Jump to content

Sierra SunTower

From Alfawiki
Adapted from the English Wikipedia article Sierra SunTower, available under CC BY-SA 4.0Updated 28 November 2025
Sierra SunTower
Company typeCommercial solar power facility
IndustryRenewable energy, Solar power
Founded2009
Headquarters
Lancaster
,
United States
Area served
California, United States
ProductsConcentrating solar power (CSP) electricity generation
Number of employees
21 (during operation)
ParenteSolar

Sierra SunTower was a 5 MW commercial concentrating solar power (CSP) facility constructed and managed by eSolar in Lancaster, California. By mid-September 2022, its pair of central towers had been dismantled, although several other components of the plant remained intact.

Overview

The Sierra SunTower project aimed to demonstrate eSolar's CSP technology at a full operational scale, reducing risks associated with scaling up and acting as a prototype for subsequent developments.

This plant employed power tower CSP technology, utilizing a field of heliostats that concentrated sunlight onto thermal receivers mounted atop towers. The intense solar energy heated water to generate steam, which then drove a turbine generator to produce electricity. Afterward, the steam was condensed and recycled back into the system.

History

eSolar introduced the 5 MW Sierra SunTower in Lancaster in 2009 to showcase its CSP technology. By spring 2010, it was the sole commercial CSP tower operating in North America, connected to the Southern California Edison grid.

At the project's inauguration, California Governor Arnold Schwarzenegger emphasized its significance in promoting affordable, carbon-free energy solutions.

The facility operated exclusively during periods of clear sunlight. By 2015, California hosted two solar power tower projects: the 392 MW Ivanpah Solar Electric Generating System alongside eSolar's Sierra SunTower. Combined, they produced 397 MW in 2014.

Shutdown

The Sierra SunTower halted commercial operations in 2015 due to elevated operational expenses, which limited its viability to only the brightest days.

Location

Situated on roughly 8 hectares within an arid valley of the southwestern Mojave Desert, the project occupied privately owned farmland.

Equipment

The plant consisted of two modules encompassing 24,000 heliostats arranged across four sub-fields that directed sunlight onto two tower-mounted receivers. The captured heat transformed feedwater into superheated steam, which powered a refurbished 1947 GE turbine generator for electricity production. Subsequently, steam was condensed and reused. Construction generated over 300 temporary jobs and maintained a workforce of 21 permanent employees during operation.

Output

Recognized by the California Energy Commission as a renewable energy facility, Sierra SunTower sold electricity through a Power Purchase Agreement with Southern California Edison. Its 5 MW capacity supplied power sufficient for approximately 4,000 homes and prevented about 7,000 tons of CO2 emissions annually—comparable to planting 5,265 acres of forest or removing 1,368 vehicles from circulation.

Awards

In December 2009, Power Engineering magazine honored Sierra SunTower as “Best Renewable Project,” acknowledging it as an innovative power generation effort. In February 2010, Renewable Energy World granted it “Renewable Project of the Year” for pioneering advancements in commercial solar thermal technology.

Performance data

The US Treasury Department Performance Report indicated that from August 1, 2010, through July 31, 2011, the eSolar Sierra SunTower produced 539 MWh of electricity. This output accounted for roughly 12.6% of the originally projected 4,270 MWh.

Production

Electricity Output (MW·h) of Sierra SunTower Solar Generation Facility
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual Total
2010 1 13 31 47 66 75 73 65 53 24 20 8 476
2011 0 12 17 27 34 43 37 38 26 21 7 7 270
2012 2 23 57 82 113 122 105 83 78 61 31 23 780
2013 0 0 0 0 0 0 0 0 0 0 0 94 94
Cumulative Total 1,620

See also

External links