TfL Rail
| Company type | Train operating company (franchise) |
|---|---|
| Industry | Rail transport |
| Founded | May 31, 2015 |
| Defunct | May 2022 |
| Fate | Rebranded as Elizabeth line |
| Headquarters | London , United Kingdom |
Area served | London and neighboring regions |
Key people | MTR Corporation (operator), Transport for London (oversight) |
| Products | Commuter train services |
TfL Rail was the franchise responsible for operating commuter train services on two distinct rail corridors in London and its neighboring regions during the Crossrail project development. Functioning from 2015 until May 2022, the service was rebranded as the Elizabeth line following the inauguration of the central section.[1]
Commencing operations on 31 May 2015, TfL Rail assumed control from Abellio Greater Anglia of the "metro" route running between and in Essex, encompassing the initial 14 stops along the Great Eastern Main Line. The station at Shenfield served as a transfer point to longer-distance trains heading towards East Anglia. Additionally, TfL Rail managed services from to Heathrow Airport and Reading. The operating contract was held by MTR Corporation under the oversight of Transport for London (TfL). Between May 2016 and May 2017, TfL Rail transported more than 47 million passengers on the Shenfield route.
History
In June 2013, TfL shortlisted several contenders—Arriva, MTR Corporation, Keolis / Go-Ahead Group, and National Express—to compete for the Crossrail operating franchise.[2]
By July 2014, TfL awarded the eight-year contract, with a possible two-year extension, to Hong Kong-based MTR.[3]
The new train operating company, MTR Corporation (Crossrail), was formed to take over the metro service between London Liverpool Street and Shenfield from Abellio Greater Anglia starting on 31 May 2015.[4] Existing rolling stock was updated with TfL Rail branding, and full staffing was introduced across stations along the route. In June 2017, new modern Class 345 trains entered service on the Liverpool Street to Shenfield line.[5]
In May 2018, TfL Rail extended its operations by taking over Heathrow Connect services running between London Paddington and Heathrow Airport, along with certain Great Western Railway (GWR) routes between Paddington and Hayes & Harlington.[6] By December 2019, TfL Rail had also taken over GWR stopping services from Paddington to Reading, with Class 345 trains having begun running since November as part of a phased introduction.[7][8][9] In July 2020, Class 345 trains were introduced on the Paddington to Heathrow corridor.[10]
These routes were incorporated into the Elizabeth line network upon the opening of its central section on 24 May 2022, effectively connecting existing branches through the core segment.[11]
Route
The eastern segment of TfL Rail covered over 20 miles along the Great Eastern Main Line between London Liverpool Street and Shenfield. On the western side, branches operated partly along the Great Western Main Line and through the Heathrow tunnel connecting London Paddington with Heathrow Airport over approximately 16 miles, as well as entirely along the Great Western Main Line between London Paddington and Reading spanning about 36 miles.
Stations
... [table continues with remaining stations] ...
Shenfield line
Operations were transferred to TfL Rail from Abellio Greater Anglia on 31 May 2015, accompanied by the introduction of a modern train fleet. Passenger services on the Shenfield line started using Class 345 trains on 22 June 2017, replacing the older Class 315 models. While the Class 315 trains continued to be serviced at Ilford depot, maintenance of the Class 345 fleet occurs at both Old Oak Common and Ilford depots.
Heathrow line
Upon assuming control on 20 May 2018, TfL Rail inherited five units from Heathrow Connect, running a service every thirty minutes to Heathrow. The Heathrow branch began operating Class 345 trains on 30 July 2020, with the final Class 360 units being phased out by September that year.
Reading line
TfL Rail declared on 26 September 2019 that it would assume responsibility for the stopping services between Paddington and Reading starting 15 December 2019. This transition involved replacing Great Western Railway’s Class 387 and Class 165 trains with Class 345 units. In preparation, beginning 25 November 2019, six daily GWR services operated by TfL using Class 345 trains helped familiarize drivers and position rolling stock ahead of the full takeover in December.
Service patterns before Elizabeth line launch
Prior to the Elizabeth line's inauguration on 24 May 2022, the off-peak weekday schedule was as follows:
| Shenfield line | |||
|---|---|---|---|
| Route | tph | Stops | Rolling stock |
| London Liverpool Street to Shenfield | 8 | Stratford, Maryland, Forest Gate, Manor Park, Ilford, Seven Kings, Goodmayes, Chadwell Heath, Romford, Gidea Park, Harold Wood, Brentwood | 345, 315 |
| Reading and Heathrow lines | |||
| Route | tph | Stops | Rolling stock |
| London Paddington to Reading | 2 (up to 4 during peak) | Ealing Broadway, Southall, Hayes & Harlington, West Drayton, Iver, Langley, Slough, Burnham, Taplow, Maidenhead, Twyford | 345 |
| London Paddington to Hayes & Harlington | 2 | Ealing Broadway, West Ealing, Hanwell, Southall | 345 |
| London Paddington to Heathrow Terminal 4 | 2 | Acton Main Line, Ealing Broadway, West Ealing, Hanwell, Southall, Hayes & Harlington, Heathrow Terminals 2 & 3
[lower-alpha 2] || align="center" | 345 | |
Rolling stock retained for Elizabeth line
| Class | Image | Type | Maximum speed | Number of carriages | Quantity | Routes served | Manufacture period | Service years | |
|---|---|---|---|---|---|---|---|---|---|
| mph | km/h | ||||||||
| Class 315 | EMU | 75 | 120 | 4 | 8Template:Fix/category[citation needed] | Template:Stn – Template:Rws | 1980–1981 | 1980–2022 | |
| Class 345 Aventra | EMU | 90 | 145 | 7 or 9 | 70 | 2015–2019 | June 2017–present | ||
Previous fleet
The rolling stock previously utilized by TfL Rail consisted of the following:
| Class | Image | Type | Maximum speed | Number of carriages | Quantity | Lines served | Year built | Year retired | |
|---|---|---|---|---|---|---|---|---|---|
| mph | km/h | ||||||||
| Class 360 Desiro | EMU | 100 | 160 | 5 | 5 | London Paddington to Heathrow Terminal 4 (Heathrow Connect) | 2004–2005 | 2020 | |
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedStandard - ↑ Crossrail 25 June 2013
- ↑ Crossrail 18 July 2014
- ↑ Romford Recorder 25 May 2015
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedthe-future-of-cross-london-travel-arriv - ↑ TfL press release 2018
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedTfL 201909 announcement - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedcrossrail-trains-have-started-running-to-reading-early - ↑ TfL press release 2019
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedfirst-345-heathrow - ↑ Crossrail plan
Cite error: <ref> tags exist for a group named "lower-alpha", but no corresponding <references group="lower-alpha"/> tag was found