Nine Mile Point Nuclear Station
Company typeNuclear power plant
IndustryEnergy
Founded1969
Headquarters
Scriba
,
United States
Area served
New York, United States
ProductsElectricity generation
OwnerConstellation Energy (Unit 1 fully, 82% of Unit 2), Long Island Power Authority (18% of Unit 2)
ParentConstellation Energy

Nine Mile Point Nuclear Station is a nuclear power plant situated in Scriba, New York, approximately five miles northeast of Oswego along the shore of Lake Ontario. This location also accommodates the James A. FitzPatrick Nuclear Power Plant.

In April 2011, Exelon, headquartered in Chicago, revealed its intention to acquire Constellation Energy, the entity owning and operating Nine Mile Point. Following approval from FERC, the merger was finalized on March 12, 2012, with Constellation adopting the Exelon brand. However, in 2022, Exelon separated its generation assets back into Constellation Energy. Currently, Constellation holds full ownership of Unit 1 and an 82% stake in Unit 2, while the Long Island Power Authority owns the remaining 18%. Both Units 1 and 2 are operated by Constellation and utilize boiling water reactor (BWR) technology.

Units 1 and 2

The two reactors are General Electric-designed boiling water reactors (BWR). Unit 1 is a BWR-2 model (Generation 2) that commenced operations in 1969 with a capacity of , making it the longest-serving commercial nuclear reactor in the United States. Unit 2, classified as a BWR-5, has been operational since 1988 and has a generating capacity of 1,375 MW. Initially commissioned by Niagara Mohawk Power Corporation, ownership remained with them until the plants were sold to Constellation in 2001.

On October 31, 2006, the Nuclear Regulatory Commission extended the operating licenses by 20 years: Unit 1's license now runs through 2029, while Unit 2's extends until 2046.

Unit 2 features a cooling tower standing at 543 feet tall, visible from nearly 30 miles away near Chimney Bluffs, New York. In contrast, Unit 1 cools directly using water from Lake Ontario and does not possess a cooling tower.

In May 2011, General Electric alerted the plant operator about possible calculation errors that might have led to reactor fuel temperatures exceeding expected safety margins.

In 2016, then-Governor of New York Andrew Cuomo instructed the Public Service Commission to evaluate subsidies funded by ratepayers aimed at supporting nuclear plants’ financial viability amid competition from natural gas sources. This directive excluded the Indian Point facility.

Withdrawn unit 3 proposal

Unistar Nuclear, a partnership between Constellation Energy and Électricité de France (EDF), announced plans in late 2008 to file a combined construction and operating license (COL) application for a European Pressurized Reactor (EPR) at the Nine Mile Point site owned by Constellation Energy. Within a year, Unistar requested a temporary halt to the application review process and ultimately withdrew the application in 2013 due to the absence of federal loan guarantees.

Electricity production

Annual Electricity Output (MWh) at Nine Mile Point Nuclear Generating Station
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Annual Generation
2001 1,309,751 1,082,371 996,634 792,703 839,639 1,213,015 1,042,234 1,165,283 1,233,386 1,197,046 1,259,445 1,098,455 13,229,962
2002 1,301,564 1,183,386 857,629 772,513 1,226,472 1,250,520 1,272,099 1,255,248 1,243,747 1,260,796 888,453 730,464 13,242,891
2003 1,318,106 1,086,660 1,037,882 838,868 1,219,947 1,226,521 1,068,496 1,016,544 1,244,842 1,288,636 1,221,228 1,298,812 13,866,542
2004 1,132,313 1,174,594 791,970 495,639 1,249,267 1,236,082 1,282,314 1,248,743 1,163,039 1,268,515 1,271.877 1.287.183 13.601.536
2005 1.317.483 1.188.926 1.101.125 826.387 1.214.595 1.232.033 1.264.159 1.237.864 1.235.761 1.303.254 1.271.780 1314381 14.507.748
2006 1311929 1157117 845319 884828 1305932 1181231 1278746 1279037 1253733 1302056 1268169 1316237 14.384.334
2007 1317419 1153677 826238 1032859 1218774 1246426 1276739 1244518 1208667 1291728 847849 1299130 13.964.024
2008 1316569 1225699 1037712 787827 1297804 1237640 1268441 1279355 1243369 1232911 1150627 1309769 14.387.723
2009 1316673 1169505 1129488 1083746 1309346 1255222 1286215 1277742 1249653 1253744 1268150 1315012 14.914.496
2010 1185280 1167767 1312218 494373 1189133 1243776 1279385 1285670 1249015 1298050 1214643 1319743 14.239.053
2011 1310649 1178658 1120852 941175 1048935 1258797 1275745 1093570 1247499 1305602 1272676 11014611 14.155.619
2012 1316184 1130245 1304973 658199 461139 881195 1154809 13875219 1275120 1351902 961481 1282495 13.165.263
2013 1435237 1289866 14333011 1131870 1163963 13687311 13447411 13968201 13588151 14159311 13277191 11793391 15.846333
2014 1415857 1288293 959694 486946 1360306 1344023 1402344 1398963 1347028 1420433 1386105 1429188 15.239180
2015 1432717 1123379 1166683 11948511 1410404 1366225 1396404 1387647 1284343 1427155 13861811 1422087 15.998076
2016 1434258 13391411 14260351 754831 1245904 13620141 13906601 13886181 13564871 14109251 11524241 12390751 15.500372
2017 1387866 12126791 11714431 12962981 14192871 13617091 13656721 12692401 13131581 14081171 13616251 14257861 15.992880
2018 14254221 12841091 13648051 888698 900404 12904091 13863021 12950571 13459351 14070261 13748311 14198321 15.382830
2019 14233641 12578911 11490661 926790 13283621 13643041 13887991 13885381 14360641 13704961 13681691 14195331 15.821376
2020 14280831 12831071 567783 12238201 14233231 13611611 13838811 13845091 13560531 14150701 13822241 14315941 15.640608
2021 14339881 12745121 12560941 12013831 14119351 13520441 13937581 13739781 13530741 13872251 13543431 14140581 16.206392
2022 14108941 11864091 701970 12246821 13990411 13459471 13751761 13675151 951058 14069441 13701381 14210571 15.790831
2023 14044441 12232761 10810051 10441501 14029441 13488181 13667131 13762291 11435311 13754471 13477641 13925801 15.506901
2024 13955211 12990251 655002 13673271 14041581 13471681 13764911 13813491 11802941 13977571 13134741 13669771 15.484543
-- Data for upcoming years is incomplete --

Surrounding population

The Nuclear Regulatory Commission identifies two distinct emergency planning zones around nuclear facilities: a 10-mile plume exposure pathway zone, which concentrates on airborne radioactive hazards, and a 50-mile ingestion pathway zone, which addresses the risk of consuming contaminated food and beverages.

As of 2010, the number of residents living within a 10-mile radius of Nine Mile Point was 35,632, representing a 17.0% rise compared to the previous ten years. Within a 50-mile radius, the population totaled 909,523, reflecting a 3.2% growth since 2000. Notable urban centers in this area include Syracuse, located approximately 36 miles away.

1991 site area emergency

On August 13, 1991, Nine Mile Point declared a "site area emergency" (SAE) following an electrical malfunction that momentarily disrupted power to the reactor and control room. At that time, this event was only the third SAE ever declared at a U.S. nuclear facility.

The issue originated in phase B of Unit 2's main power transformer, which caused the main generator, turbine, and reactor to trip. This voltage drop led to the failure of five Non-Class 1E uninterruptible power supplies (UPS), whose backup batteries had deteriorated due to age. Consequently, critical systems such as control room annunciators, safety parameter displays, control rod position indicators, plant process computers, and communication equipment were compromised.

Despite these obstacles, plant operators executed a safe reactor shutdown in accordance with emergency procedures. The facility achieved cold shutdown status roughly 13 hours after the event, and the SAE was lifted about one hour thereafter. There were no injuries or radiation leaks reported.

Seismic risk

According to a 2010 NRC assessment, the annual probability of an earthquake causing core damage at Nine Mile Point is estimated at 1 in 238,095 for Reactor 1 and 1 in 178,571 for Reactor 2.