Salem Nuclear Power Plant
| Company type | Joint venture |
|---|---|
| Industry | Nuclear power generation |
| Founded | 1968 |
| Headquarters | Lower Alloways Creek Township , United States |
Area served | United States |
| Owner | PSEG (57%), Constellation Energy (43%) |
Salem Nuclear Power Plant
The Salem Nuclear Power Plant consists of two pressurized water reactor units situated in Lower Alloways Creek Township, New Jersey, within Salem County, United States. Ownership is shared between PSEG (57%) and Constellation Energy (43%), with PSEG responsible for the plant's operation.
In 2019, New Jersey implemented Zero-Emission Certificates valued at $300 million annually to support nuclear facilities such as Salem. This financial assistance concluded in 2024, effective June 1, 2025, as the Inflation Reduction Act introduced alternative tax incentives promoting clean energy development.
Location
Positioned approximately 18 miles south of Wilmington, Delaware, the Salem Nuclear Generating Station occupies an artificial island in Delaware Bay alongside the Hope Creek Nuclear Generating Station. Together, these sites represent the fourth largest nuclear power generation complex in the United States.
Salem operates two Westinghouse-manufactured pressurized water reactors (PWRs). Construction commenced in 1968, with Unit 1 beginning commercial service in 1977 and Unit 2 following in 1981. The entire facility covers roughly 740 acres.
Reactors
The two PWR units supplied by Westinghouse have a total electrical output capacity of 2,275 MWe. In 2009, PSEG submitted applications for license extensions of twenty years for both reactors, which were granted by the Nuclear Regulatory Commission (NRC) in 2011. Unit 1’s license extends through August 13, 2036, while Unit 2’s license is valid until April 18, 2040.
Surrounding population
The Nuclear Regulatory Commission designates two emergency planning zones: a ten-mile radius plume exposure zone addressing airborne radioactive hazards and a fifty-mile ingestion pathway zone concerning consumption of contaminated food or liquids.
According to 2010 data, the population residing within ten miles of Salem totaled 52,091—a growth of 54.1% over ten years. Within fifty miles, the population reached 5,482,329, marking a 7.6% increase since 2000.
Significant urban centers within fifty miles include:
- New Jersey: Camden (39mi), Vineland (27mi)
- Delaware: Dover (21mi), Wilmington (19mi)
- Pennsylvania: Philadelphia (43mi)
Safety issues
During the 1990s, Salem’s reactors experienced a two-year shutdown due to maintenance deficiencies. Expert evaluations uncovered issues such as a leaking generator, unreliable reactor control systems, and a workplace environment that discouraged reporting problems. Consequently, the Nuclear Regulatory Commission intensified regulatory oversight over Salem in 2004.
Subsequent NRC investigations and independent assessments identified minor concerns including insufficient routine maintenance and diminished employee morale but affirmed that safety standards were maintained.
On August 22, 2013, Salem was briefly taken offline following a leak of mildly radioactive water contained entirely within the plant’s containment structure without posing public danger. Normal operations resumed within two days.
In May 2014, broken bolts from a cooling pump were discovered inside the reactor vessel of Salem Unit 2 during refueling activities. Westinghouse conducted inspections uncovering additional loose bolts. Unit 2 returned to service on July 11, 2014.
Cooling process and aquatic life impact
The Salem Nuclear Generating Station extracts several billion gallons of water each day from the Delaware River to serve its cooling needs, discharging the water back at higher temperatures. This practice has drawn criticism from environmental organizations such as the Delaware Riverkeeper Network, headed by Maya van Rossum, due to its association with significant fish fatalities—estimated at approximately 3 billion adult fish annually, in addition to eggs and larvae. Van Rossum asserts that the facility is responsible for eliminating nearly 48% of the striped bass population in the Delaware River every year.
Additionally, populations of bay anchovy have experienced a decline. Van Rossum has labeled the plant as the “largest predator in the Delaware estuary.” These ecological consequences have resulted in extended legal confrontations between advocacy groups and regulatory authorities.
Disputes over water discharge permits
In October 2013, a lawsuit was filed by the Delaware Riverkeeper Network, New Jersey Sierra Club, and Clean Water Action against the New Jersey Department of Environmental Protection (NJDEP), citing delays in renewing Salem plant’s water discharge permit. The legal challenge focused on NJDEP’s failure to act on PSE&G’s 2006 New Jersey Pollution Discharge Elimination System (NJPDES) permit application and questioned whether implementing cooling towers was necessary to mitigate fish mortality.
By November 2014, a settlement was reached where NJDEP committed to releasing a draft discharge permit by June 30, 2015. This permit did not impose a requirement for cooling towers on Salem Units 1 and 2, thereby avoiding an estimated expenditure of $1 billion.
Power generation
| Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Annual Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2001 | 1,628,101 | 1,476,038 | 1,636,734 | 898,461 | 956,394 | 1,555,773 | 1,635,714 | 1,640,717 | 1,340,729 | 1,216,108 | 1,572,067 | 1,648,210 | 17,205,046 |
| 2002 | 1,488,857 | 1,488,857 | 1,379,434 | 892,102 | 1,179,097 | 1,593,794 | 1,645,258 | 1,640,861 | 1,580,364 | 1,058,506 | 1,384,535 | 1,667,409 | 16,999,074 |
| 2003 | |||||||||||||
| 1,491,748 | 1,499,538 | 1,544,442 | 1,645,766 | 1,602,610 | 1,578,978 | 1,562,350 | 1,167,010 | 958,594 | 810,053 | 1,653,057 | 15,514,146 | ||
| 2004 | 1,646,987 | 1,571,693 | 1,621,231 | 781 ,182 | 520 ,553 | 1 ,398 ,370 | 1 ,446 ,170 | 1 ,708 ,616 | 1 ,349 ,519 | 1 ,713 ,702 | 1 ,658 ,472 | 780 ,544 | 16 ,197 ,039 |
| 2005 | 1 ,735 ,382 | 1 ,573 ,110 | 1 ,741 ,799 | 875 ,865 | 1 ,387 ,424 | 1 ,648 ,504 | 1 ,704 ,117 | 1 ,676 ,623 | 1 ,632 ,572 | 1 ,144 ,062 | 1 ,495 ,383 | 1 ,729 ,597 | 18 ,344 ,438 |
| 2006 | 1 ,740 ,543 | 1 ,555 ,055 | 1 ,638 ,043 | 1 ,672 ,530 | 1 ,716 ,863 | 1 ,650 ,329 | 1 ,677 ,674 | 1 ,664 ,945 | 1 ,566 ,550 | 1 ,086 ,234 | 1 ,638 ,970 | 1 ,741 ,231 | 19 ,348 ,967 |
| 2007 | 1 ,742 ,364 | 1 ,572 ,703 | 1 ,569 ,646 | 936 155 | 1392 982 | 1593 517 | 1698 054 | 1647 440 | 1639 591 | 1718 133 | 1686 017 | 1631 592 | 18 828 194 |
| 2008 | 1712 247 | 1622 282 | 1096 556 | 841 672 | 1298 550 | 1662 476 | 1700 993 | 1717 567 | 1632 594 | 1221 757 | 1273 312 | 1758 719 | 17 538 725 |
| 2009 | 1773 789 | 1595 891 | 1682 961 | 1702 558 | 1734 739 | 1673 693 | 1726 023 | 1716 463 |
Water usageSalem Units 1 and 2 rely on water sourced from Delaware Bay for their cooling processes. This water is extracted via an intake structure equipped with rotating screens designed to filter out debris, which is subsequently cleared away. Occasionally, significant accumulations of grass can obstruct the intake system, resulting in the reactors operating at diminished power levels for prolonged durations. Around 2 gigawatts of waste heat generated from the steam cycle are released into the bay, with regulatory limits ensuring that temperature rises do not exceed 1 °C during summer months and 2 °C in other seasons. The large on-site closed-cycle cooling tower supports the neighboring Hope Creek facility and is not utilized by the Salem reactors. See alsoExternal links |
- Buildings and structures in Salem County, New Jersey
- Energy infrastructure completed in 1977
- Energy infrastructure completed in 1981
- Lower Alloways Creek Township, New Jersey
- Nuclear power plants in New Jersey
- Nuclear power stations using pressurized water reactors
- Towers completed in 1977
- Towers in New Jersey
- Exelon
- Public Service Enterprise Group
- 1977 establishments in New Jersey