Jump to content

North Point station

From Alfawiki
North Point station
Company typeMTR station
IndustryPublic transport
Founded1985-05-31
Headquarters
North Point, Hong Kong Island
,
Hong Kong
ProductsRailway transport services

North Point () serves as a station on Hong Kong's MTR network and acts as the western endpoint of the , situated within the North Point area on Hong Kong Island. The station is distinguished by its tomato orange color scheme and provides a cross-platform interchange connecting the Island line and Tseung Kwan O line. It holds the distinction of being the northernmost stop along the Island line.

Island line

The construction of the station concourse was undertaken by Leighton Contractors (Asia), while Paul Y. Engineering was responsible for building the tunnels and platforms. The station commenced operations on 31 May 1985, coinciding with the completion of the Island line. Up until 2001, it featured a stacked side platform design, where trains heading toward Sheung Wan used the upper platform and those bound for Chai Wan utilized the lower one.

Tseung Kwan O line

From 2001 to 2002, an expansion project was carried out to facilitate a cross-platform interchange with the Kwun Tong line. Nishimatsu Construction received the contract for this extension, beginning their work in July 1998. Additional platforms were constructed opposite the existing ones, temporarily designating North Point as the terminus for the Kwun Tong line. On 4 August 2002, the segment of the Tseung Kwan O line extending to Yau Tong opened, introducing passengers to the new interchange arrangement. Since 18 August 2002, North Point has functioned both as an interchange station and as the terminus for the Tseung Kwan O line.

In 2001, architect Tao Ho collaborated with local schoolchildren to install North Point, My Neighbourhood, a mural illustrating recognizable scenes from the surrounding community.

Station layout

G - Exits
- Walkway MTRshops
Walkway to all exits
L1 Concourse Customer Service, MTRshops
Vending machines, Automatic teller machines
Octopus Promotion Machine
L2
Platforms
Platform 2 ← Template:Rcb towards Template:STN (Template:STN)
Island platform, doors open left for Island line, right for Tseung Kwan O line
Platform 4 ← End of Template:Rcb, platform for alighting only
L3
Platforms
Platform 1 Template:Rcb Island line towards Template:STN (Template:STN) →
Island platform, doors open right for Island line, left for Tseung Kwan O line
Platform 3 Template:Rcb Tseung Kwan O line towards Template:STN or LOHAS Park station (Quarry Bay) →

Although transferring here requires a longer walk compared to other MTR cross-platform interchanges, it remains more convenient than changing lines via corridors at Quarry Bay station.

Entrances and Exits

All station exits open onto King's Road and adjacent streets nearby:

  • A1: Java Road
  • A2: Marble Road
  • A3: Odeon Plaza
  • A4: Shu Kuk Street
  • B1/B2/B3: King's Road
  • B4: Tsat Tsz Mui Road

Transport Links

A significant bus terminus is situated at the North Point Ferry Pier (accessible via Exit A1). Additional transportation modes such as buses, trams, and taxis can be reached from King's Road through Exits B1 and B3.

Ferry Services

The North Point Ferry Pier (Exit A1) provides routes to Hung Hom, Kowloon City, and Kwun Tong. Passengers should use Exit A1 and continue along Shu Kuk Street to reach the pier.

Special Train Operations

To alleviate congestion during morning peak hours on the Kennedy Town-bound platform, certain trains from Chai Wan Depot commence service at North Point after traveling empty.

Upcoming Developments

Once the North Island line is finalized, North Point will function as an intermediate stop on the Tseung Kwan O line. Trains will operate through , , and en route to , running parallel to the Island line. This enhancement is expected to considerably ease overcrowding on Kennedy Town-bound trains during morning rush periods.

See also

References