Jump to content

Ohio Southern Railroad (1881–1898)

From Alfawiki
Ohio Southern Railroad
Company typeRailroad
IndustryRail transport
PredecessorSpringfield, Jackson and Pomeroy Railroad
Founded1878
Defunct1905
FateMerged with Detroit and Lima Northern Railway to form Detroit Southern Railroad; later acquired by Detroit, Toledo and Ironton Railway
Headquarters
United States
Area served
Ohio
ProductsRail freight and passenger transport

The Ohio Southern Railroad operated between Ironton, Ohio and Lima, Ohio from 1893 until 1905. It began in 1878 as the narrow gauge Springfield, Jackson and Pomeroy Railroad, connecting Jackson-Wellston in Jackson County to Springfield, Ohio. By 1880, the route was converted to standard gauge and rebranded as the Ohio Southern Railroad in 1881. Branch lines were initiated from Jeffersonville toward Columbus and Cincinnati, but these extensions were never completed. The railroad reached northward to Lima by September 1893, featuring a bridge over the Great Miami River at Quincy. At Lima, freight interchange was available with the Lima Northern Railway, which was renamed the Detroit and Lima Northern Railroad (D&LN) in 1898. Remaining Ohio Southern depots can be found in St. Johns, Uniopolis, Jackson Center, Quincy, and Rosewood.

History

Originally conceived as a narrow gauge line to connect southeastern Ohio’s mineral-rich areas with Springfield, Fort Wayne, and Chicago, the Ohio Southern Railroad never extended beyond Ohio before its acquisition by the Detroit, Toledo & Ironton (DTI), a railroad serving Detroit’s automotive sector. Established in 1874 as the Springfield, Jackson & Pomeroy Railroad, it was created to link those communities and competed with the earlier Dayton & South Eastern (D&SE), which followed a longer route.

Both railroads focused on transporting coal from Jackson and Wellston. Construction on the SJ&P commenced in December 1876 with capital of $800,000 raised over two years. By mid-1877, two separate routes were operational; a branch line to Eureka was finished in 1878 along with several spurs servicing coal mines.

Following a sheriff’s sale in 1879, Oliver S. Kelly and partners formed the Springfield Southern Railroad Company and converted the track to standard gauge. The company was renamed Ohio Southern Railroad Company in 1881 and saw improved financial performance under lease by the Indiana, Bloomington & Western Railroad (IB&W), which connected Indianapolis to Springfield alongside Chesapeake & Ohio Railway expansion efforts. IB&W’s control ended in April 1892.

In December 1892, the Ohio Southern extended its mainline northward from Springfield to Lima; this extension was finalized by December 1893. Additional spurs serving Wellston and nearby coal mines were also constructed. However, financial difficulties resulting from this expansion forced the railroad into receivership by May 1895. Bondholders acquired the line in October 1898, terminating its independent operations.

Extension to Ironton

On February 11, 1848, the Ohio General Assembly chartered the Iron Railroad Company, which constructed a six-mile track from Ironton to the Vesuvius Tunnel Mines between 1849 and 1850. By 1853, this line extended to Center Station. In 1858, a wrought iron truss bridge patented by W. H. Moseley and manufactured in Cincinnati replaced an earlier crossing over Sterrns Creek. This bridge remained operational until 1924 before being relocated to Michigan’s Henry Ford Museum.

Cincinnati, Columbus & Hocking Valley Railroad

Between November 28, 1883, and May 31, 1884, the Ohio Southern managed the Cincinnati, Columbus & Hocking Valley (CC&HV) line, which extended from Jeffersonville westward to Claysville Junction on the Little Miami Railroad’s main route connecting Cincinnati and Xenia. Initially established in 1875 under the name Waynesville, Port William & Jeffersonville Railroad Co., it completed 15 miles by 1877 before reorganizing as the Columbus, Washington & Cincinnati Railroad Co. The W&C was fully abandoned by 1887 with its rails dismantled. In March 1884, Ohio Southern acquired a portion of this route's roadbed to develop a Cincinnati-Columbus connection passing through Sedalia, Jeffersonville, and Kingman; however, this incomplete line was gradually discontinued between 1931 and 1941.

The Detroit & Lima Northern (D&LN) sought to establish a route from Columbus to Fort Wayne through the Columbus Northwestern Railway (CNW), which was incorporated in August 1897. By August 1898, CNW had constructed a stretch from Columbus Junction (later known as Salter's) to Peoria. The D&LN finalized a connection from Columbus Junction to St. Mary's by November of the same year and leased the segment from Lima to Columbus Junction from Ohio Southern to CNW. Nevertheless, bondholders who took control of Ohio Southern in 1889 declined to extend this lease agreement. Consequently, on December 1, 1900, D&LN terminated its association with CNW and stopped operating services into Columbus via the Toledo and Ohio Central Railway. Subsequently, CNW was integrated into the T&OC system.

Merger

In 1901, Ohio Southern Railway combined with Detroit and Lima Northern Railway to create the Detroit Southern Railroad. This entity was acquired through foreclosure on May 1, 1905, by Harry B. Hollins & Company based in New York and was reorganized under Michigan law as the Detroit, Toledo and Ironton Railway.

Stations

Ohio Southern’s primary route in Ohio ran from Lima down to Ironton. Important stations along this north-to-south corridor included:

Lima to Springfield

Springfield to Washington C.H.

Washington C.H. to Greenfield

Greenfield to Jackson

Jackson to Lisman

Following SR 93:

  • Jackson
  • (various stops not specifically identified)

Lisman to Ironton

Following SR 93: