Nickel West
| Company type | Subsidiary |
|---|---|
| Industry | Mining |
| Founded | 1960s |
| Founder | Western Mining Corporation (original) |
| Headquarters | Western Australia , Australia |
| Products | Nickel, Cobalt (as by-product) |
| Owner | BHP |
Number of employees | 1,600 (affected by 2024 shutdown) |
| Parent | BHP |
Nickel extraction in Western Australia has undergone considerable variability, largely influenced by unstable international nickel market prices, which have led to the repeated shutdown and reopening of mining sites.
Nickel ranks as the sixth most valuable commodity sector in Western Australia, with a valuation of $4.946 billion recorded in 2021–22. That year saw sales of 147,190 tonnes, accounting for 5.5% of the world’s nickel output and representing the entirety of Australia's production. Interestingly, despite the lowest production levels in twenty years, the sales revenue for 2021–22 reached a 15-year peak.
From 1997 until 2022, Western Australia was the exclusive source of nickel production in Australia, until concentrate production resumed at the Avebury project in Tasmania in October 2022.
Australia, predominantly Western Australia, possesses approximately one-third of the global known reserves of nickel laterite and sulfide ores. As of 2011, it stood as the fifth-largest nickel producer worldwide. Beyond Western Australia, significant nickel refining takes place at a facility in Yabulu, Queensland, which processes ore sourced from New Caledonia, Indonesia, and the Philippines.
Cobalt emerges as a valuable secondary product from nickel mining operations in Western Australia, with 5,314 tonnes produced valued at $522 million during 2021–22.
Early mines
Nickel mining in Western Australia began in the late 1960s with developments at Kambalda, Laverton, Western Australia, and within the Kimberley region. Nickel prices surged to nearly £7,000 per pound by late 1969, fueled by wartime demand from Vietnam and supply interruptions involving Canadian firm Inco (now Vale Canada). In November 1969, a prospector working for Poseidon NL uncovered promising nickel deposits at Mount Windara near Laverton, igniting an investment frenzy as share prices escalated dramatically from $0.50 to $280 by February 1970.
This find triggered an exploration surge during the early 1970s as companies raced to discover new deposits. Western Mining Corporation (WMC) acquired Poseidon and developed it into a significant mining and processing site until 1989. Initial assessments identified 8.5 million tonnes of ore grading 2.02% nickel, equating to approximately 172,000 tonnes of contained metal. The inaugural shipment of nickel concentrate occurred in 1974 amid falling prices. By 1990, WMC had extracted around 5 million tonnes of ore averaging 1.59% nickel content, yielding about 80,000 tonnes of metal.
Mining activities at Windara continued sporadically through the 1990s; several Kambalda mines were divested while remaining assets were merged into the Windarra Nickel Mine, which entered care and maintenance status by 2012.
In 2005, WMC was purchased by BHP and subsequently removed from the Australian Securities Exchange listings.
The Poseidon bubble’s influence on both the nickel industry and investment environment was depicted in the 1971 movie Nickel Queen.
Nickel West
Nickel West represents a segment of BHP, consolidating its nickel operations across Western Australia under one umbrella known as Nickel West Operation. This encompasses assets such as the Mount Keith Mine, Leinster Nickel Mine, Kambalda Nickel Concentrator, Kalgoorlie Nickel Smelter, and Kwinana Nickel Refinery.
In 2008, Nickel West’s production reached 85,800 tonnes of nickel, including contributions from the Ravensthorpe Nickel Mine. By 2012, there were indications that BHP might consider selling these operations.
Facing a global surplus and declining prices for nickel, BHP announced on 11 July 2024 that all Nickel West operations would temporarily cease from October 2024 onward and be placed under care and maintenance. This decision impacts around 1,600 employees. The company intends to reassess this status in February 2027 while continuing to invest $450 million annually to maintain readiness for potential reactivation. Affected workers will be offered options including redeployment or redundancy packages.
Current nickel mining activities
Per the Department of Mines, Industry Regulation and Safety, the key nickel mines operating in Western Australia during 2022–23 are as follows:
| Mine | Owner | Location | Production(tonnes) | Period | Source |
|---|---|---|---|---|---|
| Leinster Nickel Mine | BHP | Shire of Leonora | 80,000Template:Ref | 2022–23 | [1] |
| Mount Keith Mine | BHP | Shire of Wiluna | |||
| Ravensthorpe Nickel Mine | First Quantum Minerals | Shire of Ravensthorpe | 21,725 | 2023 | Cite error: The opening <ref> tag is malformed or has a bad name
|
| Forrestania Operations | IGO | Shire of Kondinin | 11,931 | 2022–23 | [2] |
| Nova Operations | IGO | Shire of Dundas | 22,915Template:Ref | 2022–23 | [2] |
| Murrin Murrin Mine | Minara Resources | Shire of Laverton | 31,100Template:Ref | 2023 | [3] |
| Kambalda Nickel Operations | Wyloo Metals | Shire of Coolgardie | 1,404Template:Ref | 2021–22 | Cite error: The opening <ref> tag is malformed or has a bad name
|
| Savannah Mine | Panoramic Resources | Shire of Halls Creek | 5,402Template:Ref | 2022–23 |
- During 2022–23, Nova Operations additionally yielded 10,266 tonnes of copper and 803 tonnes of cobalt.
- The production total for BHP encompasses all Nickel West operations.
- In 2023, Murrin Murrin also generated 2,100 tonnes of cobalt.
- Kambalda began production in 2022; ownership transferred to Wyloo Metals in 2023; planned for care and maintenance starting May 2024.
- Savannah produced an extra 3,129 tonnes of copper and 368 tonnes of cobalt in the period 2022–23; it was placed under care and maintenance as of January 2024.
Nickel processing plants
In the fiscal year 2020–21, BHP operated three nickel processing facilities within Western Australia: the Kalgoorlie Nickel Smelter, the Kambalda Nickel Operations#Kambalda Nickel Concentrator, and the Kwinana Nickel Refinery. Concurrently, the Murrin Murrin nickel refinery was managed by Minara Resources.
Past mining operations
The following table lists previous nickel mining sites:
| Mine | Owner | Location | Production period | Production(tonnes) | |
|---|---|---|---|---|---|
| Beta Hunt Mine | Karora Resources | Shire of Coolgardie | 1973–2008, 2014–2018 | ||
| Black Swan Nickel Mine | Poseidon Nickel | City of Kalgoorlie–Boulder | 1997–2008 | 179,000 | |
| Bulong Nickel Mine | Wingstar Investments | City of Kalgoorlie–Boulder | 1998–2003 | ||
| Cawse mine | Wingstar Investments | City of Kalgoorlie–Boulder | 1999–2008 | ||
| Cosmos Nickel Mine | IGO | Shire of Leonora | 2000–2012 | 127,000 | |
| Emily Ann and Maggie Hays nickel mines | Poseidon Nickel | Shire of Dundas | 2001–2009 | ||
| Lanfranchi Tramways Nickel Mine | Black Mountain Metals | Shire of Coolgardie | 2005–2015 | ||
| Radio Hill Nickel Mine | Artemis Resources | City of Karratha | 2004–2008 | ||
| Waterloo Nickel Mine | Northern Star Resources | Shire of Leonora | 2006–2008 | ||
| Windarra Nickel Mine | Poseidon Nickel | Shire of Laverton | 1974–1978, 1981–1991 | 93,446 |
Fatal Incidents
Several fatal accidents have occurred within Western Australia's nickel mining sector, including:
- On 27 April 1977, five workers perished at the Perseverance shaft of the Leinster Nickel Mine after a 35-metre fall inside an ore bucket.
- In 1981, a collapse underground at Leinster mine resulted in one fatality. Later, on 11 December 1985, two men lost their lives due to asphyxiation underground—one during an attempted rescue of the other. Another fatal fall occurred on 11 April 2010 within the mine's subterranean operations.
- On 9 June 1978, two staff members at the Kwinana Nickel Refinery, J. W. Bell and S. J. Haywood, died from asphyxiation caused by nitrogen gas inhalation after Bell collapsed in a hazardous atmosphere likely linked to a defective face mask seal.
Environmental Contamination
The Bulong Nickel Mine, which operated between 1998 and 2003, faced remediation expenses projected at $6.8 million by April 2016, with $6 million already spent. The A$1.1 million security bond from previous proprietors proved inadequate to cover these costs. Since 2013, mining operators have contributed roughly one percent of their profits into a rehabilitation fund that becomes accessible only once it accumulates $500 million. In 2016, this milestone was estimated to require two decades to achieve, leaving statewide restoration costs—estimated around $60 million for sites such as Bulong—unfunded.
Due to issues surrounding abandoned tailings dams and evaporation ponds at Bulong following lease expiry in 2013—and concerns about potential effects on nearby Lake Yindarlgooda—the Western Australian Department of Mines, Industry Regulation and Safety initiated an extensive inquiry culminating in a detailed report published in 2021.
Statistics
Annual data reflecting the Western Australian nickel mining industry:
| Category | 1990 | 1991 | 1992 | 1993 | 1994 | 1995 | 1996 | 1997 | 1998 | 1999 |
|---|---|---|---|---|---|---|---|---|---|---|
| Production (tonnes/year) | 47,830 | 54,490 | 50,170 | 53,270 | 61,110 | 92,990 | 103,300 | 114,100 | 135,190 | 125,770 |
| Production value (A$ billion) | 0.586 | 0.596 | 0.490 | 0.472 | 0.459 | 0.897 | 1.097 | 1.051 | 1.146 | 0.877 |
| Category | 2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 |
|---|---|---|---|---|---|---|---|---|---|---|
| Production (tonnes/year) | 143,930 | 167,450 | 179,460 | 191,680 | 182,210 | 180,420 | 183,560 | 173,660 | 172,360 | 178,390 |
| Production value (A$ billion) | 1.806 | 2.239 | 2.002 | 2.458 | 3.031 | 3.503 | 3.815 | 8.059 | 5.142 | 2.997 |
| Workforce | 5,038 | 5,160 | 4,699 | 5,714 | 6,704 | 9,423 | 10,583 | 12,736 | 13,307 | 7,561 |
| Category | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 |
|---|---|---|---|---|---|---|---|---|---|---|
| Production (tonnes/year) | 180,150 | 192,450 | 208,540 | 228,300 | 232,673 | 183,320 | 175,752 | 157,564 | 163,374 | 154,383 |
| Production value (A$ billion) | 4.041 | 4.649 | 3.712 | 3.625 | 3.419 | 3.17 | 2.203 | 2.095 | 2.636 | 2.700 |
| Workforce | 7,266 | 9,168 | 8,798 | 7,664 |
| 2020 !style="width:60px"|2021 !style="width:60px"|2022 !style="width:60px"|2023 |- style="text-align:center;" |
Production (tonnes/year) | 153,516 | 158,710 | 147,190 | 160,371 |- style="text-align:center;" |
Production value (A$ billion) | 3.168 | 3.480 | 4.946 | 5.743 |- style="text-align:center;" |
Full-time employees | 7,500 | 7,553 | 8,301 | 9,839 |- style="text-align:center;" |
Total personnel on site | 7,285 | 7,345 | 8,294 | — | } Notes
External links |
|---|