.

In 1867, a new brick station featuring a four-faced clock tower designed by Josiah Littlefield was constructed on the track’s east side, replacing the original structure. This was later accompanied by a larger wooden freight house.

By the 1890s, efforts were underway to eliminate hazardous grade crossings near the station, including one at Washington Street. Between 1904 and 1906, a $750,000 initiative elevated the railroad through Bradford and Haverhill, removing crossings at Washington, Essex, Winter, and Elm streets. Instead of building new stations as requested by city officials, B&M opted to expand the existing station by adding a second story and removing the clock tower. A pedestrian tunnel was created to connect the west-side waiting area. Temporary facilities served passengers during construction. The freight houses were preserved; one was relocated and repurposed, while another partially survived after a subsequent fire.

MBTA and Amtrak

Founded in 1964 to support suburban commuter rail operations, the Massachusetts Bay Transportation Authority (MBTA) initially did not include Haverhill within its service district. In early 1965, Boston and Maine Railroad (B&M) reduced most interstate routes but continued Boston–Haverhill trains with limited service beyond Haverhill. By January of that year, B&M ended nearly all intrastate runs outside MBTA’s jurisdiction—including Boston–Haverhill trips—leaving only a Dover round trip that served Haverhill. This was cut back to terminate at Haverhill in 1967 with local financial backing.

Subsidy withdrawals followed: North Andover stopped funding in 1974 and Andover in 1976. The sole Haverhill round trip ceased operations on June 30, 1976, after state funding was withdrawn, ending service to Lawrence. In December of that year, MBTA acquired most B&M commuter assets including the Western Route. Restoration efforts for Haverhill service began in 1978 through the Merrimack Valley Regional Transit Authority, leading to service resumption on December 17, 1979.

During the early 1990s, stations north along the Haverhill Line were upgraded for accessibility; however, reconstruction of Haverhill station itself faced delays due to disputes. In June 1998, bidding opened for a $4 million project featuring accessible mini-high platforms and a parking lot with capacity for 160 vehicles, targeting completion within eighteen months. Amtrak's Downeaster started stopping at the refurbished Haverhill station on December 14, 2001.

From July 15, 2024, until June 30, 2025, MBTA service at Haverhill station was suspended due to replacement work on the South Elm Street bridge in Bradford. During this interval, Bradford functioned as the line’s outer terminal; nevertheless, Amtrak maintained its stops at Haverhill throughout this period.

External links