MTR CRRC Changchun EMU
| Industry | Rail transport manufacturing |
|---|---|
| Headquarters | Changchun , China |
| Products | Electric multiple units |
The MTR CRRC Changchun EMU, also referred to as the TML C-train, is an electric multiple unit designed for heavy rail operations and currently operated by Hong Kong's Mass Transit Railway. Produced by Changchun Railway Vehicles, these 8-car trainsets operate along the East West Corridor, specifically on the Tuen Ma Line, running alongside extended SP1900 sets (1151) originally from the West Rail line. Their service commenced in 2017.
Description
Commonly dubbed the "pseudo-SP1900," the TML C-train’s exterior bears a strong resemblance to that of the SP1900, though notable distinctions exist at the cab ends. The train’s color scheme matches that of the R-trains serving the East Rail line, as well as the S-trains on the South Island line and the Q-trains operating on urban routes—both latter models also manufactured by Changchun.
Inside, the train incorporates an updated version of the SP1900 interior layout, highlighted by a newly designed dynamic route map display positioned above each doorway. Seating arrangements have been modified to feature three seats between doors instead of four as found in the SP1900, while two clusters of five seats remain at each carriage end. Passenger information systems include 22-inch LCD screens, an enhancement over the 15-inch displays installed in SP1900 trains. Although the electrical and propulsion components are similar to those used in East Rail’s R-Trains, there are distinct technical differences.
The procurement contract (stock bid 1141A) was granted to China CRRC Changchun Railway Vehicles Corporation Limited in December 2013, valued at HK$1.38 billion. Initially, 14 eight-car units were ordered, but this quantity was later increased to 17 trains, likely reflecting plans for the Tuen Mun South extension. The first unit was introduced into service on the Ma On Shan line in March 2017 and subsequently began operations on the West Rail line in March 2020. Presently, all 17 trainsets serve the entire length of the Tuen Ma line, which officially opened on 27 June 2021.