Jump to content

History of the MBTA

From Alfawiki
Massachusetts Bay Transportation Authority
Company typePublic agency
IndustryPublic transportation
PredecessorMetropolitan Transit Authority (MTA), Boston Elevated Railway (BER)
FoundedAugust 1, 1964; 62 years ago (1964-08-01)
Headquarters
Boston, Massachusetts
,
United States
Area served
Greater Boston area, Massachusetts
ProductsCommuter rail, subway, bus, ferry, paratransit services
OwnerCommonwealth of Massachusetts
ParentMassachusetts Department of Transportation (MassDOT)
Websitembta.com

The Massachusetts Bay Transportation Authority (MBTA) and its antecedents have a history spanning over two hundred years, tracing back to one of the earliest railroads in the United States. The evolution of mass transit both mirrored and shaped the economic growth and demographic shifts within the region.

Boston's private transit system developed from early colonial ferries and steamship operations into steam-powered commuter railroads, horse-drawn and electric streetcars, elevated rail lines, and eventually subways by the dawn of the 20th century. Numerous streetcar companies merged into the West End Street Railway in 1887, which subsequently became part of the Boston Elevated Railway (BER) in 1897—the same year it launched the nation’s inaugural subway system, the Tremont Street subway. This transit infrastructure was financed by city taxpayers and managed by the Boston Transit Commission, representing a significant municipal commitment to urban transportation.

Confronted with financial difficulties due to increasing automobile usage, the Metropolitan Transit Authority (MTA) assumed control of BER in 1947, expanding rapid transit services while phasing out some inner commuter rail lines. The MTA added ferry operations in 1963. In 1964, the MBTA replaced the MTA, extending its jurisdiction to cover all commuter rail routes—many of which required government intervention because of financial instability. Paratransit offerings were introduced in 1977.

Aside from the Mattapan Line and segments of the Green Line, streetcars were supplanted by bus services. The MBTA capitalized on a political shift during the 1970s that deprioritized highway construction projects, facilitating relocation of part of the Orange Line. Over subsequent decades, demand for transit grew as suburbanization slowed and population numbers rose.

Throughout the late 20th and early 21st centuries, the agency expanded its commuter rail and rapid transit networks. The Big Dig project (1991–2006) spurred development of the Silver Line bus-subway and other expansions aimed at reducing pollution caused by increased highway capacity—a condition imposed following a Clean Air Act lawsuit filed by the Conservation Law Foundation. In 2000, MBTA funding transitioned to a fixed budget model based on state retail sales tax revenue supplemented by local assessments. However, growth in ecommerce diminished sales tax revenues below expectations, while debt payments from the Big Dig placed additional financial pressure on the agency, requiring further state support. The MBTA was integrated into MassDOT in 2009.

During Governor Charlie Baker’s administration (2015–2023), aging infrastructure led to operational difficulties; a major snowstorm in 2015 forced closure of two subway lines and resulted in establishment of a Fiscal and Management Control Board. Following challenges during the COVID-19 pandemic, safety concerns triggered a 2022 investigation by the Federal Transit Administration, accompanied by abrupt service reductions focused on improving safety.

Early mass transit

Mass transit began in Boston, Massachusetts with a family-run ferry service around 1630. Land transportation commenced with a private stagecoach line in 1793.

Steam railroads

The advent of the steam locomotive revolutionized mass transit in the 1810s and reached America during the 1820s. Between 1834 and 1835, three railroads linked Boston to neighboring industrial centers: the Boston and Lowell Railroad, Boston and Worcester Railroad, and Boston and Providence Railroad. By late 19th century, Boston was served by eight primary rail lines along with numerous branches consolidated under three dominant railroad companies. Although many branch lines were discontinued between the 1910s and 1950s, seven mainlines plus several branches remained operational for passenger service at the time of MBTA’s formation in 1964.

Boston and Maine Railroad

Four existing routes trace their origins to the Boston and Maine Railroad (B&M):

  • The Newburyport/Rockport Line evolved from the Eastern Railroad, which commenced operations between East Boston and in 1838, extending to (1839), (1840), and Portland, Maine by 1842. The Boston terminal was constructed in 1854. By 1861, the Gloucester Branch reached . After prolonged competition, B&M leased the Eastern Railroad in 1884. Passenger service along this corridor was reduced to Newburyport in 1965.
  • The Haverhill Line has its roots in the Andover and Wilmington Railroad, inaugurated between Wilmington and Andover in 1836, with extensions to Bradford (1837), Exeter, NH (1840), and Portland (1843). In 1845, a cutoff provided B&M with its own access to Boston. Known as the Western Route, it became central to B&M’s network. Passenger operations were curtailed to Dover, NH, in 1965 and further cut back to Haverhill by 1967.
  • The Fitchburg Line originated with the Fitchburg Railroad, opened between West Cambridge and Fitchburg during 1843–45. It absorbed the Charlestown Railroad (1844), which connected West Cambridge to Charlestown; a Boston extension followed in 1848. The Vermont and Massachusetts Railroad extended westward to Millers Falls and northward to Brattleboro by 1851, reaching Troy, New York via the Hoosac Tunnel by 1876. B&M leased the Fitchburg Railroad in 1900. Passenger service was scaled back to Fitchburg in 1960.

In addition, the B&M system included several lines that ceased operations during the MBTA era—such as the Woburn Branch (1981), Lexington Branch (1977), Central Massachusetts Branch (1971)—along with other branches discontinued prior to 1964.

New York Central Railroad

One existing line derives from the New York Central Railroad, which merged into the Penn Central Transportation Company in 1968:

Several branches of the B&A were closed before 1964. The Highland branch ceased passenger operations in 1958 for conversion into a streetcar line now known as the Green Line D branch. The freight-only Grand Junction Railroad, formerly owned by B&A, is currently utilized by MBTA for equipment transfers.

New York, New Haven and Hartford Railroad

Seven present-day lines originate from the New York, New Haven and Hartford Railroad, which merged into Penn Central in 1969. Four of these were operational when MBTA was established:

  • The Providence/Stoughton Line descends from the Boston and Providence Railroad (B&P), which opened between Boston and Providence in 1834–35. The New York, Providence and Boston Railroad (NYP&B) extended southwest from Providence starting in 1837. The Stoughton Branch commenced operations in 1845. The Old Colony Railroad acquired B&P in 1888; New Haven purchased successors of NYP&B in 1892 and Old Colony in 1893, consolidating these into its New York–Boston mainline, now part of the Northeast Corridor.
  • The Fairmount Line traces back to the Midland Railroad (Massachusetts), inaugurated between Boston and via in 1855. After intermittent operations under various owners, full service resumed in 1867. New Haven acquired a descendant of NY&NE in 1898, rerouting through trains north of Readville. Service between Boston and Readville ended in 1944 but was reinstated during MBTA’s tenure.
  • The Franklin/Foxboro Line originated with the Norfolk County Railroad, opened between and Blackstone in 1849. It later became part of Boston and New York Central Railroad and subsequently Boston, Hartford and Erie Railroad. New Haven reduced service to by 1966. The Franklin– segment began as part of the Milford and Woonsocket Railroad (1882), leased by NY&NE in 1887; passenger operations stopped in 1940 but resumed under MBTA management. The – segment opened in 1870 as part of the Mansfield and Framingham Railroad under Old Colony; passenger service ceased by 1933 but was later reactivated by MBTA.
  • The Needham Line stems from two branch lines: B&P's West Roxbury Branch (opened in 1849) and the Charles River Railroad connecting Newton Highlands to Needham (opened in 1853). The latter extended to Woonsocket by 1863, becoming part of Boston, Hartford and Erie Railroad. In 1906, New Haven established a cutoff from to West Roxbury. Service north of ended in 1932; south of Needham Junction on the Millis Branch ended by 1967.

Before MBTA’s creation, New Haven terminated all services on its Old Colony Division lines. Passenger operations serving Fall River, New Bedford, and Taunton via ended by 1958; routes via Quincy ceased by 1959. MBTA reactivated three lines:

  • The Kingston Line, originating from the original Old Colony Railroad launched between Boston and Plymouth in 1845; it experienced multiple mergers before reverting to Old Colony designation by 1872.
  • The Middleborough/Lakeville Line, descending from the Fall River Railroad, which opened South Braintree–Fall River route in 1846 before merging with Old Colony in 1854. Passenger services south of Middleborough ended mid-20th century; segments reopening under South Coast Rail include portions of New Bedford and Taunton Railroad (opened in 1840), Middleborough and Taunton Railroad (1856), and Fall River Railroad.
  • The Greenbush Line, derived from the South Shore Railroad, which opened between Braintree and Cohasset in 1849; extended to South Duxbury (1871) and Kingston (1874), acquired by Old Colony during late-1870s. Passenger service south of ended by 1939.

Two additional New Haven branches ceased operations in 1967—the Dedham Branch and the Millis Branch. Several other Old Colony Division branches closed prior to MBTA’s establishment. Portions of the former Shawmut Branch along with parts of Milton Branch were converted into streetcar or rapid transit lines—now incorporated into Mattapan Line and Red Line—between years spanning from1926 through1929.

Boston, Revere Beach and Lynn Railroad

Established in 1874, the Boston, Revere Beach and Lynn Railroad operated as a narrow-gauge line running between East Boston and Lynn, primarily serving short-distance passenger travel. The line never extended past Lynn nor connected its freight services with other railroads. After electrification in 1928, it provided frequent commuter trips until all service ended in 1940. During the 1950s, portions of its former right-of-way in East Boston and Revere were converted into a rapid transit extension, which today forms part of the Blue Line.

Streetcar era

The Cambridge Railroad, incorporated in 1853, holds the distinction of being Massachusetts' inaugural streetcar company. It linked Boston’s West End to Central and Harvard Squares in Cambridge via the West End Bridge, which was replaced by the Longfellow Bridge in 1906. Beginning operations with horse-drawn streetcars in 1856, it traced a route similar to that of the modern Red Line subway along surface streets. Founded in 1854, the Dorchester Railroad and numerous competitors established over twenty streetcar lines throughout Boston.

To control fare structures and reduce competition, Massachusetts enacted the West End Consolidation Act in 1885, forming the West End Street Railway. This organization unified Boston's streetcar networks and transitioned from horse-drawn cars to electric trolleys by 1889, fully phasing out horsecars around 1900. The company faced significant challenges such as the Great Blizzard of 1888, which severely disrupted rail and streetcar operations across northeastern urban centers.

By the turn of the century, two additional companies consolidated smaller lines: the Middlesex and Boston Street Railway managed routes servicing western suburbs, while the Eastern Massachusetts Street Railway oversaw northern and southern suburban lines.

Streetcar subways and elevated rail

Increasing streetcar congestion downtown Boston coupled with disruptions like those caused by the Great Blizzard of 1888 led to the creation of subways and elevated rail systems designed to boost capacity and bypass delays from street-level crossings. These initiatives were spearheaded by the West End Street Railway, which was later renamed the Boston Elevated Railway (BERy).

Boston’s subway system—often referred to as "America's First Subway"—began operation with the Tremont Street subway between 1897 and 1898, laying the foundation for today's Green Line. In 1901, the Main Line Elevated, a forerunner to the current Orange Line, started service as an elevated rapid transit route utilizing downtown tracks reconfigured within the Tremont Street subway. Shortly after came the Atlantic Avenue Elevated, offering a secondary downtown corridor. This marked Boston’s initial elevated railway and rapid transit line, predating New York City’s first underground subway but following its elevated rail lines by several decades.

The 1904 opening of the East Boston Tunnel replaced ferry connections with a streetcar tunnel beneath Boston Harbor linking East Boston. Converted to rapid transit use in 1924, it featured cross-platform transfers; ferry operations persisted until 1952.

In 1908, the Washington Street Tunnel commenced service, reducing travel distance for Elevated trains through downtown and returning streetcars to use the Tremont Street subway. The network expanded with new branches and extensions while surface routes were truncated at terminals such as and , facilitating transfers to faster elevated trains. Elevated expansions like the Charlestown Elevated were also introduced to integrate additional streetcar lines.

The 1912 completion of the Cambridge Tunnel connected Downtown Boston with Harvard Square in Cambridge and extended southward through the Dorchester Tunnel. Starting in 1927, the Dorchester Extension reutilized a former railroad branch through Dorchester; concurrently, the Ashmont–Mattapan High Speed Line continued operating along this corridor. These developments curtailed streetcar operations to terminal points.

Numerous major rapid transit stations incorporated prepayment stations, enabling passengers to transfer freely between streetcars and grade-separated lines under unified management. Some former streetcar platforms were later adapted for bus or trackless trolley services; others were closed altogether. Architectural features from these prepaid zones remain visible today, although faregates now secure all subway stations except for most above-ground Green Line stops.

Free transfers within stations were discontinued in October 1961 except among downtown subway routes. Partial restoration of bus-rapid transit transfers began in 2000 and was fully implemented by 2007 for passengers utilizing a CharlieCard. While bus-to-subway transfers offer discounted fares rather than free passage, local bus-to-bus transfers continue without charge.

Prepayment stations included key rapid transit transfer points at , , , , , , , , , , Massachusetts, , and ; surface-streetcar-only stations existed at , , and .

The decline of streetcars and railroads

Starting in 1922, the Boston Elevated Railway initiated the substitution of rail vehicles with buses, a transition later termed "bustitution". The final streetcar operations of the Middlesex and Boston Street Railway ceased in 1930, while some rail lines began converting to trackless trolley service from 1936 onward.

By 1953, only two streetcar routes remained operational, both utilizing tunnels: the primary Tremont Street subway in downtown Boston and a shorter tunnel at Harvard Square, now known as the Harvard bus tunnel. Diesel buses were unsuitable for these tunnels due to their exhaust emissions.

In 1958, routes through the Harvard Square tunnel transitioned to electrically powered trackless trolleys—representing the MBTA's sole trackless trolley services. A non-revenue connection exists linking the #71 trackless trolley terminus with the Watertown Carhouse for maintenance purposes. In the 21st century, trackless trolley operations expanded further with the Phase 2 development of the Silver Line in South Boston.

Elevated railways faced challenges including noise pollution, high upkeep expenses, and speed restrictions on tight curves. The Atlantic Avenue Elevated line experienced decline following the 1919 molasses disaster and a 1928 accident, resulting in partial shutdown and eventual demolition by 1942.

Passenger service on the Fairmount Line was discontinued in 1944 due to dwindling ridership. As rail passenger operations became financially unsustainable amid increasing automobile use, public sector intervention became essential to maintain commuter rail services threatened by railroad bankruptcies.

Formation of MTA and subsequent acquisitions

In 1947, the Metropolitan Transit Authority (MTA) assumed control over subway, elevated railway, streetcar, and bus operations previously managed by the Boston Elevated Railway. The initial MTA jurisdiction encompassed 14 municipalities surrounding Boston.

That same year, a state commission chaired by Lieutenant Governor Arthur W. Coolidge recommended replacing loss-making private commuter rail with frequent electric rapid transit extending toward what is now known as the Massachusetts Route 128 corridor. This initiative sought to alleviate downtown traffic congestion caused by automobiles.

While the MTA executed certain rapid transit extensions, progress slowed as personal vehicle ownership increased and the Federal-Aid Highway Act of 1956 encouraged commuters to shift away from public transit.

Between 1952 and 1954, the Revere Extension (currently part of the Blue Line) was inaugurated to reach Wonderland, primarily following a former narrow-gauge railroad alignment.

In 1959, MTA introduced streetcar service on what is today recognized as the Riverside Green Line D branch, connecting to the Boylston Street subway via tracks acquired from the New York Central Railroad. High passenger demand necessitated acquiring more vehicles than initially planned.

Also in 1959, with the opening of Interstate 93's Southeast Expressway, passenger services on former Old Colony Railroad lines were discontinued. Replacement rapid transit on the South Shore line commenced over a decade later and eventually extended beyond the southern terminus of the Expressway.

The final two streetcar routes serving the Pleasant Street Portal of the Tremont Street subway were replaced by bus service in 1953 and 1962; today, this portal is covered by a public park.

When year-round ferry service to Hull was reinstated by the MTA in 1963 (now part of MBTA boat), it stood out as the only commuter-oriented ferry operation in the United States at that time.

Establishment and commuter rail acquisitions

The MBTA was created on August 3, 1964, taking over from the MTA and broadening its service reach to encompass 78 municipalities, including Maynard, which joined in 1972 but departed by 1976.

Its primary purpose was to provide financial support for commuter rail services operated by three private railroads: Boston and Maine Railroad (serving northern routes), New York Central Railroad (through the Boston and Albany Railroad), and New York, New Haven and Hartford Railroad (covering southern lines). Following their mergers into Penn Central in 1968 and subsequently Conrail in 1976, the MBTA began subsidizing these services and progressively acquired the lines between 1973 and 1976, although this period saw considerable reductions in service. Several routes, such as the Old Colony Railroad servicing the South Shore, have since been reinstated.

By 1964, commuter rail service extended to Worcester. In 1965, Boston and Maine started receiving financial aid from the MBTA. The agency purchased most of the existing commuter rail infrastructure and rolling stock from Boston and Maine and Penn Central in 1973. However, the Framingham–Worcester segment was initially excluded, leading to service discontinuation in 1975; this service was restored in 1994 after the state acquired the line from CSX in 2011. The Fairmount Line was acquired from Penn Central in 1976; passenger operations resumed in 1979 amid Southwest Corridor construction and have continued since.

Bus growth and streetcar reductions

In 1965, the MBTA introduced a color-coding system for its four rapid transit lines, with lettered branches designated for the Green Line. Due to shortages of streetcars and other challenges, some Green Line branches were converted to bus service: the A branch ceased rail operation in 1969, and a portion of the E branch between Heath Street and Arborway followed suit in 1985.

The MBTA expanded its bus network by acquiring routes from Eastern Massachusetts Street Railway in 1968 (serving northern and southern suburbs) and Middlesex and Boston Street Railway in 1972 (covering western suburbs)—both companies had long abandoned streetcar operations. Additional northern routes were obtained from Service Bus Lines in 1975, while a southern route was purchased from Brush Hill Transportation Company in 1980. Over time, many peripheral routes were discontinued due to low patronage, high operational costs, and opposition from communities outside MBTA jurisdiction.

Expansion of rapid transit

During the 1970s, the MBTA benefited from the Boston Transportation Planning Review (BTPR), which shifted focus toward transit improvements rather than highway expansion following a halt on major highway projects within Route 128. A consulting team comprising Voorhees-Skidmore, Owings & Merrill and ESL developed numerous transit expansion plans.

In 1975, the Charlestown Elevated portion of the Orange Line was replaced by the Haymarket North Extension. The Red Line's Braintree branch opened incrementally between 1971 and 1980, enhancing an existing corridor; later, the Red Line Northwest Extension to Alewife debuted in 1985, incorporating a new deep-bore tunnel segment.

The Washington Street Elevated ceased operation in 1987 with the inauguration of the Southwest Corridor project, which rerouted service along an existing railway corridor featuring new infrastructure. This closure ended direct rapid transit access to Roxbury, which was subsequently served by the Silver Line bus rapid transit system.

These developments expanded subway coverage significantly and included large parking facilities at pivotal stations such as Alewife, which offers direct access to Route 2 freeway along with an extensive MBTA-managed parking structure.

By 2004, following replacement of the Causeway Street Elevated with an underground tunnel, only brief elevated sections remained on the Red Line near Charles/MGH stations and on the Green Line between Science Park and Lechmere.

MBTA growth and the Big Dig

In 1999, the MBTA expanded its service area to encompass 175 municipalities, covering most towns served by or near commuter rail lines. Despite this expansion, the MBTA did not assume control over local transit operations in many of these locations.

Prior to July 1, 2000, Massachusetts reimbursed the MBTA for all net operational costs. After that date, the agency began receiving dedicated funding derived from assessments on serviced communities combined with 20% of the state’s 5% sales tax revenue. This arrangement required the MBTA to operate within a "forward funding" budget framework.

The MBTA was charged with enhancing public transit options to mitigate increased automobile emissions resulting from the Big Dig project. During the Big Dig construction, portions of the Green Line were placed underground, and both Haymarket and North Stations underwent reconstruction. However, these undertakings placed considerable strain on MBTA resources since funding from the Big Dig did not cover these transit improvements. Despite modest population growth in Greater Boston, since 1988 the MBTA has ranked among the fastest expanding transit systems in the nation.

Starting in 2000, budget constraints led to significant debt accumulation for the MBTA due to planned projects and remediation work related to the Big Dig. This resulted in the highest debt level among U.S. transit agencies. To manage this financial burden, fare increases were implemented on January 1, 2007. Various advocacy organizations have called for state government intervention to assume $2.9 billion of the MBTA’s $9 billion debt load, which currently hampers investment in capital improvements.

The establishment of the MetroWest Regional Transit Authority (MWRTA) in 2006 enabled several towns—including Framingham and Natick—to redirect their transit assessments away from the MBTA toward MWRTA without reducing total funding; consequently, assessments for remaining MBTA member communities were adjusted upward. On October 31, 2007, commuter rail service was reinstated on the Greenbush Line in Scituate as part of restoring Old Colony Lines.

Renovations on the Green Line D branch took place during summer 2007, with new low-floor vehicles introduced in December 2008.

In 2008, MBTA General Manager Daniel Grabauskas revealed that some scheduled trips had been removed from published timetables without notifying passengers—a practice labeled “hidden service cuts”—which was subsequently discontinued.

On June 26, 2009, Governor Deval Patrick signed legislation incorporating the MBTA into the Massachusetts Department of Transportation (MassDOT) under its Mass Transit division (MassTrans). While maintaining its corporate identity, board membership shifted to five members appointed by the Governor representing MassDOT.

Rhode Island financed extensions of commuter rail service on the Providence/Stoughton Line to T.F. Green Airport in 2010 and Wickford Junction in 2012. Improvements along Boston’s Fairmount Line have been ongoing since 2002; its first new station at Talbot Avenue opened in November 2012.

Debt challenges, service reductions, and fare hikes

The Pioneer Institute’s assertion that since 1988 the MBTA has been America’s fastest expanding transit system despite slow metropolitan growth in Greater Boston has faced criticism. Research conducted by the Frontier Group indicates that while the MBTA does not lead any major category of growth among large transit agencies, it ranks within the top ten for absolute increases in transit ridership.

Following a cap on revenue enacted in 2000, the MBTA’s debt grew substantially due to ongoing projects and Big Dig-related remediation efforts. By 2012, it held approximately $9 billion in debt—the largest amount among U.S. transit authorities. To address this financial strain, fares were raised on January 1, 2007—from $1.25 to $2.00 per subway trip using a CharlieTicket and $1.70 with a CharlieCard. Local advocacy groups have urged state officials to take responsibility for $2.9 billion of this debt because interest payments consume a significant portion of annual budgets, restricting funds available for critical capital projects.

In April 2012, the MBTA Advisory Board approved substantial fare increases along with reductions or eliminations of certain routes. Another average fare increase of about 5% took effect in July 2014.

T-Radio

The MBTA introduced T-Radio on October 10, 2007, as a trial initiative at North, South, and Airport stations, offering a mix of music, news updates, weather forecasts, entertainment suggestions, and advertisements. However, the program was terminated after just two weeks on October 25 due to a flood of predominantly critical responses—approximately 1,800 emails expressing dissatisfaction.

Major incidents

On May 28, 2008, shortly after 6 p.m., a westbound trolley on the Green Line D branch collided with a stationary train between the Waban and Woodland stops. This accident resulted in seven injuries and the death of the moving train’s operator, Terrese Edmonds, aged 24. Nearly a year later, on May 8, 2009, two Green Line trolleys crashed between Park Street and Government Center when one operator, 24-year-old Aiden Quinn, was distracted by texting. This incident led to a prohibition on cell phone use by drivers operating buses, trains, or streetcars.

In the aftermath of the Boston Marathon bombing, the MBTA partially ceased operations while National Guard troops were stationed at multiple stations. During the search for suspects Dzhokhar and Tamerlan Tsarnaev, the entire MBTA system was shut down until stay-at-home orders in Watertown, Newton, Waltham, Cambridge, Belmont, and Boston were lifted. Police utilized MBTA buses for transportation during this period. Once the suspect was apprehended, regular service resumed. Subsequently, the MBTA displayed messages such as "BOSTON STRONG" and "WE ARE ONE BOSTON" on subway cars and buses to demonstrate unity.

Crisis and appointment of control board

In February 2015, Boston experienced record snowfall that caused significant disruptions and delays across all MBTA subway lines, exposing deep-rooted operational inefficiencies and financial struggles within the MBTA system. Massachusetts Governor Charlie Baker initially showed reluctance to discuss additional funding but indicated that measures would be forthcoming.

Under mounting public demand and polling data indicating strong support for prioritizing MBTA improvements, Baker formed a special advisory committee tasked with diagnosing systemic problems and proposing remedies. The panel’s April report highlighted critical issues including "severe financial distress," poor governance structures, inefficient expenditures, and elevated rates of absenteeism.

Among its principal recommendations were suspending governance by the MassDOT Board; establishing a temporary Fiscal and Management Control Board appointed by both the Governor and legislature; enlarging the MassDOT Board; and implementing term limits for board members. Acting on these suggestions, the MassDOT Board resigned at Baker’s request. Legislation incorporating these reforms was enacted in July 2015, authorizing the creation of the Fiscal and Management Control Board.

In addition to appointing a new MassDOT Board of Directors, Baker proposed an $83 million winter resiliency plan spanning five years aimed at mitigating future service interruptions caused by severe weather.

Governance

In the wake of a crisis initially linked to heavy snowfall and insufficient investment, MBTA General Manager Beverly Scott stepped down, effective April 11, 2015. She was succeeded by Frank DePaola, MassDOT's Chief Operating Officer, who retired on June 30, 2016; Brian Shortsleeve then assumed the position. On June 30, 2017, Shortsleeve and Steve Poftak, vice chair of the Fiscal and Management Control Board, exchanged roles. In February 2017, Governor Baker launched a search for a permanent MBTA General Manager.

Luis Ramirez, formerly an executive at General Electric, was appointed as MBTA general manager in August 2017. Despite concerns regarding his prior leadership at Global Power Equipment Group—where a class action lawsuit was dismissed twice—Governor Baker expressed trust in Ramirez, who started in September 2017. Ramirez departed on January 1, 2019, with Steve Poftak taking over. The Fiscal and Management Control Board was disbanded in June 2021; thereafter, Governor Baker enacted legislation to establish a permanent MBTA Board of Directors and appointed its members in October.

Numerous safety-related events—including collisions, escalator failures, and fatalities—attracted public scrutiny. In April 2022, the Federal Transit Administration (FTA) heightened its safety oversight of the MBTA and commenced a safety management evaluation. The FTA uncovered that subway dispatchers were working excessively long shifts due to staffing shortages, which led the MBTA to reduce rush hour service frequency on the Red, Blue, and Orange Lines to ensure adequate rest periods for employees. Additionally, federal inspectors issued emergency orders addressing runaway trains and track maintenance backlogs responsible for speed restrictions affecting approximately 10% of the subway network.

Following an Orange Line train fire that endangered passengers and resulted in a passenger jumping into the Mystic River, the MBTA suspended all Orange Line service for 30 days to accelerate track repairs and introduce an entirely new fleet of subway cars. However, by December 2022, electrical arcing problems forced the removal of nearly half of the Orange Line trains from operation without advance warning, causing significant schedule disruptions.

The FTA’s August 2022 safety report called for increased staffing levels and retention of experienced personnel; enhanced identification and prioritization of safety hazards; improved communication protocols for frontline staff; stronger enforcement of safety regulations; expanded technical training resources; resolution of radio dead zones; greater independent quality assurance; and more proactive oversight by the Massachusetts Department of Public Utilities.

Service cuts and improvements

In June 2015, the MBTA reduced its one-year pilot program that had expanded late-night weekend service starting in February and ultimately discontinued it in March 2016. Nonetheless, service enhancements persisted: in October 2015, nonstop peak trips were added on the Framingham/Worcester Commuter Rail Line between Back Bay and Worcester Union Station. Government Center Station reopened in March 2016 after two years of renovations. Following Governor Baker’s August 2016 enactment of new regulations for ridesharing companies, the MBTA initiated a pilot program integrating The Ride paratransit service with Uber and Lyft to increase accessibility; this was later extended to all users of The Ride.

In December 2016, the MBTA Fiscal and Management Control Board approved plans to replace the entire Red Line fleet by 2025. Boston Landing Station on the Framingham/Worcester Line was announced in January 2017 and opened in May. Renovations on Ruggles Station in Roxbury commenced in August with a $38.5 million budget. In April 2017, revised cost estimates for the Green Line Extension received Federal Transit Administration approval, unlocking federal funds; construction began in Somerville in June 2018.

April 2018 saw the launch of a one-year pilot offering early morning bus service on select Boston routes, which was later made permanent. The Silver Line introduced service connecting Chelsea to South Station. In June 2018, a $10 unlimited-use summer weekend fare was piloted on Commuter Rail and extended through December. That same month featured parking fee adjustments based on lot utilization rates as well as MBTA estimates placing the North–South Rail Link project cost between $12.3 billion and $21.5 billion. After a short pause, the Federal Transit Administration approved a six-month extension of the weekend fare pilot in January 2019; this pilot became permanent following approval by the Fiscal and Management Control Board in March.

Balancing the Budget and Fare Adjustments

In August 2015, MBTA leadership revised the estimated backlog for the State-of-Good-Repair to $7.3 billion, reflecting a significant increase. Although advertising revenues rose by 26 percent compared to the previous year, the Fiscal and Management Control Board noted that operating costs and debt payments were escalating at nearly triple the rate of revenue growth—forecasted to climb from $170 million in FY2016 to $427 million by FY2020 if no corrective measures were taken. Between January and August 2015, operator absences accounted for 69 percent of the 34,347 canceled bus and subway trips. In March 2016, the board sanctioned a system-wide fare hike averaging 9.3 percent. Despite this, fare evasion was estimated to cost the MBTA approximately $42 million annually, representing about one-quarter of the FY2016 budget shortfall. By June 2016, discounted passes for low-income youth were extended, with eligibility age raised to 25.

Governor Baker, by July 2016, underscored progress after a year under board supervision: operating expenses had stabilized following years of growth; operator absenteeism had dropped by 25 percent; overtime costs decreased by 30 percent; service cancellations declined by one-third; and infrastructure conditions showed improvement. Nonetheless, ongoing issues persisted concerning pension liabilities, cash-handling security, procurement processes, and maintenance of infrastructure. That same month, Baker enacted legislation limiting fare increases to a maximum of 7 percent every two years.

In October 2016, the board approved outsourcing cash-handling duties to Brink's through an $18.7 million contract spanning five years—a decision met with opposition from unions and some officials. By December, the MBTA renewed its agreement with the Boston Carmen's Union through 2021, incorporating new wage frameworks expected to reduce operating expenses by $80 million over four years. The following January, warehousing and parts distribution were also outsourced under a five-year contract valued at $28.4 million.

In April 2017, a $1.98 billion budget was approved by the board aiming to decrease the operating deficit from $42 million to $30 million. Governor Baker authorized a two-year extension for the board’s governance in May. By July, interim General Manager Steve Poftak revealed intentions to boost capital expenditures from an average of $437 million to $702 million in FY2019 while highlighting cost savings achieved through outsourcing support functions.

In November 2017, Cubic Corporation was awarded a $723 million contract over 13 years to develop and manage a new fare collection system targeted for completion by 2020. Despite a predicted operating deficit of $111 million for FY2019 announced in February 2018, the MBTA concluded FY2018 with its first balanced operating budget in ten years.

COVID-19 Pandemic

The onset of the COVID-19 pandemic in Massachusetts during February 2020 dramatically affected transit operations. Following stay-at-home advisories, many businesses closed or transitioned to remote work arrangements, causing ridership on public transportation to sharply decline—bus usage dropped roughly 78%, subway ridership fell by 92%, paratransit trips decreased by 71%, and commuter rail patronage plunged 97%. Service adjustments included implementing Saturday schedules on buses and subways during weekdays, curtailing commuter rail frequencies, and suspending ferry operations. To facilitate social distancing measures, buses operated without fares using rear-door boarding only; mask mandates were enforced for passengers; and vehicles along with stations underwent frequent cleaning protocols. Driver availability was constrained due to illness-related absences. The MBTA received federal funding totaling $827 million for fiscal years 2020 and 2021 intended to mitigate increased operational costs and lost revenues.

In June, commuter rail tickets purchased before March 10 were granted an extension of validity for an additional 90 days starting June 22. Fare modifications encouraged riders to avoid crowded buses or subways by offering discounted ten-ride passes, reducing youth fares by half-price, and expanding Zone 1A fare eligibility to include Lynn and River Works stations.

2021 budget proposal

Due to the pandemic, MBTA ridership plummeted by 87%, leading Massachusetts lawmakers and the MBTA to suggest service reductions aimed at saving more than $130 million. Proposed cuts involved discontinuing weekend commuter rail operations, ceasing train services after 9 p.m. on weekdays, eliminating 25 bus routes, and ending subway and bus runs at midnight. These changes could impact approximately 1,700 bus passengers and 733 train users but are designed to better match service levels with diminished demand while conserving resources for eventual post-pandemic recovery.

Proponents maintain that these adjustments correspond to current usage patterns and are essential for maintaining fiscal viability. The rollout would occur gradually from January through summer 2021, allowing for service modifications based on rider needs. Critics argue that the proposed cuts would disproportionately affect low-income communities and people of color who rely heavily on public transit for vital employment. They call for considering public transportation as a societal asset funded by wealthier individuals and corporations to advance mobility justice and lessen dependence on private automobiles.

See also


Further reading

  • Belcher, Jonathan, "Remnants of Abandoned Stations, Tunnels, and Station Entrances found on the MBTA" (archived 2007)
  • Bierman, Noah, "Transit archeology: Tour of abandoned subway network offers a glimpse of how the T was built," The Boston Globe, December 26, 2009
  • Cheape, Charles W., Moving the Masses: Urban Public Transport in New York, Boston and Philadelphia, 1880-1912, Harvard University Press, 1980
  • Cheney, Frank and Sammarco, Anthony Mitchell, When Boston Rode the El, Arcadia, 2000
  • Cheney, Frank, Boston's Red Line: Bridging the Charles from Alewife to Braintree, Arcadia Publishing, 2002
  • Cudahy, Brian J., Change at Park Street Under; The Story of Boston's Subways, S. Greene Press, 1972
  • McKendry, Joe, Beneath the Streets of Boston: Building America's First Subway, David R. Godine, 2006
  • Most, Doug, The Race Underground: Boston, New York, and the Incredible Rivalry That Built America's First Subway, St. Martin’s Press, 2014

External links