Sheffield, Ashton-under-Lyne and Manchester Railway
| Company type | Public company |
|---|---|
| Industry | Railway transport |
| Founded | 1837 |
| Defunct | 1847 |
| Fate | Merged into Manchester, Sheffield and Lincolnshire Railway |
| Headquarters | Sheffield , United Kingdom |
| Products | Rail transport services |
The Sheffield, Ashton-under-Lyne and Manchester Railway was among the pioneering British railway enterprises, inaugurated between 1841 and 1845 to link Sheffield with Manchester through Ashton-under-Lyne. The demanding geography of the Peak District necessitated constructing the extensive Woodhead Tunnel, which spans over . In 1847, this company amalgamated with the Sheffield and Lincolnshire Junction Railway and the Great Grimsby and Sheffield Junction Railway, creating the Manchester, Sheffield and Lincolnshire Railway.
During the 20th century, the route became a key corridor for heavy freight and underwent electrification in 1954, coinciding with the building of a new Woodhead Tunnel. Passenger operations mostly ended in 1974 except for the Manchester–Hadfield segment, which remains active alongside the Manchester–Hadfield–Glossop line and a branch leading to Stalybridge.
Origins
By the late 1700s, there was an increasing need for enhanced transportation between Manchester and Sheffield, separated by the challenging Peak District terrain. The existing canal systems were indirect and inefficient.
In 1826, Henry Sanderson, a surveyor from Sheffield, proposed a railway route passing through Edale, with George Stephenson appointed as engineer in 1830. Due to concerns about steep gradients that would require rope-worked inclines, Stephenson recommended an alternate path via Penistone, but this plan also failed to attract sufficient backing.
In 1835, Charles Vignoles surveyed a different alignment through Woodhead and Penistone, leading to the establishment of a provisional company named "Sheffield, Ashton-under-Lyne and Manchester Railway." This alignment permitted locomotive adhesion operation featuring a tunnel. Both Vignoles and Joseph Locke independently surveyed the route and concurred on constructing a longer tunnel at a lower elevation to minimize gradients.
Following parliamentary costs of £18,000, the railway secured its authorisation on 5 May 1837 (Sheffield, Ashton-under-Lyne and Manchester Railway Act 1837). Opposition was limited to the Manchester and Birmingham Railway, resulting in an agreement to share access into Manchester at Store Street station.
Construction and first opening
The initial ground-breaking occurred near the western portal of the Woodhead Tunnel on 1 October 1838. By 1839, surveying was complete, land acquisitions were underway, and construction had started under contractor Thomas Brassey. However, financial difficulties arose due to shareholder defaults and cost overruns. To reduce expenses, the Woodhead Tunnel was designed as a single-track bore. Disagreements between the board and engineer Vignoles led to his departure; Joseph Locke agreed to act as consulting engineer provided resident engineers were appointed for daily oversight.
In 1841, Locke estimated tunnel construction costs at £207,000—approximately double initial projections. Significant water ingress demanded more powerful pumping equipment. By late 1841, the line had reached Godley Toll Bar, from its origin. On 11 November 1841, directors undertook a trial journey. The Board of Trade inspector Sir Frederick Smith gave approval for public operation, which commenced on 17 November 1841 without formal ceremony; shareholders were granted complimentary tickets. Until Store Street terminal was completed, trains used the temporary Travis Street station operated by the Manchester and Birmingham Railway. Initially single-track throughout, the line shared its final approach from to Travis Street with M&BR trains running on M&BR tracks. Nearly 40% of gross passenger revenue was paid to M&BR for use of this shared section. Freight traffic developed more gradually.
Safety provisions at the junction were minimal; Manchester Guardian commented:
Care must be exercised here to avoid collisions between two trains approaching this point simultaneously. This can be managed by scheduling or installing separate rails upon completion of the new Manchester station; currently, a watchman should oversee both lines to signal trains accordingly.
Maintenance of permanent way infrastructure was contracted out.
Completion of the route and a dissolved partnership
On 10 May 1842, the M&BR and SA&MR inaugurated the jointly managed Store Street station in Manchester. The original single-track line quickly proved inadequate, leading to orders in early 1842 to install a double track and extend the line from Godley to Glossop. The segment between Godley and became operational on 10 December 1842, followed by the opening of "Glossop" station (later renamed ) on 24 December 1842. Glossop was served by six daily trains, supplemented by four trains to Newton & Hyde, along with four Sunday services to Glossop. By November 1842, the route included stops at Manchester (Store Street), Ardwick, Gorton, Fairfield, Ashton, Dukinfield, Newton & Hyde, Broadbottom, and Glossop. The Dukinfield (Dog Lane) station ceased operations in 1845; a nearby Dog Lane station opened in 1846 but was closed again in 1847. Additionally, another Dukinfield station existed on the Stalybridge branch.
By 1844, the main line had extended to Woodhead, with stations established at Hadfield and Woodhead. Construction of the Woodhead Tunnel commenced soon after, facilitated by enhanced pumping equipment.
Company directors actively sought partnerships and expansion opportunities, promoting the proposed Sheffield and Lincolnshire Junction Railway connecting Sheffield to Gainsborough. In 1844, negotiations with the Manchester and Birmingham Railway progressed, culminating in a proposal for M&BR and the Midland Railway to lease SA&MR to improve access into Manchester. Although this arrangement received parliamentary approval, shareholders declined it in May 1845 due to concerns over losing autonomy.
A branch line from Ashton to was under development when a viaduct collapse on 19 April 1845 resulted in the deaths of 17 workers.
On 9 June 1845, a short single-track branch to was opened; parliamentary authorization granted in 1846 permitted acquisition from the Duke of Norfolk. This branch connected with the main line east of the original Glossop (now Dinting) station.
The isolated eastern section of the main line began operating on 14 July 1845, featuring stations at Dunford Bridge, Penistone, Wortley, Deepcar, Oughty Bridge, Wadsley Bridge, and Sheffield's Bridgehouses.
Woodhead Tunnel—then the longest tunnel in Britain at —was completed on 22 December 1845; a ceremonial opening took place that day, with public services commencing immediately afterward. Two additional stations were introduced at former coal sidings located at and .
In addition to Woodhead Tunnel, other tunnels included Audenshaw Road, two at Hattersley, , and Bridgehouses. Key bridges featured the Etherow Viaduct and Dinting Viaduct, which incorporated five central arches flanked by eleven approach arches.
The finalized network encompassed of main line track, on the Stalybridge branch, and along the Glossop branch.[1]
1845: Period of Growth
During 1844–45, the financial market experienced a notable upswing, which contributed to the surge known as the Railway Mania. The directors of the SA&MR actively sought to broaden their network, and on 15 April 1845, shareholders gave their consent to bills authorizing the Manchester South Junction and Altrincham Railway, connecting to the Liverpool and Manchester Railway, as well as the Barnsley Junction Railway extending from near Penistone to Barnsley, linking with the North Midland Railway at Royston. Approval had already been granted for the Sheffield and Lincolnshire Junction Railway, running between Sheffield and Gainsborough. Other proposed routes included a line from Wortley passing through Thorncliffe to Chapeltown, and another from Dukinfield to New Mills, which would join the Buxton branch of the Manchester and Birmingham Railway. There was also potential for the Barnsley Junction Railway to extend towards Pontefract, alongside preliminary discussions regarding a railway linking Boston, Newark, and Sheffield, as well as a connection between Hull and Barnsley. However, not all of these initiatives received official sanction.
A significant conference convened on 5 September 1845 among representatives of SA&MR, promoters of the Sheffield and Lincolnshire Junction Railway, and members of the Great Grimsby and Sheffield Junction Railway, including the Grimsby Docks Company. This meeting culminated in an agreement to merge their efforts into one railway stretching from Manchester to the North Sea port of Grimsby. Parliament granted approval on 27 July 1846, with effect from 1 January 1847, thereby establishing the Manchester, Sheffield and Lincolnshire Railway.
Integration into the Manchester, Sheffield and Lincolnshire Railway
Beginning on 1 January 1847, a connecting route between Bridgehouses station and the Sheffield station operated by the Midland Railway was inaugurated. Originally serving as the terminus for the Sheffield and Rotherham Railway, this station was renamed Sheffield Wicker station in 1852. The line itself was short but steeply inclined, predominantly running through a tunnel known as the Fiery Jack, primarily utilized for transferring wagons.
To accommodate through passenger traffic more efficiently, a new central Sheffield station was constructed and opened on 15 September 1851 under the name Victoria station.
Starting in 1857, an express passenger service connecting Manchester and London commenced operation in collaboration with the Great Northern Railway. This service completed its journey in five hours and twenty minutes—matching the times offered by competitors such as the London and North Western Railway (the successor to the Manchester & Birmingham Railway). Nevertheless, LNWR soon managed to accelerate its schedules beyond what MS&LR and GNR could offer. This competition involved aggressive tactics by LNWR aimed at discouraging passengers from using rival services.
Woodhead Tunnel
The most notable engineering achievement on the original route was Woodhead Tunnel, which measured , making it at that time the longest tunnel in Britain and remaining the longest on the LNER network as of 1947. Although initially designed to accommodate two tracks, only a single bore was excavated to minimize expenses. The track ascended eastward at a gradient of 1 in 201.
The construction process demanded 157 tons of gunpowder for blasting operations and involved pumping out eight million tons of water. Excavation totaled , half of which was removed via vertical shafts. The overall cost was approximately £200,000. The tunnel, along with the entire Manchester-Sheffield line, officially commenced operations on 22 December 1845.
To enhance safety within this confined space, every train passing through was led by an SA&MR pilot engine equipped with an argand lamp and a reflective disc designed to illuminate the track ahead. Furthermore, Cooke & Wheatstone's magnetic telegraph system was installed to facilitate communication between stations inside the tunnel.
The single-track bore quickly became a limiting factor; following formation of the Manchester, Sheffield and Lincolnshire Railway (MS&LR), work began in 1847 on excavating a second bore dedicated to traffic heading towards Manchester. This additional tunnel opened for use on 2 February 1852.
Following the Manchester, Sheffield and Lincolnshire
On 1 August 1897, the MS&LR officially adopted the name Great Central Railway.
With the 1923 railway grouping, the Great Central Railway was integrated into the London and North Eastern Railway (LNER).
In 1936, LNER sanctioned the electrification of the entire Manchester-Sheffield-Darnall route along with its branches, covering a total of , employing a 1,500 V DC overhead system designed for both passenger and freight services. The Woodhead Tunnel experienced approximately 80 daily trains, predominantly coal freight accounting for 90%, which caused ventilation constraints and limited throughput. The primary objective of electrification was to enhance line capacity; however, progress was interrupted by World War II. Between 1946 and 1947, each tunnel bore was closed for nine months to undergo repairs. Following nationalisation in 1948, a new double-track tunnel with sufficient clearance for overhead wiring was constructed and inaugurated on 3 June 1954. The original tunnels were sealed off and later utilized by the Central Electricity Generating Board to transmit power cables beneath the Pennines.
Passenger operations between Manchester Piccadilly and Sheffield Victoria via Woodhead terminated on 5 January 1970, though electric commuter services from Manchester to Glossop and Hadfield persisted. Freight traffic ceased on 18 July 1981, resulting in closure of the section from Hadfield to Penistone. The segment between Penistone and Sheffield remained active for diesel trains running Sheffield–Huddersfield but necessitated reversing maneuvers at Nunnery Junction due to station closures. On 13 May 1983, train services were rerouted through Barnsley on the former Midland Railway line; track between Penistone and Deepcar was dismantled, while the stretch from Deepcar to Nunnery Junction remains as a single line serving Fox steelworks.
On 10 December 1984, electric trains operating between Manchester, Glossop, and Hadfield transitioned from a 1,500 V DC system to the more widely adopted 25 kV AC standard used on connecting routes such as the West Coast Main Line—a system still operational today. The Stalybridge branch continues to accommodate both local and express services linking Manchester Piccadilly with Huddersfield or Leeds.
Main line
- Manchester Store Street (also known as "Bank Top"); commenced operations with the Manchester and Birmingham Railway on 10 May 1842; renamed Manchester London Road in 1844; designated Template:Rws on 12 September 1960; currently operational;
- Travis Street; temporary terminus opened by M&BR on 4 June 1840; served by SA&MR trains starting 17 November 1841; closed on 10 May 1842;
- Template:Rws; inaugurated on 20 November 1842; remains open;
- Template:Rws; opened July 1855; still in use;
- Template:Rws; began service on 23 May 1842; currently active;
- Fairfield; opened on 17 November 1841; relocated eastward on 2 May 1892; operational today;
- Ashton & Hooley Hill; opened on 17 November 1841; renamed Template:Rws in 1845; still open;
- Dukinfield (Dog Lane); started service on 17 November 1841; closed on 23 December 1845; nearby reopening occurred on 1 May 1846; closed again on 1 November 1847;
- (Template:Rws; opened on 13 May 1985; currently open;)
- Newton; commenced operations on 17 November 1841; known as Template:Rws from 1848; still functioning;
- ; opened as a temporary terminus on 17 November 1841; closed by 11 December 1842;
- (Template:Rws; opened on 7 July 1986; remains open;)
- Godley Junction; opened on 1 February 1866; renamed Godley on 6 May 1974; renamed again on 7 July 1986; ceased operations after last train ran on 27 May 1995;
- (Template:Rws; opened in 1978; still active;)
- Broadbottom; inaugurated on 11 December 1842; underwent several name changes including Mottram (1845), Mottram & Broadbottom (1 July 1884), Broadbottom for Charlesworth (January 1954), before reverting to Template:Rws in 1955; currently in service;
- Glossop; opened Christmas Day, 1842; renamed Dinting on June 9, 1845; closed February 1, 1847;
- Glossop Junction; began service June 9, 1845; renamed Dinting February 1847, Glossop & Dinting July 10, 1922, then Template:Rws September 26, 1938; still open;
- Hadfield; opened August 8, 1844; experienced multiple renamings such as Hadfield & Tintwistle and Hadfield for Hollingworth before adopting Template:Rws in 1955;
- ; opened July 1, 1861; closed February 4, 1957;
- ; started August 8, 1844; closed July 27, 1964;
- ; commenced July 14, 1845; ceased January 5, 1970;
- ; opened May 1, 1846; shut November 1, 1847; reopened January 1849; closed March 6, 1950;
- Template:Rws; began service July 14, 1845; relocated at junction with L&YR February 1, 1874; remains operational;
- ; opened December 5, 1845; closed November 1, 1847;
- ; probably opened shortly after December 5, 1845; closed November 1, 1847;
- ; started July 14, 1845; shut down May 2, 1955;
- ; opened July 14, 1845; closed June 15, 1959;
- Oughtibridge or ; began July 14, 1845; ceased June 15, 1959;
- ; inaugurated July 14, 1845; closed June 15, 1959;
- ; started July 1, 1888; shut October 28, 1940;
- Sheffield (); began July 14, 1845; closed September 15, 1851 upon opening of by amalgamated MS&LR.
Stalybridge branch
- Template:Rws (refer to above);
- Dukinfield; inaugurated on 23 December 1845; relocated southwest in March 1863; renamed in 1954; ceased operations on 4 May 1959;
- Park Parade or ; commenced service on 23 December 1845; closed on 5 November 1956;
- Template:Rws; opened on 23 December 1845; connected with LNWR from 1848; currently active.
Glossop branch
- Template:Rws (see above);
- Template:Rws; began operations on 1 July 1845; renamed Glossop Central on 10 July 1922; name reverted to Glossop on 6 May 1974; still in service.
Chairman
- James Stuart-Wortley, 1st Baron Wharncliffe served from 1837 to 1840
- John Parker MP held the position from 1840 to 1846
- John Chapman appointed in 1846
Deputy Chairman
- William Sidebottom from 1837 until 1843
- John Chapman served between 1843 and 1846 before becoming Chairman
Secretary
- Thomas Asline Ward from 1837 to 1838
- Charles Thompson from 1838 to 1841
- John Platford held the role between 1841 and 1845
- James Meadows appointed in 1846
Engineer-in-Chief
- Charles Blacker Vignoles from 1838 to 1839
- Joseph Locke served between 1840 and 1846
- Alfred Stanistreet Lee appointed in 1846
Resident Engineer
- Alfred Stanistreet Lee from 1840 to 1846
- John Bass took over in 1846
References
- ↑ Dow, First Railway, page 20
- Articles with short description
- Early British railway companies
- Defunct companies based in Sheffield
- Railway lines in Yorkshire and the Humber
- Railway companies established in 1837
- Railway lines opened in 1841
- Railway companies disestablished in 1846
- Manchester, Sheffield and Lincolnshire Railway
- Woodhead Line
- British companies established in 1837
- British companies disestablished in 1846