Jump to content

Stoughton station

From Alfawiki
Stoughton station
Company typeMBTA Commuter Rail terminal station
IndustryPublic transportation
FoundedApril 7, 1845
Headquarters
Stoughton, Massachusetts
,
United States
ProductsCommuter rail service

Stoughton station serves as a terminal for the MBTA Commuter Rail located in the heart of downtown Stoughton, Massachusetts, operating on the Stoughton Branch of the Providence/Stoughton Line. It consists of a single platform divided by Wyman Street, which includes a mini-high section to ensure accessibility. The station is notable for its granite building designed in the distinctive Richardson Romanesque style by architect Charles Brigham, featuring a prominent clock tower.

The Stoughton Branch Railroad commenced operations on April 7, 1845, linking Canton on the Boston and Providence Railroad (B&P) mainline to Stoughton. Following early destruction of stations due to fire and wind, Stoughton functioned as the branch’s terminus until 1855 and later resumed this role for passenger trains between 1866 and roughly 1890. The existing station structure, originally called Stoughton Central until 1896, was erected during 1887–1888. In 1888, the B&P came under lease by the Old Colony Railroad, which itself was leased by the New York, New Haven and Hartford Railroad in 1893. Service patterns fluctuated under New Haven's control until 1958 when Stoughton was established as the permanent terminal.

In 1973, the Massachusetts Bay Transportation Authority acquired the Stoughton Branch along with other lines. The station building was recognized by its inclusion on the National Register of Historic Places in 1974 and underwent significant restoration between 1977 and 1988, including the addition of a mini-high platform for accessibility. After closing in 2009, the town acquired ownership of the building ten years later and initiated restoration efforts. The planned but currently unfunded Phase 2 of the South Coast Rail project proposes extending service beyond Stoughton to reach Fall River and New Bedford. This proposal, which faces local opposition, would relocate the station further south, incorporating full-length accessible platforms and an additional track.

Station design

Located roughly west of Washington Street (Route 138), Stoughton station sits on a wide curve where the single track of the Stoughton Branch runs northwest to southeast.[1] The low-level side platform is positioned on the northeast side between grade crossings at Porter Street and Wyman Street. Southeast of Wyman Street lies an accessible mini-high platform segment. At the southern extremity of the platform, the lone track divides into two tracks designed for train layover purposes.[2] Parking facilities are provided on both sides adjacent to the tracks.[1]

The Romanesque Revival station building stands just north of Wyman Street crossing,[3] extending along Wyman Street.[4] It is constructed from granite ashlar blocks quarried locally at Myron Gilbert Quarry in Stoughton,[4][5] and features a square tower approximately tall at its eastern corner that houses four clock faces made by E. Howard & Co.[4][3] A porte-cochere is situated at its northeast end.[5][3]

At the southwest end—originally designated as the women's waiting room—is a projecting twelve-sided (dodecagonal) structure; conversely, the men's waiting room was located at the northeast end.[5][6] Each waiting area contained its own fireplace and chimney.[5] The women’s room is distinguished by wood trim that arches up to meet the ceiling,[4] while copper coping finishes off the slate roof.[4] The entrance on Wyman Street is marked by a half-timbered portico, complemented by a wooden canopy that extends over part of the platform.[5]

Old Colony and New Haven

The Stoughton Branch Railroad commenced operations from Canton on the Boston and Providence Railroad (B&P) mainline to Stoughton on April 7, 1845. The initial wooden depot was destroyed by fire in June of the same year; its successor was blown down by wind during construction in October 1845. The third iteration, completed in 1846, was constructed from brick and featured an engine house along with a freight house.

On May 16, 1855, the Stoughton Branch was extended southward to North Easton through the Easton Branch Railroad. In 1866, the Dighton and Somerset Railroad opened a line between Somerset Junction and Braintree Highlands, utilizing the Easton Branch track segment between North Easton and Stoughton Junction. Passenger service between Stoughton and Stoughton Junction was subsequently discontinued.

The third station was replaced with a granite building designed by architect Charles Brigham, marking his first solo project. Construction began in May 1887, and the new station opened its doors in March 1888. The Old Colony Railroad acquired the B&P in 1888, thereby consolidating railroads across southeastern Massachusetts under a single ownership. Some services to South Coast cities such as Fall River and New Bedford were routed through Stoughton. In 1893, the Old Colony became leased by the New York, New Haven and Hartford Railroad. To differentiate it from another local station, it was renamed Stoughton Central in 1888 but reverted back to Stoughton in 1896.

By 1915, the station featured two through tracks alongside two stub-end tracks, with a freight house situated across the rails and a nearby four-stall engine house equipped with a turntable. During and following World War I, the New Haven resumed South Coast train services via Stoughton. After approximately 1924, all Dighton and Somerset line trains were routed through Stoughton.

On August 4, 1924, a Boston-bound express derailed near the station after spikes were deliberately placed on the rails by two children attempting to cause an accident. By 1927, nearly all trains traveling to New Bedford and Fall River passed through Stoughton.

In 1937, early in the period known as the 88 stations case, South Coast service was redirected through Mansfield, leaving primarily shuttle trains operating on the Stoughton branch. Some South Coast trains resumed using Stoughton in 1950 and continued beyond 1955. However, this service ceased on September 5, 1958, when the New Haven discontinued unprofitable routes on the Old Colony Division. Despite this, service on the Stoughton Branch persisted due to its connection with the B&P line, which remained separate from Old Colony control under New Haven.

MBTA era

The Massachusetts Bay Transportation Authority began subsidizing select commuter rail services in 1965; however, Stoughton Branch operations initially lacked subsidies because of federal limitations. Following the New Haven’s merger into Penn Central in 1968, the MBTA acquired most of Penn Central’s Boston-area commuter lines—including both the Stoughton Branch and former Dighton and Somerset line to Taunton—on January 27, 1973, although Penn Central continued running them. After Penn Central became part of Conrail in 1976, MBTA subsidies for Stoughton service commenced on September 28 of that year and eventually integrated it into what is now known as the Providence/Stoughton Line.

On March 12, 1977, control of southside commuter rail operations—including the Providence/Stoughton Line—transferred to the Boston and Maine Railroad, initiating a series of contract operators over time. Beginning March 31, 1977, financial support for service came partially from the town of Stoughton; this responsibility later shifted to the Brockton Area Transit Authority (BAT). Sunday train service was introduced briefly in 1992 but discontinued early in 1993.

As of 1967, Stoughton station remained unique as the sole terminal station featuring a clock tower within its vicinity. Threats of redevelopment during the late 1960s and early ’70s led to its inclusion on the National Register of Historic Places on January 21, 1974 under the name Stoughton Railroad Station. That same year, town officials created a committee dedicated to restoring the facility. Restoration efforts began in 1975 but paused until an agreement with MBTA was finalized in 1977. Work resumed that July and continued into the late ’80s at a total cost exceeding $1 million. A coffee shop opened within the station in 1981. In 1988, collaboration between MBTA and BAT resulted in installation of an accessible mini-high platform along with an expansion adding approximately one hundred parking spaces. Nevertheless, maintenance declined afterward causing gradual deterioration.

Passenger access to the station building ended on May 1, 2009 when ticket sales were terminated. In 2010, town leaders initiated negotiations with MBTA regarding leasing and rehabilitation of the structure. Although MBTA placed it on sale for $350,000 in May 2012, local opposition led to withdrawal from sale efforts. In November 2015, voters approved $250,000 for acquisition plus $350,000 earmarked for exterior restoration work. The state legislature capped sale price at $175,000 in 2017. A $75,000 state grant supporting further restoration was announced in December 2018. Ultimately, ownership transferred to the town mid-2019 for $175,000.

The station served as a filming site for Little Women (2019), where it portrayed Concord station.

South Coast Rail

Efforts to establish South Coast Rail service connecting Fall River and New Bedford date back to the 1980s. By 1988, the MBTA had tentatively considered extending service to Taunton through Stoughton. A study conducted in 1990 identified the Stoughton corridor as the most practical option for South Coast Rail. Subsequent analysis in 1995 found both Stoughton and Attleboro routes viable, but recommended a shorter extension of the Stoughton Branch reaching North Easton. Although the MBTA briefly explored the Attleboro alignment, a 1997 study reaffirmed the preference for the Stoughton route. Planning efforts persisted until being halted in 2003.

Work on the project resumed in 2005. A 2009 alternatives review once again endorsed the Stoughton alignment, suggesting installation of a second track at Stoughton station to accommodate increased two-way service. The design included two new platforms positioned entirely south of Wyman Street on a curve, each featuring a 45-foot mini-high platform at their southern extremities. Local officials in Stoughton advocated for an underground station with a tunnel beneath downtown, akin to Hingham station on the Greenbush Line. Plans from 2013 proposed shifting tracks slightly westward south of Wyman Street, with full-length high-level platforms at Brock Street connected by an overhead pedestrian walkway. Additionally, nearly doubling existing parking capacity was planned, with redevelopment of former right-of-way and parking areas.

In June 2016, the MBTA revealed substantial cost overruns that delayed project completion until 2030, prompting consideration of interim rail service to New Bedford via Middleborough. By March 2017, revised plans divided the project into phases: Phase 1 would utilize the Middleborough route and open in 2024, serving both Fall River and New Bedford; Phase 2 would follow the Stoughton corridor with electrification, targeting a 2029 opening later adjusted to 2030. The town of Stoughton expressed opposition to any plan that would increase rail traffic through downtown grade crossings. As Phase 1 approached completion in 2024, the timeline and scope of Phase 2 remained uncertain.


See also

External links

  1. ↑ 1.0 1.1 Cite error: Invalid <ref> tag; no text was provided for refs named 2009design
  2. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named trackchart
  3. ↑ 3.0 3.1 3.2 Cite error: Invalid <ref> tag; no text was provided for refs named formb
  4. ↑ 4.0 4.1 4.2 4.3 4.4 Cite error: Invalid <ref> tag; no text was provided for refs named 100years
  5. ↑ 5.0 5.1 5.2 5.3 5.4 Cite error: Invalid <ref> tag; no text was provided for refs named nrhp
  6. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named floyd