Jump to content

Lynn station

From Alfawiki
Lynn station
Company typeTransit station
IndustryPublic transportation
Founded1838
Headquarters
Lynn, Massachusetts
,
United States
ProductsCommuter rail and bus services

Lynn station (also identified as Central Square–Lynn) functions as a key intermodal transit center located in downtown Lynn, Massachusetts. It accommodates the MBTA Commuter Rail on the Newburyport/Rockport Line along with various MBTA bus services.

Rail operations through Lynn commenced on August 27, 1838, with the Eastern Railroad. The initial wooden depot was succeeded by a new structure in 1848. Service on the Saugus Branch began in 1855. A contentious debate over station location in 1865, dubbed the "Great Lynn Depot War," concluded in 1872 with the construction of two stations close to each other, although one was soon torn down. The surviving station was destroyed by fire in 1889 and replaced six years later by a depot distinguished by a prominent clock tower.

After acquiring the Eastern Railroad in 1883, the Boston and Maine Railroad (B&M) launched a grade separation initiative through Lynn in 1909 as part of a broader line enhancement. Finished in 1914, this project expanded the station to include four tracks and two island platforms, altering the 1895 building. A modern brick facility replaced this structure in 1952. Passenger service on the Saugus Branch ceased in 1958; MBTA financial support for mainline operations began in 1965.

In 1992, the MBTA unveiled a new accessible island platform along with a substantial parking garage intended for an anticipated Blue Line extension that was never realized. By 2003, bus routes were relocated to a dedicated busway adjacent to this garage. On October 1, 2022, both the rail station and parking garage shut temporarily for reconstruction work, while busway operations continued uninterrupted. Temporary platforms opened nearby in December 2023.

Early history

Following railroad charters issued between 1830 and 1831 for Boston connections to Lowell, Worcester, and Providence, plans emerged for routes extending to nearby cities such as Newburyport and Portsmouth. The Eastern Railroad was officially chartered on April 14, 1836. Construction started near East Boston late that year and reached Lynn by spring of 1837; however, delays caused by the Panic of 1837 postponed completion until 1838. Service from Salem to East Boston began on August 27, 1838, offering fares at roughly half the price of competitors.

The Lynn rail line was constructed at grade level. Over time, several stations served the city, including locations near Central Square. The first Central Square station built in 1838 was a modest wooden building.

This station became notable for an early civil rights demonstration: on September 29, 1841, abolitionist leader Frederick Douglass and his companion James N. Buffum, who later served as Lynn’s mayor, were forcibly removed from an Eastern Railroad train after Douglass refused to accept segregated seating arrangements. Following this incident, trains temporarily bypassed Lynn due to fears of additional confrontations.

On June 16, 1846, shareholders authorized $450,000 worth of new stock aimed at financing branch lines and constructing new depots in Salem and Lynn. Consequently, the original station was replaced in 1848 by a brick facility featuring a two-track train shed, modeled after Salem’s station built in 1847 but smaller and lacking towers.

In the mid-1840s (1845-46), plans for a Malden-Salem rail line passing through Saugus and Lynnfield were thwarted due to opposition from the Eastern Railroad. Instead, the Saugus Branch Railroad opened between Malden and Lynn Common in 1853. Initially affiliated with Eastern’s competitor—the Boston and Maine Railroad (B&M)—this branch lacked direct connection to Eastern lines. In 1855, Eastern gained majority control over the Saugus Branch to prevent B&M access; this resulted in severing its Malden link and instead connecting it to Eastern at South Malden (Everett) and West Lynn. Afterward, Lynn became the primary terminus for this branch; some trains continued onward to Salem until World War I.

Horse-drawn streetcar service to Lynn began in 1854 via the Lynn and Boston Railroad, operating between Lynn and Boston through Charlestown, Chelsea, and Revere along Broadway and Salem Turnpike. On November 19, 1888, the Highland Circuit route of Lynn & Boston became Massachusetts’ first electrified trolley line.

The Great Lynn Depot Conflict

In 1865, the Eastern Railroad became embroiled in a major dispute known as the "Great Lynn Depot War," centered on the location for a new station. One group supported reconstructing at Central Square, while another favored Knight's Crossing at Market Street. Legislative acts passed in 1865 and 1868 endorsed the Central Square site, forbidding the closure of stations operational for over five years and mandating construction there.

Following legal proceedings that escalated to the Supreme Court and U.S. Court of Appeals, a settlement required stations to be established at both locations. Both depots commenced operations by mid-1872; however, maintaining two stations just a few blocks apart proved impractical. Consequently, the Market Street station was torn down in 1873 and replaced by a small shelter serving a limited number of trains.

This conflict over depot placement adversely affected the Eastern Railroad’s reputation in Lynn, where dissatisfaction with service was mounting. As a countermeasure, the Boston, Revere Beach and Lynn Railroad (BRB&L) began service from Market Street in 1875, directly competing until 1940. Although Lynn–East Boston service had shifted to direct Boston routes via the Grand Junction Railroad by 1854, a Lynn–East Boston connection operated from 1872 to 1880 to rival BRB&L, later reduced to a Revere–East Boston shuttle until 1905.

From the mid-1800s through the 1930s, Lynn functioned as an endpoint for select short-turn commuter trains to Boston, including seasonal services running via the Chelsea Beach Branch between 1881 and 1892.

Elevation of Tracks

The Boston and Maine Railroad (B&M) took over the Eastern Railroad in 1883. The Central Square station constructed in 1872 sustained heavy damage during the Great Lynn Fire of 1889, which devastated much of downtown. B&M responded by erecting a temporary facility utilizing portions of the damaged structure. Delays in building a new station were caused by real estate complications. Architect Bradford Gilbert was consulted in 1890; after revisions, his 1892 design included a polygonal clock tower and an expansive train shed.

Actual construction began in early 1894 under B&M architect Henry B. Fletcher, featuring a design that diverged from earlier proposals. The main station building measured 53 by 150 feet and was situated on the north side west of Silsbee Street; an eastbound building sized 25 by 105 feet stood on the south side. Both structures were built from buff-colored brick and brownstone, accented with marble flooring and slate roofing. Two side platforms were covered by wooden awnings extending 750 feet with slate roofs, while the main building boasted a pyramidal clock tower measuring 70 feet square. The new station opened in March 1895 at a cost exceeding $100,000; shortly thereafter, the old facility was demolished.

By 1901, city officials aimed to remove numerous grade crossings downtown where up to 150 main line trains and 40 Saugus Branch trains daily caused frequent street blockages. After overcoming legal obstacles, construction of an elevated viaduct commenced in September 1909. During this time, the New Haven Railroad briefly controlled B&M and planned to expand the line through Lynn to four tracks as part of broader infrastructure improvements that included consideration of a harbor tunnel. Initially, Lynn sought to lower the four-track line below street level but later consented to adapting the two-track viaduct for four tracks.

New Haven’s initiative to extend quadruple tracking to Salem and Beverly was ultimately halted due to expenses associated with grade crossings in Chelsea and Salem’s single-track tunnel constraints. Quadruple track was implemented over two miles from West Lynn Tower through Lynn station—featuring two island platforms serving all tracks—to just before Swampscott station. The depot underwent alterations during track elevation work, although these changes were not entirely favorable. Many of Lynn’s four-track bridge spans remain intact despite no longer being utilized.

B&M period

Streetcar operations to Lynn persisted under the Lynn & Boston until 1901, when the line was absorbed into the Boston and Northern Street Railway. By the early 1900s, several routes served Lynn station. In 1911, the Bay State Street Railway assumed control, later merging with the Eastern Massachusetts Street Railway in 1919. Trolley service in Lynn ceased entirely by 1938.

In 1952, the Boston and Maine Railroad erected a contemporary station utilizing the platforms built in 1914. Situated on the track's south side at Mt. Vernon and Exchange streets, this single-story brick facility included radiant heating, a dining area, and a newsstand. The previous 1895 station was demolished to create parking space. Service on the Saugus Branch concluded in May 1958, followed by the Swampscott Branch in June 1959, leaving only through trains on the Eastern Route. Around this period, two tracks were removed, resulting in two side platforms serving a pair of tracks. By late 1977, the station had fallen into disrepair with broken windows, graffiti, and deteriorating concrete.

MBTA period

By the late 1980s, both the station and its platforms showed significant wear. After freight clearance restrictions on the Newburyport/Rockport line beyond the General Electric plant in West Lynn were implemented, a full-length high-level platform was constructed west of the older low-level platforms to accommodate two tracks. A parking garage with a capacity of 1,000 vehicles and a drop-off lane was built off Market Street; meanwhile, buses continued using the existing busway on Mount Vernon Street at Central Square. A contract worth $41.3 million was awarded in April 1988 with completion targeted for fall 1989.

The upgraded station opened on January 21, 1992, with a total investment of $50 million and featured two elevators plus an escalator leading to platform level. By 1995, the escalator had ceased functioning and was later sealed off along with one elevator. The remaining elevator was among a small number operated directly by the MBTA rather than Amtrak or local entities.

In 2003, nearly $100,000 was allocated by the MBTA to refurbish the garage and transform the drop-off lane into a dedicated busway equipped with shelters and signage; this facility opened on September 9 and rerouted 21 MBTA bus lines from Central Square. In late 2005, $168,000 was spent addressing persistent leaks in the garage roof. The concrete ties installed in 1992 did not perform as expected; consequently, in September 2008, a $1 million project commenced for tie replacement and slope stabilization.

By 2015, Lynn’s parking garage exhibited the lowest usage rate among MBTA garages, partially due to safety concerns and capacity designed anticipating future Blue Line expansion. Following assaults reported within the garage, twenty security cameras were installed in 2011. Starting August 2016, a $6.1 million upgrade project began encompassing drainage improvements, sidewalk and cobblestone replacement, repairs to stairs and elevators, repainting and structural fixes to the garage, replacement of expansion joints, and platform maintenance; completion was projected for November.

During May–June and July 2020 through June 2021, Lynn and River Works stations temporarily shifted from fare Zone 2 to Zone 1A to offer additional travel options amid COVID-19-related reductions in bus service and to evaluate fare impact. This pilot program resulted in only eight daily riders transferring to commuter rail; both stations returned to Zone 2 status on July 1, 2021.

2020s Renovation

In 2019, the MBTA launched an extensive refurbishment project for Lynn station, awarding a $3.1 million contract for design services in 2021. By the close of that year, design completion had reached 15%. This $72.5 million initiative involves constructing a new island platform equipped with elevators at both access points, positioned slightly westward of the existing platform, as well as creating a new entrance west of Market Street.

On December 20, 2021, the eastern portion of the platform along with the Central Square entrance was temporarily closed. Between March and September 2022, service on the inner Newburyport/Rockport Line faced periodic suspensions to accommodate signal upgrades.

In July 2022, the MBTA declared an accelerated closure date for the commuter rail station set for July 25 due to structural deterioration; plans were made to demolish the adjacent garage in spring 2023. Following objections from local leaders, this closure was postponed until October 1, 2022. During this interval, a shuttle bus operated between Lynn and Swampscott stations, accepting Zone 2 fare tickets on a temporary basis.

To ensure continued service amid construction, temporary platforms east of Silsbee Street were designed and reached 75% design completion by June 2023, with operations anticipated to commence by mid-2024. Construction activities began in August 2023 utilizing recycled concrete slabs sourced from the Big Dig project and the temporary platform opened on December 18, 2023—arriving nine months ahead of schedule.

Demolition of the southern half of the original platform took place in late 2022 and resumed from August 2023 through January 2024; removal of the northern section is slated for mid-2024. As of June 2023, the full completion of the new permanent station is projected for 2030—a timeline that has drawn criticism from local officials concerned about its effects on Lynn’s redevelopment efforts. In June 2024, the MBTA announced that it is reassessing the permanent station’s site to better meet future requirements of both the MBTA and the City of Lynn.

Blue Line Extension

Lynn is designated as the future terminus for an extension of the MBTA Blue Line, which would extend roughly from Wonderland in Revere. This extension concept has existed for more than nine decades, with early endorsements found in the 1926 Report on Improved Transportation Facilities and the 1945–47 Coolidge Commission Report, both recommending extending the East Boston Tunnel line to Lynn via the Boston, Revere Beach & Lynn right-of-way. Subsequent proposals throughout 1966, 1969, 1974, 1978, and 1983 consistently advocated extending service to Lynn or beyond; however, funding priorities favored Red and Orange Line projects instead.

At present, no financial resources have been allocated due to MBTA’s budget limitations, rendering construction unlikely in the near future. The parking garage constructed in Lynn in 1992 was designed with anticipated Blue Line extension demand in mind but remains underused by commuter rail passengers.

Other Lynn Stations

Historically, Lynn was served by eight additional stations located at various points—none of which have survived into MBTA operation—and a ninth station inaugurated in 1965. The Eastern Railroad operated East Lynn station from 1880 until service on the Marblehead Branch ended in 1959. While staircases leading to the former East Lynn station still exist, no original buildings remain. The depot built in 1896 was moved in 1912 to Durham, New Hampshire; it currently functions as a University of New Hampshire facility and serves as an Amtrak Downeaster stop.

West Lynn station was situated near Commercial Street at the junction with the Saugus Branch Railroad; Green Street station briefly existed east of Central Square. Both structures have since been demolished. The Boston, Revere Beach & Lynn Railroad maintained its own Lynn depot close to Market Street and West Lynn station adjacent to the Eastern Railroad’s station; neither structure survives today.

The Saugus Branch Railroad began operations between Boston and Lynn in 1853, serving multiple stops including Central Square, West Lynn, Lynn Common, Raddin's Station, and East Saugus. These stations were abandoned around 1943 as a measure to reduce tax liabilities. Passenger service ended in May 1958; this branch line has since been converted into a rail trail. None of these original station buildings remain intact.

River Works station located in West Lynn on the Newburyport/Rockport Line opened in 1965 under the name G.E. Works and serves exclusively employees of GE Aviation. Nearby Swampscott station also provides service for passengers from eastern Lynn.

External links