Perry Nuclear Generating Station
| Company type | Nuclear power plant |
|---|---|
| Industry | Energy |
| Founded | November 18, 1987 in Perry, Ohio, United States |
| Headquarters | Perry , United States |
Area served | Ohio, United States |
| Products | Electricity generation (nuclear power) |
| Owner | Vistra Corporation |
| Parent | Vistra Corporation |
The Perry Nuclear Power Plant is located on a site along Lake Erie, approximately northeast of Cleveland, Ohio. Ownership and operation of the facility are held by Vistra Corporation.
This facility utilizes a General Electric BWR-6 boiling water reactor equipped with a Mark III containment system. Originally, the reactor's core thermal output was rated at 3,579 megawatts, which was increased to 3,758 megawatts thermal in 2000, placing Perry among the highest-powered BWRs in the United States.
Although initially planned to cease operations in 2021 due to financial challenges competing with natural gas plants, Perry’s continued function was secured through Ohio House Bill 6 passed in July 2019. This law introduced a surcharge on utility bills for Ohio residents to fund $150 million annually in subsidies shared between Perry and the Davis–Besse Nuclear Power Station, thereby guaranteeing ongoing operation. Subsequently, this legislation became a focal point of the Ohio nuclear bribery scandal revealed by the Department of Justice in July 2020.
History
Originally conceived as a two-reactor complex, construction on Unit 2 was halted in 1985 and officially cancelled in 1994. At the time of cancellation, all major structures for Unit 2—including a cooling tower—were completed. Although there remains potential to develop a second unit on the premises, prevailing economic factors, regulatory hurdles, and outstanding taxes associated with "abandon in place" designations significantly reduce this likelihood.
In 1993, the National Institute for Urban Wildlife designated 1,100 acres at Perry as an urban wildlife sanctuary. The area includes various habitats such as wetlands that support endangered species like the spotted turtle. This initiative reflects the plant’s commitment to environmental stewardship consistent with industry standards.
On March 28, 2010, a fire broke out within a lubrication system for a water pump, causing reactor power to decrease to 68%. The fire was extinguished within three hours without interrupting power supply to customers; two firefighters received treatment for heat stress. On February 9, 2016, an unplanned shutdown occurred to perform maintenance on a recirculation pump; full power operations resumed by February 20.
Vistra Corporation currently owns and operates Perry alongside the Davis-Besse and Beaver Valley nuclear facilities. In July 2023, Energy Harbor submitted an application for a twenty-year license renewal for Perry Unit 1. The U.S. Nuclear Regulatory Commission granted official approval of this extension on July 7, 2025, permitting operation through November 7, 2046.
In March 2024, Texas-based Vistra Corporation completed its acquisition of Energy Harbor Corporation along with its nuclear generation assets, thereby strengthening its footprint within the nuclear energy sector.
| Unit 1 | Unit 2 | |
|---|---|---|
| Reactor Type | BWR-6 | |
| Reactor Manufacturer | General Electric | |
| Turbine Manufacturer | ||
| Thermal Power | 3,758 megawatts | Unit cancelled in 1994 |
| Electrical Output | 1,260 megawatts | |
| Transmission System Connection | 345,000 volts | |
| Construction Permit Issued | May 3, 1977 | May 3, 1977 (construction halted in 1985) |
| Initial Criticality | June 1986 | Unit cancelled in 1994 |
| First Electrical Generation | November 13, 1986 | |
| Operational Date | November 18, 1987 | |
| Expiration of Original License | March 18, 2026 | |
Electricity production
| Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Total Annual Output |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2001 | 822,248 | 402,972 | 123,568 | 798,883 | 142,023 | 802,067 | 324,672 | 912,057 | 900,239 | 930,817 | 900,034 | 719,864 | 7,779,444 |
| 2002 | 918,229 | 799,411 | 939,038 | 900,714 | 930,813 | 481,701 | 909,817 | 918,977 | 594,820 | 745,370 | 904,754 | 931,166 | 9,974,810 |
| 2003 | 930,209 | 764,817 | 788,525 | 82,043 | |||||||||
| 867,503 | 919,276 | 678,084 | 809,632 | 920,924 | 856,928 | 935,145 | 8,545,176 | ||||||
| 2004 | 903,869 | 876,390 | 916,173 | 900,902 | 624,410 | 694,868 | 918,960 | 919,636 | 872,942 | 919,947 | 899,443 | 779,786 | 10,227,326 |
| 2005 | 121,586 | 549,786 | |||||||||||
| 640,649 | 888,993 | 912,172 | 910,533 | 890,892 | 912,803 | 902,642 | 938,200 | 7,646,648 | |||||
| 2006 | 904,098 | 848,230 | 936,789 | 880,942 | 798,087 | 894,530 | 906,324 | 915,903 | 878,179 | 918,424 | 903,221 | 690,646 | 10,475,373 |
| 2007 | 925 ,628 | 841 ,117 | 906 ,738 | 8 ,911 | 294 ,340 | 684 ,060 | 168 ,786 | 931 ,004 | 898 ,058 | 929 ,063 | 837 ,810 | 632 ,732 | 8 058 247 |
| 2008 | 951 ,553 | 891 ,180 | 886 ,866 | 598 ,092 | 940 ,362 | 880 ,150 | 921 ,451 | 928 ,586 | 890 ,697 | 950 ,446 | 914 ,227 | 936 ,983 | 10 690 593 |
| 2009 | 944 877 | 657 957 | |||||||||||
| 392 649 | 676 761 | 907 675 | 928 035 | 904 217 | 440 263 | 812 520 | 948 929 | 7 596 472 | |||||
| 2010 | 948 792 | 844 351 | 929 709 | 890 359 | 680 413 | 827 853 | 903 208 | 921 538 | 899 634 | 924 231 | 910 835 | 938 788 | 10 619 711 |
| 2011 | 937 494 | 834 829 | 876 861 | 436 568 | |||||||||
| 543 044 | 918 578 | 927 009 | 875 211 | 373 434 | 911 926 | 934 434 | 8 560 849 | ||||||
2012
941 442 886 315 795 538 373 434 932 521 619 344 914 450 869 909 875 608 926 623 911 517 926 405 |
9 973 106 | ||||||||||||
2013
721 885 827 548 462 974 -7 203 404 866 620 070 928 048 916 126 777 536 940 124 901 938 947 510 |
8 441 422 | ||||||||||||
2014
949 623 825 826 906 476 911 860 875 284 898 595 925 829 917 719 873 851 699 994 728 750 941 464 |
10 455 271 | ||||||||||||
2015
933 301 789 395 200 060 133 474 943 412 902 981 934 710 936 036 892 341 948 465 922 161 946 509 |
9 482 845 | ||||||||||||
2016
709 583 622 146 946 537 914 375 943 605 814 486 915 017 902 059 850 547 935 958 922 911 946 026 |
10 423 250 | ||||||||||||
2017
889 629 730 056 81 611 799 786 854 715 900 496 922 662 924 360 901 953 938 167 921 095 947 846 |
9 812 376 | ||||||||||||
2018
952 931
849 443
951 635
919 725
934 198
890 632
906 864
904 012
882 733
931 505
914 087
896 971
|
10 934 736 | ||||||||||||
2019
809 277
556 333
177 752
670 859
941 856
841 553
780 669
747 528
859 887
939 869
923 556
923 963
|
9 173 102 | ||||||||||||
2020
928 860
893 210
932 277
917 959
941 610
891 452
889 355
909 725
892 399
936 477
914 074
943 564
|
10 990 962 | ||||||||||||
2021
892 962
731 469
134 313
643 595
940 469
886 554
917 399
891 878
897 857
935 011
919 089
913 272
|
9 703 868 | ||||||||||||
2022
902 658
845 250
920 347
883 206
914 023
866 926
883 939
848 346
822 350
887 197
635 367
924 845
|
10 334 454 | ||||||||||||
2023
406 723
365 497
-6 309
288 698
938 798
899 050
912 742
718 651
886 140
939 753
920 669
950 500
|
7 220 712 | ||||||||||||
2024
937 405
890 427
940 755
910 393
609 327
869 592
896 591
899 839
887 950
932 956
908 315
895 313
|
10 578 863 | ||||||||||||
2025
912 043
755 369
113 480
245 636
|
Surrounding population
The Nuclear Regulatory Commission identifies two key emergency planning zones around nuclear facilities: a 10-mile radius focused on potential airborne radioactive exposure, and a broader 50-mile area addressing risks related to contaminated food and drink consumption.
As of 2010, the number of residents living within 10 miles of Perry stood at 83,410, reflecting an 8% increase compared to 2000. In the wider 50-mile zone, the population totaled 2,281,531, marking a 3% decline since 2000. Notable urban centers within this distance include Cleveland, situated approximately 36 miles from the plant. Populations from Canada are excluded from these figures.
Seismic risk
According to a 2010 assessment by the NRC, the likelihood of an earthquake causing core damage at Perry is estimated at one in 47,619 annually.
Security threats
On April 7, 2021, the FBI’s Cleveland Field Office responded to a security incident at Perry that necessitated deployment of a bomb squad. A man from Michigan reported a bomb in a trailer he had brought to the site; however, no explosive device was discovered and he was subsequently taken into custody.