Jump to content

Taraval and 22nd Avenue / Taraval and 23rd Avenue stations

From Alfawiki
Adapted from the English Wikipedia article Taraval and 22nd Avenue / Taraval and 23rd Avenue stations, available under CC BY-SA 4.0Updated 7 August 2025
Parkside Transit Company
IndustryPublic transportation
Founded1908
FounderUnited Railroads (subsidiary)
FateCeased Parkside Shuttle service by late 1927
Area served
San Francisco, California

Taraval and 22nd Avenue / Taraval and 23rd Avenue stations consist of two light rail stops on San Francisco's Muni Metro L Taraval route, situated within the Parkside district. The eastbound platform is positioned at the intersection of Taraval Street and 22nd Avenue, whereas westbound trains halt at Taraval Street and 23rd Avenue.

History

The Parkside Transit Company, a subsidiary of United Railroads (URR), constructed a single-track line along 20th Avenue connecting to Wawona Street and 19th Avenue in June 1908. By 1910, a shuttle service operated from 20th Avenue via Taraval Street to Sloat Boulevard, where it linked with the 12 Ocean line. This infrastructure restricted the Municipal Railway’s city-owned expansion into Parkside until the 1918 "Parkside Agreements" permitted Muni streetcars to operate on URR tracks along Taraval Street and Ocean Avenue for a fee and shared upkeep responsibilities. The L Taraval service commenced operations up to 33rd Avenue on April 12, 1919, utilizing refurbished URR rails. The URR ceased its Parkside Shuttle by late 1927.

Initially, L Taraval stops were positioned every two blocks between 22nd and 32nd Avenues, with passengers boarding from designated poles located within travel lanes. In the 1990s, modifications near McCoppin Park enhanced accessibility by introducing small raised platforms and concrete boarding islands west of 23rd Avenue (westbound) and east of 22nd Avenue (eastbound). However, non-accessible stops remained active at eastbound 24th Avenue and westbound 22nd Avenue.

The Transit Effectiveness Project (later known as MuniForward), launched in March 2014, recommended consolidating stops by removing the westbound stop at 22nd Avenue and the eastbound stop at 24th Avenue, merging accessible platforms at 22nd and 23rd Avenues into a unified stop.

On September 20, 2016, the SFMTA Board approved the L Taraval Rapid Project, scheduled for construction between 2018 and 2020. This plan included extending the eastbound boarding island near 21st Avenue eastward from 22nd Avenue and lengthening the westbound island across 23rd Avenue. Initial adjustments implemented on February 25, 2017, discontinued westbound service at 22nd Avenue and eastbound service at 24th Avenue.

Due to the COVID-19 pandemic, Muni Metro rail operations were replaced by bus services starting March 30, 2020. Rail service briefly resumed on August 22 but reverted back to buses three days later on August 25. Construction for Segment B of the L Taraval Improvement Project, spanning from West Portal to Sunset Boulevard, began in January 2022 and concluded by mid-2024. Rail service recommenced on September 28, 2024.

External links