Susquehanna Railroad (1851–54)
| Company type | Railroad |
|---|---|
| Industry | Rail transport |
| Founded | 1858 |
| Fate | Purchased by Pennsylvania Railroad in 1861; later abandoned and partially converted to trails and heritage railways |
| Headquarters | Baltimore , United States |
Area served | Maryland, Pennsylvania |
| Products | Rail freight and passenger transport |
The Northern Central Railway (NCRY) was a Class I Railroad that linked Baltimore, Maryland to Sunbury, Pennsylvania by following the course of the Susquehanna River. Finished in 1858, it became part of the Pennsylvania Railroad (PRR) system in 1861 after PRR purchased a controlling stake, aiming to rival the competing Baltimore and Ohio Railroad (B&O).
Under PRR management for more than one hundred years, the Northern Central suffered a downturn after Hurricane Agnes severely damaged much of its Maryland tracks in 1972. The Penn Central company opted against restoring the line, resulting in its abandonment. Subsequently, the railway transitioned to ownership by Conrail and later the Norfolk Southern Railway.
Today, sections stretching from Camden Station in Baltimore to Timonium, Maryland still operate as part of the Baltimore Light RailLink. In Pennsylvania, Norfolk Southern maintains freight operations on portions of the original corridor. The heritage operation known as the Northern Central Railway of York runs excursion trains between New Freedom and Hanover Junction, Pennsylvania along former NCRY tracks.
The segment between York, Pennsylvania and the Maryland-Pennsylvania state line has been converted into the York County Heritage Rail Trail, which runs adjacent to active rail lines. Extending into northern Maryland, the connected Torrey C. Brown Rail Trail follows former rail alignments or rural roads all the way to Baltimore.
The need for a railroad
Agricultural producers and manufacturers in central and southern Pennsylvania required efficient channels for transporting grain, coal, lumber, and other commodities. Meanwhile, Baltimore and Philadelphia competed fiercely for access to this trade. The Piedmont and Appalachian mountain ridges obstructed direct routes from central Pennsylvania to coastal ports. Although the upper Susquehanna River provided a navigable waterway, obstacles such as Conewago Falls prevented travel all the way to Chesapeake Bay. Shippers often relied on rafts and flatboats that were dismantled upon arrival at Havre de Grace, Maryland; however, many vessels were damaged during transit.
Most goods successfully reached Baltimore—the nearest urban center on Chesapeake Bay’s outlet—much to the frustration of Philadelphia merchants. Although Pennsylvania and Maryland agreed in 1802 to construct a canal linking the Delaware River with Chesapeake Bay, this plan never materialized, leaving Philadelphia without direct water access to the Susquehanna. In 1826, Pennsylvania initiated the "Main Line of Public Works," a canal system designed to facilitate trade with Philadelphia. Nevertheless, challenges such as mountainous terrain, slow transit speeds, inconvenient route locations, and seasonal closures limited its success.
The Baltimore and Susquehanna Railroad
In 1827, York County toll-road operators partnered with Baltimore businessmen to form what became known as the Baltimore and Susquehanna Railroad Company (B&S). Local producers—frustrated by difficulties reaching Philadelphia markets and unfavorable trading conditions—sought new transportation alternatives. After surveys confirmed feasibility, Maryland granted a railroad charter on February 13, 1828, with initial funding set at $800,000. This made B&S Maryland’s second authorized railroad company authorized to construct a line from Baltimore northeastward to York Haven on the Susquehanna River.
George Winchester served as B&S president and persistently lobbied the Pennsylvania General Assembly to recognize Maryland’s charter for operations within Pennsylvania. However, legislators—especially those from Philadelphia—resisted efforts that would divert commerce toward Baltimore; they favored railroads owned within Pennsylvania so profits would remain local. As a result, B&S’s charter was initially denied.
Despite political resistance, construction commenced in 1829 along Jones Falls valley and reached Roland Run (now Lake Roland) by 1831. The terrain north of Baltimore presented significant engineering challenges including numerous stream crossings and steep slopes; bridges were needed at an average frequency of two per mile. On July 4, 1831, B&S launched horse-drawn passenger service between Belvedere Station in Baltimore and Roland Run. In 1832, they established a horse exchange station near Roland Run called “Relay,” which is sometimes confused with a nearby Baltimore & Ohio station that later gave rise to Relay, Maryland.
The Green Spring Branch
Anticipating potential postponements from the Pennsylvania legislature, the B&S obtained a legislative amendment from Maryland in 1830, permitting their route to terminate near the source of the Monocacy River around Westminster, Maryland. Initially, the company focused solely on reaching Owings Mills, where local mills desired better market connectivity. By August 1832, the line from Relay House through Green Spring Valley extended to Owings Mills, linking with the turnpike and facilitating mail delivery northward from Baltimore. To encourage travel and commerce, the B&S established the Green Spring Hotel close to Garrison as an attraction for visitors.
During the building phase, B&S acquired its first steam engine, the Herald, manufactured by Robert Stephenson in England. Arriving in the fall of 1832, it was adapted to a 4-2-0 wheel configuration to negotiate sharp curves. Starting in October 1832, the Herald operated twice daily services to Green Spring Valley and Owings Mills. This portion of the line came to be known as the Green Spring Branch, eventually evolving as a distinct segment.
The York and Maryland Line Rail Road
To secure access into Pennsylvania, B&S entered negotiations with Governor George Wolf in 1831, culminating in an agreement whereby Maryland would authorize a canal to the Susquehanna River if Pennsylvania permitted railroad entry through a Pennsylvania-based company. This arrangement led to the formation of the York & Maryland Line Railroad Company (Y&ML) on March 14, 1832.
B&S acquired limited operational rights within Pennsylvania and extended its track to Timonium in 1832. Alongside building the Green Spring Branch and obtaining its inaugural locomotive, B&S developed Bolton Station and Yard—its principal terminal and maintenance facility—on property donated by founder George Winchester. Furthermore, B&S gained rail access to Baltimore Harbor by collaborating with the Baltimore & Ohio Railroad (B&O) on a jointly owned rail segment connecting Bolton Yard with B&O’s lines at Pratt Street. Despite restrictions mandating horse-drawn freight cars on city streets, B&S utilized B&O’s freight terminals.
Although operations on the Green Spring Branch generated some income, B&S faced financial challenges due to elevated expenses and a charter clause permitting customers to employ their own freight cars at rates lower than those charged by B&S for its freight services. Investor confidence diminished following limited profits; nevertheless, support came from Maryland state and Baltimore city authorities who collectively purchased nearly half of $450,000 in shares and extended loans totaling $2.7 million.
Positioned strategically near water-powered mills and various industries, each mile of track opened new commercial opportunities including mines and farms. Construction progressed sporadically because of funding limitations; by 1835, B&S had reached Cockeysville and had extended tracks to the Maryland-Pennsylvania border near Freeland by 1837.
At this stage, Y&ML formally took over construction duties but lacked sufficient capital until 1837; consequently, B&S crews continued laying track financed through Y&ML stock and bond issues. Essentially functioning as a "paper company," Y&ML began with capitalization of only $200,000—far below what was necessary for actual construction requirements.
By acquiring $200,000 worth of Y&ML shares and receiving $350,000 in payments for construction debts via Y&ML securities, B&S effectively gained control over the York and Maryland Line Railroad. Within this framework, the rail line connecting York to Baltimore was completed in 1838—including the Howard Tunnel near Seven Valleys, Pennsylvania—which remains the oldest operational railroad tunnel in the United States.
The Wrightsville, York, & Gettysburg Railroad
Initially intended to extend to the Susquehanna River at York Haven, the B&S board redirected efforts to construct a line from York to Wrightsville, anticipating that the Susquehanna and Tidewater Canal would link Chesapeake Bay with the upper Susquehanna region. The existing bridge between Columbia and Wrightsville connected Wrightsville to Columbia, a crucial node bridging Pennsylvania’s canal network and the Philadelphia and Columbia Railroad. This development led to the 1837 establishment of the Wrightsville, York, & Gettysburg Railroad (WY&G).
The WY&G’s charter permitted shared track usage with the York and Maryland Line Railroad. Construction from York to Wrightsville was financed by the Baltimore and Susquehanna Company between 1838 and 1840, which also gained control of WY&G by 1839 through stock acquisitions. This new route realized the initial objective of facilitating efficient freight movement from the Susquehanna River to Baltimore, enhancing profitability for Wrightsville and communities along the B&S line despite opposition from Pennsylvania authorities. Concurrently, B&S expanded its locomotive inventory from a single engine in 1837 to eleven by 1839 as its rail network extended.
The York and Cumberland Railroad
Following completion of WY&G during a nationwide economic downturn, further expansion was temporarily suspended. Nevertheless, B&S sought to connect with York Haven and Harrisburg—Pennsylvania’s capital—which served as a strategic hub linking the Lancaster and Philadelphia Railroad eastward and the Cumberland Valley Railroad southwestward. Harrisburg’s significance as a terminus increased after the Pennsylvania Railroad was chartered in 1846.
The York and Cumberland Railroad Company (Y&C) was chartered on April 21, 1846, aiming to connect the York & Maryland Line with the Cumberland Valley Railroad near Mechanicsburg. Due to funding difficulties within Pennsylvania, Y&C shares were offered on open markets; Baltimore investors acquired over $700,000 worth, predominantly purchased by B&S. By January 1850, B&S had secured operational control through an agreement. Construction commenced that year, extending tracks northward from York to York Haven on the Susquehanna River, then following the riverbank to link with the Cumberland Valley Railroad at Lemoyne (then known as Bridgeport). Service began in 1851. Unlike earlier arrangements, B&S leased Y&C’s tracks for operations, incurring additional costs.
The Susquehanna Railroad and financial difficulties
Although B&S had taken control of three other railroads, their construction was largely funded through loans from Maryland and Baltimore entities that required repayment. The company owed $113,000 in interest to Maryland but could only manage annual payments of $40,000. Additionally, transporting customers’ privately owned freight cars at rates below cost constrained profitability. To increase revenue streams, B&S targeted central Pennsylvania’s lucrative coal regions by planning extensions northward beyond the York and Cumberland Railroad.
To pursue this expansion, the Susquehanna Railroad (SRR) was chartered on April 14, 1851, authorized to build along the Susquehanna River towards Halifax, Millersburg, Sunbury, and ultimately Williamsport. Initial stock subscriptions were weak; therefore, Baltimore and Susquehanna Railroad along with York and Cumberland provided loans in exchange for SRR shares. Between 1852 and 1853, Pennsylvania authorized loans up to $500,000 from associated railroads and local governments to support SRR’s capital needs. With Baltimore’s backing secured, construction began.
By 1854 however, track had only reached Maryville despite $800,000 being spent on grading toward Millersburg and Sunbury; work then ceased.
B&S confronted escalating costs as traffic volumes surpassed what original wooden rails could safely handle, leading to derailments. Initially emphasizing rapid and economical construction aimed at swift revenue generation—unlike the more expensive Baltimore and Ohio Railroad—the company was compelled to upgrade infrastructure due to growing demand. Beginning in 1851 with acquisitions of heavy “Camel” locomotives, nearly every bridge required reconstruction; sharp curves were eased; wooden rails topped with strap iron were replaced by imported rolled iron “T”-rails from England. By 1854 substantial track improvements between Baltimore and Lemoyne were completed with further legislative assistance from Maryland; bridge repairs continued over subsequent years.
To meet increasing passenger demand, B&S replaced Belvedere Station with the new Italianate Calvert Street Station in Baltimore in 1850. Designed by architects Niernsee and Neilson, it became an enduring emblem for both B&S and its successor Northern Central Railway.
Starting in 1840, B&S began constructing a line toward Baltimore Harbor but encountered costly delays with limited returns. Efforts between 1850 and 1851 to extend tracks to Canton harbor were obstructed by lawsuits and an injunction from Baltimore and Ohio Railroad forces, necessitating continued reliance on horse-drawn freight transport to City Dock.
The combined financial burdens of constructing the Susquehanna Railroad alongside other projects led to bankruptcy for B&S and its affiliates. In response, Pennsylvania and Maryland legislatures approved consolidation of Baltimore & Susquehanna Railroad, York & Maryland Line, York & Cumberland Railroad, and Susquehanna Railroad in 1854. Maryland converted outstanding debts into a single mortgage requiring annual payments of $90,000 or $1.5 million over ten years. The Northern Central Railway Company (NCRY) was established on December 4, 1854, assuming control of these lines on January 1, 1855. Although formal merger occurred later, NCRY operated the Wrightsville, York & Columbia Railroad until selling it to Pennsylvania Railroad in 1870 after gaining control of NCRY.
The Western Maryland Railroad
The Western Maryland Railway (WM) originated from intricate corporate transitions involving the Baltimore and Susquehanna Company. Following the merger of B&S with the York and Maryland Line Railroad, upkeep of the Green Spring Branch diminished, restricting its operational capacity. To address local transportation needs, the Maryland legislature in 1846 authorized restoration work from Relay to Owings Mills, which led to the establishment of the Baltimore, Carroll and Frederick Railroad in 1852. This entity was rebranded as the Western Maryland Railway in 1853. The railway's objective was to extend its line from Owings Mills to Hagerstown, aiming to link with the Cumberland Railroad.
In 1857, Western Maryland acquired ownership of the Green Spring Branch along with rights to use B&S tracks into Baltimore. They undertook refurbishments and extended the route to Hagerstown by 1872. By 1873, WM constructed its own independent line into Baltimore, subsequently returning control of the Green Spring Branch to the Northern Central Railway. Moreover, starting in 1852, B&S operated the Hanover Branch Railroad, which later merged with the Gettysburg Railroad and was incorporated into Western Maryland's system in 1886.[1]
Consolidation and expansion
Following the consolidation of four railroads, Northern Central Railroad (NCRY) assumed responsibility for most debts except for Baltimore’s loan to B&S, which was waived under conditions that included completing the Sunbury line and building a new double-tracked route into Baltimore harbor—requirements prompted by a fatal collision in 1854 that underscored capacity constraints.
With initial funding of $8 million plus an additional $2.5 million, NCRY recommenced construction toward Sunbury in 1856. By August 1858, it had spanned the Susquehanna River at Dauphin and reached near Sunbury. Prior to full completion, passengers utilized a combination of rail travel and canal boats. On August 18, 1858, uninterrupted rail service between Baltimore and Sunbury officially commenced.
This extension connected NCRY with feeder lines such as the Lykens Valley Railroad and Trevorton Coal & Railroad Company, enabling efficient coal transportation from mines east of Susquehanna to broader markets—a vital revenue stream. The railroad also linked with Shamokin Valley and Pottsville Railroad lines that transported coal from Shamokin and Mount Carmel.[2]
Nevertheless, NCRY encountered resistance entering Sunbury from local officials allied with Philadelphia interests intent on protecting their trade routes. Passengers and freight were required to transfer via carriage over a short distance to connect with rival Sunbury and Erie Railroad terminals. The Sunbury and Erie Railroad had been chartered in 1852 specifically to regain commerce lost to NCRY; despite unsuccessful efforts to obstruct NCRY operations, opposition remained strong.
By late 1858, NCRY operated the financially troubled Sunbury and Erie Railroad under contract. Initially managed by Catawissa, Williamsport & Erie Railroad, operations shifted to NCRY once track connections were established. Both companies agreed to share trackage rights between Williamsport and Harrisburg when equipment availability permitted.[3]
Success and foreclosure
Following its consolidation, the Northern Central Railway saw remarkable expansion, with business volumes rising by 80% between 1856 and 1860. Efficiency improved through the implementation of uniform timetables, which shortened both travel and freight transit durations. By 1860, the company had installed telegraph lines along its full length, facilitating enhanced communication among key stations. Its connections to multiple railroads and Pennsylvania’s canal system created a lucrative transportation corridor stretching from Baltimore to Lake Erie.
Despite operational advancements, the railroad encountered financial difficulties. Significant indebtedness combined with ongoing construction costs placed a strain on resources. Previous owners had neglected maintenance, requiring expensive overhauls such as substituting wooden and strap-iron rails with rolled-iron “T” rails beginning in 1858, as well as replacing more than 75 bridges between 1855 and 1859.
As the railroad expanded its role in coal transportation, demand for additional locomotives and freight cars surged. However, limited shipping infrastructure at Baltimore harbor—still dependent on horse-drawn railcars—caused congestion issues. Efforts to construct an off-street line to Canton harbor were impeded by legal disputes and right-of-way complications.
By the close of 1860, Northern Central Railway was burdened with $2.85 million in debt but held just $283,000 for interest payments, insufficient to cover the $90,000 annual mortgage owed to Maryland. The state initiated foreclosure proceedings late that year but was temporarily stalled by a $120,000 loan from NCRY president John Sterett Gittings. When foreclosure threats reemerged in 1861, the Pennsylvania Railroad purchased a controlling stake, making Northern Central a subsidiary until the Pennsylvania Railroad’s decline in the late 20th century.
Build-up to the Civil War and the PRR takeover
Prior to the Civil War, the Northern Central Railway (NCRY) was involved in the Underground Railroad network; employees and local residents along its route assisted fugitive slaves despite the restrictions imposed by the Fugitive Slave Act of 1850. Financially, the railroad faced uncertainty due to its strategic yet exposed position near potential conflict zones, causing investor reluctance.
In 1860, Pennsylvania Senator Simon Cameron, a significant NCRY shareholder and former president of the Susquehanna Railroad, suggested that the Pennsylvania Railroad (PRR) acquire NCRY shares to establish joint control. Following Abraham Lincoln’s election that year, tensions escalated; John W. Garrett, president of competing Baltimore and Ohio Railroad, divested his NCRY holdings, which PRR leaders—including president J. Edgar Thomson and vice-president Thomas A. Scott—swiftly acquired. By 1863, PRR had obtained a controlling interest of 33.79% after purchasing additional shares in London.
Cameron’s appointment as Secretary of War under Lincoln helped secure contracts for NCRY through PRR vice-president Scott’s position as Assistant Secretary of War. Although Cameron was dismissed in 1862 amid corruption allegations, contracts related to wartime logistics provided essential revenue for NCRY to avoid foreclosure by Maryland and eliminate its debts by that year.
Initially included in Lincoln’s inaugural whistle-stop journey in early 1861, NCRY’s route was replaced due to concerns over assassination threats in Maryland. For security reasons, Lincoln traveled via the Philadelphia, Wilmington and Baltimore Railroad instead of passing through Baltimore’s hostile environment. This precaution ensured his safe arrival in Washington despite fears surrounding the so-called “Baltimore Plot.”
The Civil War
Throughout the Civil War, the Northern Central Railway (NCRY), under Pennsylvania Railroad control, served as a crucial conduit for transporting troops, supplies, and equipment from Northern military installations such as Camp Curtin. During the 1863 Gettysburg Campaign, Confederate troops led by Maj. Gen. Jubal A. Early targeted the NCRY in York, inflicting damage on rolling stock and machine shops and demolishing bridges to interrupt the Baltimore-Harrisburg route. These structures were swiftly restored by Herman Haupt and the U.S. Military Railroad, enabling rail operations to continue. The line played a vital role in evacuating thousands of wounded soldiers from Gettysburg to medical facilities in Harrisburg, Baltimore, and York.
On July 10, 1864, the NCRY endured another assault when about 130 Confederate cavalrymen commanded by Gen. Bradley T. Johnson severed telegraph lines near Cockeysville and engaged Union forces in a brief skirmish before rejoining their main contingent.
President Abraham Lincoln journeyed along the Northern Central Railway en route to deliver his Gettysburg Address in November 1863. Following his assassination, Lincoln’s funeral train traveled the same route from Washington, D.C., to Springfield, Illinois, pausing at Baltimore’s Camden Station before continuing on the Northern Central line to Harrisburg.
In 1873, the NCRY inaugurated Charles Street Station in Baltimore and connected to the Canton district via the Union Railroad of Baltimore, establishing a shipping terminal on the Inner Harbor. This connection finalized an essential link among NCRY, PW&B, and the Baltimore and Potomac Railroad. The Northern Central acquired ownership of the Union Railroad in 1882, allowing Pennsylvania Railroad to operate through trains between Philadelphia, Baltimore, and Washington, D.C.—a corridor now incorporated into the Northeast Corridor.
The Millersburg Passenger Rail Station was constructed by NCRY in 1898, further enhancing its regional network.
20th century
By the time of World War I, the Pennsylvania Railroad’s Northern Central line featured double tracks and block signal systems between Baltimore and Harrisburg, accommodating substantial passenger and freight volumes well into the 1950s. Freight shipments included flour, paper products, milk, agricultural goods, coal, and less-than-carload consignments serving communities such as White Hall, Parkton, Bentley Springs, Lutherville, and Baltimore.
A local commuter service known as the "Parkton local" operated along a 28-mile stretch between Calvert Station in Baltimore and Parkton. Additionally, PRR ran long-distance passenger trains equipped with sleepers and dining cars from Baltimore Penn Station to destinations including Buffalo, Toronto, Chicago, and St. Louis; through sleeping car service extended as far as Houston. Most westbound freight traffic was routed via the electrified Port Road Branch to Enola Yard in Harrisburg rather than over the Northern Central mainline.
Rail operations declined during the 1950s due to competition from Interstate 83; commuter services were discontinued in 1959 and track was reduced to a single line. The Red Arrow service connecting Washington D.C. to Detroit ended in 1960. Some long-distance trains such as the General, Penn Texas, and Buffalo Day Express continued running until the late 1960s. The line ceased all operations in 1972 following severe damage caused by Hurricane Agnes. At that time, it ranked among the nation’s oldest railroads with a continuous history spanning 134 years.
Penn Central and subsequent developments
In 1968, the Pennsylvania Railroad (PRR) combined with New York Central to create Penn Central (PC). However, PC declared bankruptcy in 1970 and operated under judicial oversight until 1976, when its routes were transferred to Conrail as part of federally mandated railroad restructuring efforts.
After suffering damage from Hurricane Agnes, Penn Central sought permission to discontinue operations on the line south of York. In June 1973, the Pennsylvania Department of Transportation purchased the York to New Freedom segment. Meanwhile, Baltimore County acquired the Maryland stretch of this abandoned railway during the mid-1970s.
A branch of the Spirit of St. Louis, which was later renamed Amtrak’s National Limited, provided service along the Washington D.C.–Harrisburg corridor until its termination in 1979.
Current legacy
Norfolk Southern managed a 13-mile portion of the former Northern Central Railway between Baltimore and Cockeysville up until 2005. This section was reconstructed and electrified in the late 1980s to support the double-track Baltimore Light Rail system. Under an agreement with the Maryland Transit Administration, Norfolk Southern operated local freight trains during overnight hours.
Rail trails
The Pennsylvania Department of Transportation took ownership of the York to New Freedom segment in 1973. Since 1978, cyclists have utilized the York County Heritage Rail Trail, which was later paved during the 1990s.
North of Cockeysville, the Maryland Department of Natural Resources transformed the corridor into the Torrey C. Brown Rail Trail (also known as the NCR Trail), inaugurated in 1984. This trail links with the York County Heritage Rail Trail at the Mason–Dixon line.
Several historic structures within York County—including Bridge 182+42, Bridge 5+92, Bridge 634, South Road Bridge, Howard Tunnel, and New Freedom Railroad Station—are recognized on the National Register of Historic Places.
Heritage railway
A heritage railroad operated dinner train excursions on the NCRY line from the mid-1990s through the early 2000s.
In 2013, Northern Central Railway of York (previously Steam Into History) commenced operations between New Freedom and Hanover Junction, featuring a replica Civil War-era 4-4-0 steam locomotive as part of its offerings.
See also
References
- Gunnarsson, Robert L. (1991). The Story of the Northern Central Railway: From Baltimore to Lake Ontario. Sykesville, MD: Greenberg Pub. Co.
- Williams, Robert L. (2021). Northern Central Railway: Images of Rail. Charleston, SC: Arcadia Publishing.
External links
- Defunct Maryland railroads
- Defunct Pennsylvania railroads
- Defunct New York (state) railroads
- Predecessors of the Pennsylvania Railroad
- Pennsylvania in the American Civil War
- History of Maryland
- History of Pennsylvania
- Former Class I railroads in the United States
- Railway companies established in 1854
- Railway companies disestablished in 1976
- Transportation in York County, Pennsylvania
- 1854 establishments in Pennsylvania
- American companies established in 1851
- Companies of the United States by year of establishment