Leeds and Bradford Extension Railway
| Company type | Public company |
|---|---|
| Industry | Railway transport |
| Founded | June 30, 1845 |
| Defunct | July 24, 1851 |
| Fate | Leased and later absorbed by Midland Railway |
| Headquarters | Bradford , England |
Area served | West Riding of Yorkshire, England |
| Parent | Midland Railway (from 1846 lease) |
The Leeds and Bradford Extension Railway was an early railway enterprise in the West Riding of Yorkshire, England. It constructed a route beginning near Bradford that passed through and before reaching . While the Skipton–Colne section ceased operations in 1970, the remainder of the line is still active. This route once formed a segment of the Midland Railway's principal corridor connecting London with Glasgow.
Authorisation
On 30 June 1845, the Leeds and Bradford (Shipley–Colne Extension) Railway Act granted permission to build this extension to the Leeds and Bradford Railway, which was then progressing between Leeds and Bradford. By July 1846, the company was leased by the Midland Railway, which fully incorporated it on 24 July 1851.
Opening
The initial segment, running from , at a triangular junction with the Leeds and Bradford Railway, to , commenced service on 16 March 1847 following a construction contract awarded in October 1845. This phase included the creation of a tunnel at Bingley.
On 7 September 1847, the stretch from Keighley to opened as a single track, which was doubled by the end of that year. Passenger trains operated between Bradford and Skipton, with Leeds travelers transferring at Shipley.
The last portion from Skipton to was contracted in September 1846 and inaugurated on 2 October 1848. At Colne, it linked directly with the extension of the East Lancashire Railway, which began service in February 1849. By April of that year, a continuous route existed between Leeds and Liverpool, although most passenger traffic remained localized between Skipton and Colne.
Little North Western Railway
The "Little" North Western Railway constructed a line starting just west of Skipton, ultimately becoming Skipton's primary rail connection. The segment from Skipton to Ingleton opened on 30 July 1849, with through services extending to by June 1850. From January 1859, this line was leased to the Midland Railway. After the Midland's Settle-Carlisle Line opened on 1 May 1876, express trains from Leeds to Glasgow utilized the Leeds–Skipton line along with services bound for Morecambe, , and .
Partial closure
As part of the Beeching cuts implemented in 1963, services on the Skipton–Colne Line were reduced, culminating in its closure on 2 February 1970. The Skipton - East Lancashire Rail Action Partnership continues to campaign vigorously for reopening this route.
Surviving section
The segment between Shipley and Skipton remains operational as an integral part of the Airedale Line, supporting trains running on both the Leeds-Morecambe and Settle-Carlisle Lines.
References
- Awdry, C. (1990), Encyclopaedia of British Railway Companies, Patrick Stephens Ltd., Wellingborough
- Bairstow, M. (2000), The "Little" North Western Railway, Martin Bairstow, Leeds
- Binns, D. (1984), Steam in Airedale, Wyvern Publications, Skipton
- Dewick, T. (2002), Complete Atlas of Railway Station Names, Ian Allan Publishing, Hersham, , Maps 21 and 42
- Suggitt, G. (2004 reprint), Lost Railways of Lancashire, Countryside Books, Newbury
- Articles with short description
- Early British railway companies
- Midland Railway
- Companies based in Bradford
- Rail transport in West Yorkshire
- Rail transport in North Yorkshire
- Transport in the Borough of Pendle
- Railway companies established in 1845
- Railway lines opened in 1847
- Railway companies disestablished in 1851
- Defunct companies based in Yorkshire
- 1845 establishments in England
- British companies disestablished in 1851
- British companies established in 1845