US Standard Light Rail Vehicle
| Industry | Rail vehicle manufacturing |
|---|---|
| Headquarters | United States |
| Products | US Standard Light Rail Vehicle (SLRV) |
US Standard Light Rail Vehicle
The US Standard Light Rail Vehicle (SLRV), produced by Boeing Vertol during the 1970s, was endorsed by the Urban Mass Transportation Administration (UMTA) as a uniform light rail vehicle model for American urban transit systems. Originating in the late Vietnam War period as part of defense industry repurposing efforts, the SLRV was designed to replace outdated PCC streetcar fleets and foster the expansion of new light rail networks. Often referred to as the Boeing LRV or simply SLRV, it should not be confused with Boeing’s earlier lunar rovers developed for NASA.
The MBTA in Boston and the Muni in San Francisco both incorporated the SLRV into their fleets. Introduced in 1976, these vehicles encountered major reliability problems, which led to their gradual retirement starting in 1987. Despite these operational difficulties, the SLRV remained active on both systems until 2007. Although the vehicle itself did not achieve success, it played a role in shaping subsequent U.S. light rail vehicle dimensions and design criteria.
Origin
The concept for the SLRV arose in the late 1960s as cities operating aging PCC streetcars—whose last units were manufactured in 1952—sought modern replacements. In 1968, Boston’s MBTA developed a wooden prototype for a "Type 6" streetcar but halted the project due to excessive production expenses. Meanwhile, San Francisco's Muni released a 1971 request for proposals (RFP) for 78 new vehicles designed by Louis T. Klauder and Associates (LTK) to supplant its PCC fleet. These so-called "subway-streetcars" were customized for San Francisco’s combined subway and surface routes and featured increased passenger capacity. In November 1971, Muni received two bids; Boeing submitted the lowest at , yet both were declined because development costs could not be amortized over a limited production quantity.
In 1970, Düwag constructed a prototype demonstrator for the Hanover Stadtbahn system; subsequently, in June 1971, MBTA ordered two similar "Hanover" cars partially financed through an UMTA grant. However, following the Nixon administration's "New Economic Policy," UMTA funding became constrained. The Surface Transportation Assistance Act of 1978 introduced "Buy America" rules that prohibited grants exceeding $500,000 for transit vehicles manufactured abroad unless special exceptions were granted. As a result, Boston collaborated with San Francisco and Philadelphia to jointly develop a new streetcar model accommodating all three cities’ requirements.
After unsuccessful attempts to individually acquire Type 6, Düwag, and LTK/Muni streetcars, UMTA established the BSF (Boston and San Francisco) Committee to create a standardized light rail vehicle aimed at lowering unit costs—echoing the earlier PCC strategy. The Standard Light Rail Vehicle (SLRV) specifications were crafted by UMTA based on LTK’s 1971 design, incorporating feedback from transit operators in Boston, San Francisco, Philadelphia (SEPTA), Cleveland (Shaker Heights), Pittsburgh (Port Authority), New Jersey, El Paso (City Lines), Toronto Transit Commission (TTC), along with consultants Parsons Brinckerhoff and Louis T. Klauder and Associates. This effort coincided with numerous defense conversion initiatives promoted by government programs seeking to maintain defense suppliers as the Vietnam War drew to a close.
Contracts awarded
On October 20, 1972, UMTA allocated $33 million to the MBTA for acquiring 150 SLRVs. Subsequently, on April 23, 1973, MBTA finalized an agreement with Boeing Vertol to manufacture these vehicles. Shortly after, on May 1, 1973, UMTA granted Boeing-Vertol a contract to construct the SLRVs at an estimated cost near $300,000 per unit—specifically $316,616 each for Muni’s design and $293,422 for MBTA’s version. Initially, Muni placed an order for 80 units while MBTA requested 150, with production commencing immediately at a combined expenditure of $69 million. MBTA’s share amounted to $44 million for their 150 cars; later, orders increased to 100 and 175 units respectively, resulting in an additional $7.6 million for MBTA’s extra 25 vehicles. UMTA contributed $7 million toward this supplementary funding on June 10, 1974. Notably, the SLRV represented the first trolley produced in the United States since 1952.
By late 1974, the initial SLRV was operational on Boeing’s test track. The first demonstrator model, built in 1975 for early deployment by Muni, underwent an 11-week trial period in Boston. In fall 1975, three cars (two for Muni and one for MBTA) were dispatched to the Transportation Test Center in Pueblo, Colorado under Boeing’s engineering evaluation contract. MBTA received its first test vehicle in September 1976—arriving two years later than planned. This unit was equipped with both trolley poles and pantographs because MBTA was still modernizing its overhead wire system to accommodate pantographs.
Operators
The initial four SLRVs (numbers 3415, 3416, 3418, and 3421) began revenue service on December 30, 1976, operating along the MBTA's Green Line D branch. Service was halted on April 16, 1977 due to frequent derailments; by that time, 31 SLRVs had been delivered. In San Francisco, the first two SLRVs arrived in October 1977 fitted with trolley poles as conversion to pantographs was incomplete. Production units equipped solely with pantographs started arriving in December 1978. Regular service for Muni commenced on April 23, 1979 and expanded further with the launch of the Muni Metro on February 18, 1980.
Muni’s system design intended for SLRVs to be coupled in sets of up to four cars through the Twin Peaks Tunnel and uncoupled afterward. However, slow door operations and delayed braking made SLRVs slower than PCC streetcars on surface routes, which compromised planned headways and efficient terminal turnarounds. After deciding to acquire cars initially rejected by MBTA, Muni constructed a new maintenance facility spanning 6.5 acres near Balboa Park station.
The Greater Cleveland Regional Transit Authority tested MBTA car #3401 in mid-1976 but opted against purchasing US-made SLRVs due to higher costs and instead selected Breda Costruzioni Ferroviarie vehicles following more competitive bids. SEPTA initially evaluated the US SLRV because of potential local manufacturing benefits but ultimately chose Kawasaki LRVs since the SLRV could not navigate the City Hall loop; SEPTA specified a narrower vehicle width that excluded it from consideration. Kawasaki LRVs destined for SEPTA were assembled at Boeing Vertol’s facility to comply with "Buy America" regulations.
Though Pittsburgh, New Orleans, and Newark participated with UMTA during early SLRV design phases, none proceeded to purchase these vehicles. Pittsburgh converted its streetcar network and acquired Siemens SD-400 light rail cars based on European designs. Newark operated PCC streetcars until replacing them in 2001 with Kinki Sharyo low-floor LRVs. New Orleans continues running historic Perley Thomas-built streetcars supplemented by replica vehicles. More recent US light rail systems have procured custom vehicles from manufacturers such as Siemens, Kinki Sharyo, Breda, among others.
The US SLRV model also served as a design influence during early development of Canadian Light Rail Vehicles.
| Operator | Year Built | Fleet Series | Quantity | Year of retirement | Notes |
|---|---|---|---|---|---|
| MBTA |
1976–78 | 3400–3534 | 144 | 1987–2007 | Cars numbered 3417, 3448, and 3453 were converted into maintenance of way units; car number 3424 preserved at Seashore Trolley Museum (2009). |
| 1977Template:Fix/category[citation needed] | 3535–3543 | Initially rejected batch; subsequently delivered with thirty-one cars going to Muni and nine returning to MBTA in 1983. Car number 3541 was transferred to the U.S. Army in 2000. | |||
| Muni (LRV1) |
1978 | 1200–1299 | 131 | 1996–2001 | Two prototypes delivered in October 1977 (1220–1221; later renumbered). Vehicles damaged during testing were either scrapped or rebuilt using components from former MBTA units. |
| 1977Template:Fix/category[citation needed] | 1300–1329 | Total of thirty-one cars; the first from the rejected MBTA batch replaced wrecked units and was renumbered accordingly. Remaining ex-MBTA cars entered service between 1981 and1984. |
Challenges
Prior to delivery, Boeing assured that the US SLRV would offer dependable performance with minimal maintenance demands. Nonetheless, from the outset of service, the SLRVs demonstrated significant mechanical and financial burdens. Within just three months, MBTA was compelled to suspend all light rail operations for approximately nine to ten days due to a shortage of functional equipment. Since retiring the PCC cars was not feasible, MBTA launched a refurbishment program for these vehicles to supplement the SLRV fleet and sustain Green Line service. Similarly, in San Francisco, persistent SLRV difficulties delayed Muni Metro’s full operational capabilities until 1982.
The initial design targets specified mean time between failures (MTBF) as 1,400 hours (21,000 miles) for propulsion and auxiliary components; 1,500 hours (22,500 miles) for door and step mechanisms; and 4,000 hours (60,000 miles) for friction brakes. In contrast, by 1982 Muni’s SLRVs were failing every 600 miles (40 hours), though this improved to between 1,800 and 2,000 miles (120–133 hours) by 1988—still nearly fifteen times less reliable than the Siemens–Duewag U2 model employed by San Diego Trolley, which achieved an MTBF of 28,300 miles (1,890 hours).
At MBTA in Boston, new Boeing-Vertol vehicles were accepted at a pace exceeding maintenance capacity. Scarcity of replacement parts forced MBTA to cannibalize components from 35 disabled cars. To avoid public scrutiny, some cannibalized units were concealed within disused subway tunnels until media reports revealed their presence. After this disclosure, non-operational SLRVs became openly stored in yards as the number of disabled cars increased.
In May 1978, MBTA invested $2.2 million in spare parts; Muni followed with $1.5 million in parts procurement and requested an additional 200 personnel to support SLRV upkeep. However, shipments to MBTA ceased in June 1978 after delivering 135 cars amid ongoing reliability challenges. MBTA prepared the cannibalized fleet of 35 vehicles for return to Boeing and on October 9, 1978 rejected the final batch of 40 SLRVs, instructing Boeing-Vertol to reclaim the cannibalized units—citing unsatisfactory reliability as grounds for warranty breach. By that time, five cars had been delivered to Muni and underwent three rounds of modifications informed by MBTA’s operational experience.
Resolution
On December 15, 1978, MBTA and Boeing amended contract specifications permitting completion of the full 175-car order; nonetheless, reliability problems continued throughout 1979. An independent panel recommended restructuring MBTA’s light rail vehicle program to tackle these issues effectively. Early fleet availability frequently remained below 50%, with Green Line services missing 12,201 weekday trips during the second and third quarters of 1979—a rise of 184% compared to the previous year. In May 1979, MBTA and Boeing agreed on refurbishing and modifying the 35 cannibalized SLRVs; however, maintenance staff threatened strike action after MBTA directed Boeing to retrieve these cars instead of performing repairs in MBTA facilities. Boeing suspended further returns until labor disputes were settled.
During summer 1979 negotiations among MBTA, Muni, and Boeing focused on assigning responsibility for resolving ongoing defects. In September, Boeing proposed rectifying design shortcomings at its own cost—including issues like leaking gearboxes and traction motor failures—but MBTA declined this offer. Around this period, MBTA retained product liability lawyer William Schwartz to represent its interests in negotiations.
Boeing attributed failures to inadequate maintenance practices, substandard track conditions, operator errors, and cannibalization activities. Schwartz contended that SLRV availability was below 90%, imposing costs on MBTA estimated between $75 million and $100 million. On November 19, 1979, an agreement was reached: Boeing reimbursed $40 million toward repair expenses and modifications while MBTA reserved the right to refuse delivery of the remaining 40 cars from the contract. At settlement time, out of 135 delivered cars, 41 were nonfunctional due to design defects or cannibalization-related issues—requiring approximately $15.6 million for restoration.
This settlement ended all warranties; henceforth all repairs became MBTA’s responsibility. Boeing committed to providing modification kits for installation by MBTA at its own cost and warranted only against part defects—MBTA assumed financial risk for any necessary redesigns should problems persist. Schwartz’s $799,000 fee for negotiating this settlement prompted a legislative inquiry.
Final deliveries
The 40 MBTA cars that were rejected found temporary storage at Boeing-Vertol's facility until San Francisco's Muni acquired some at a significant markdown. The initial "Boston" vehicle obtained served as a replacement for two SLRVs that were irreparably damaged during 1979 Muni Metro subway trials. Following the successful adaptation of this unit, Muni proceeded to order an additional 30 cars from the rejected Boston batch to augment their fleet. These vehicles underwent modifications tailored for Muni Metro operations but preserved the distinctive wood grain interior detailing at the operator's cab and articulation area, contrasting with the original Muni fleet’s yellowish-orange "sunset" paint scheme.
By 1980, Boeing had withdrawn the SLRV from the market. In 1983, MBTA accepted nine of the remaining cars (numbers 3535–3543) from the previously declined lot. That same year, MBTA also received five cannibalized "shells," which had been delivered in the 1970s but returned to Boeing in 1979. Due to MBTA’s delayed compliance with the 1979 settlement conditions, ownership reverted to Boeing, and these shells were eventually dismantled for parts by 1988.
| Boeing SLRV |
Düwag U2 | PCC | CLRV | Buffalo LRV | |
|---|---|---|---|---|---|
| Axles/ articulation |
6/1 | 6/1 | 4/0 | 4/0 | 4/0 |
| Length | 71.5 ft 21.8 m |
75.5 ft 23.0 m |
43.5 to 50.5 ft 13.3 to 15.4 m |
50.67 ft 15.44 m |
66.8 ft 20.4 m |
| Width | 8.85 ft 2.70 m |
8.70 ft 2.65 m |
8.33 to 9.0 ft 2.54 to 2.74 m |
8.50 ft 2.59 m |
8.58 ft 2.62 m |
| Height | 11.5 ft 3.5 m |
10.8 ft 3.3 m |
10.1 ft 3.1 m |
11.0 ft 3.4 m |
12.3 ft 3.7 m |
| Floor height |
2.82 ft 0.86 m |
3.18 ft 0.97 m |
2.75 ft 0.84 m |
3.02 ft 0.92 m |
3.07 ft 0.94 m |
| Weight (empty) |
68,000 lb 31,000 kg |
66,000 lb 30,000 kg |
33,000 to 42,000 lb 15,000 to 19,000 kg |
52,000 lb 24,000 kg |
70,000 lb 32,000 kg |
| Seats | up to 68 | 64 | 49 to 69 | 42 or 47 | 51 |
| Minimum curve radius |
32 to 42 feet (9.8 to 12.8 m)* | 82[convert: needs unit name] | approx.[convert: needs a number] | [convert: needs a number] | unk. |
| Acceleration | [convert: needs a number] | [convert: needs a number] | [convert: needs a number] | [convert: needs a number] | [convert: needs a number] |
| Deceleration | [convert: needs a number] | [convert: needs a number] | [convert: needs a number] | [convert: needs a number] | [convert: needs a number] |
| Emergency deceleration |
[convert: needs a number] | [convert: needs a number] | [convert: needs a number] | [convert: needs a number] | [convert: needs a number] |
Design
The SLRV is a high-floor, double-ended articulated light rail vehicle measuring in length, which is shorter than many contemporary LRVs such as the minimum-length Siemens S70 and S700. It operates on three two-axle trucks arranged to accommodate a minimum track radius of . The vehicle’s dimensions were determined based on track limitations from MBTA (Boston), Muni (San Francisco), and SEPTA (Philadelphia). Each side of the car is equipped with three passenger doors, each wide; notably, there is no door at the rear cab. The unladen weight of the vehicle is , increasing to when carrying 100 passengers and reaching at a crush load capacity of 219 passengers.
Each end truck contains a single DC motor rated at , powered by 285 VDC through a 5.571:1 reduction gear. Initially, the design included powering the center truck to achieve a top speed of , but this was later revised to remove power from the center truck, lowering the maximum speed to . Traction motors utilize a solid-state "chopper" circuit for smooth power modulation up to ; beyond this speed, power is applied directly without modulation.
Dynamic braking converts the traction motors into generators, dissipating energy via resistor grids, complemented by friction disc brakes capable of holding a fully loaded car on a 9° incline. Six electromagnetic track brakes support hill starts and can be used in conjunction with primary brakes depending on operator preference. Although regenerative braking was part of the original design concept, it was not implemented on the SLRV but was introduced in similar CLRV models.
The articulated joint permits up to 16° of horizontal rotation along with minor vertical flexion, enabling the vehicle to negotiate curves as tight as in radius and accommodate varying vertical track profiles.
SLRVs are fitted with lightweight Acousta Flex composite resilient wheels measuring in diameter, featuring aluminum hubs cushioned by silicone rubber to minimize noise and squealing on sharp curves. Interior noise levels are approximately 65 dB. The trucks incorporate design elements inspired by Japanese Shinkansen trains, including rubber chevron springs and pneumatic suspension systems that automatically adjust floor height, combined with hydraulic and pneumatic damping.
The car bodies and truck frames were manufactured by Tokyu Car Corporation in Yokohama; Garrett supplied the traction motors, and final assembly occurred at Boeing’s facility in Ridley Park, Pennsylvania. After Boeing ceased production, Tokyu produced similar light rail vehicles for Buffalo Metro Rail which externally resemble the SLRV but differ significantly by lacking articulation joints, featuring external steps for low-platform boarding, and utilizing single-leaf pocket doors similar to those found on London Underground D Stock.
Differences
| MBTA | Muni | |
|---|---|---|
| Seating capacity | 52[lower-alpha 1] | 68 |
| Cab signaling | No | Yes |
| Steps | Fixed[lower-alpha 2] | Convertible[lower-alpha 3][lower-alpha 4] |
| Overspeed control | Yes[lower-alpha 5] | No |
| Destination signs | Manual | Automatic |
| Air conditioning | Yes[lower-alpha 6] | No[lower-alpha 7] |
| Track brakes | Blended | Independent |
| Wheel tread profile | 1:40 | 1:20 |
| Notes | ||
Although Boston and San Francisco acquired their SLRVs concurrently and they share a similar external appearance, several important differences are present:
- Doors: Muni’s vehicles feature movable steps on their four center doors, facilitating boarding from street level as well as elevated platforms typical of subways. In contrast, Boston’s fleet lacks movable steps, requiring passengers to board from street level only. Subsequently, MBTA replaced Boston’s original doors with bi-folding models, further distinguishing them from Muni’s design.
- Climate Control: The MBTA SLRVs were equipped with air conditioning systems tailored for Boston’s humid environment; these units encountered issues with dust accumulation and were eventually replaced by roof-mounted Sutrak units between the late 1980s and mid-1990s. Muni opted for forced-air ventilation due to San Francisco’s milder climate conditions.
- Interior Design: Boston’s vehicles featured wood grain finishes around the operator’s cab and articulation area, whereas Muni’s interiors displayed a yellowish-orange color scheme. Some Muni cars (numbers 1252 and in the 13xx series) retained Boston’s wood grain finish since they were originally constructed for Boston before being modified and transferred to San Francisco.
- Automation: Muni’s SLRVs incorporated cab signaling systems enabling automated operation through the Market Street subway with planned headways as short as 60 seconds—a capability absent in Boston’s fleet.
- Seating Capacity: San Francisco’s cars initially had cushioned seats that were replaced by hard plastic ones in 1985 due to vandalism concerns. Their seating capacity was 68 passengers compared to Boston’s original count of 52 seats, which was later reduced to 48 to enhance wheelchair accessibility.
Problems
One significant challenge was that the Boeing SLRV represented a "compromise" design intended to satisfy the distinct requirements of both Boston and San Francisco. Boston demanded a conventional streetcar, whereas San Francisco needed a specialized vehicle compatible with its Muni Metro subway system. The San Francisco units had to serve platforms at both street and elevated levels, which required the inclusion of adjustable steps. This design led to passenger flow complications because only the two center doors could be utilized within the subway, as the front end's curvature prevented alignment with high-level platforms. The narrow front profile was a Boston specification to enable navigation through the tight curves of its historic subway tunnels.
Professor Seymour Melman pointed out that Boeing Vertol’s defense industry background contributed to some of the difficulties encountered. Accustomed to clients with generous budgets and extensive maintenance capabilities, the company’s aerospace-focused design team lacked experience in rail transit vehicles and did not emphasize maintainability; certain parts even required removal using an acetylene torch.
Although Boeing promoted the SLRV as a fully integrated system, key components were sourced internationally—from Germany, Japan, and the United Kingdom—through subcontractors. This global supply chain introduced delivery unpredictability and eliminated opportunities for prototype testing. Consequently, MBTA and Muni effectively became beta testers of these vehicles. The absence of prototype evaluations resulted in insufficient spare parts availability upon delivery, forcing MBTA to cannibalize some cars for parts during initial operations.
Additional specific problems encompassed:
- Derailments occurring on sharp curves that caused damage to the articulation joint—a Boeing-designed connection intended to avoid royalty payments to foreign manufacturers.
- Electrical system failures including shorts and premature motor breakdowns. The federally mandated chopper control system, while technologically advanced, proved overly complicated for these transit agencies.
- Overengineered plug doors designed for high-platform boarding with automatic reopening if obstructed. Early versions were excessively sensitive, leading to repeated door cycling issues; subsequent redesigns simplified components but frequent electrical shorts persisted. By the mid-1990s, MBTA replaced these with bi-fold doors.
- Corrosion affecting car bodies primarily constructed from low-alloy steel, worsened by exposure to ocean air in Boston and San Francisco. Some units were retired within ten years due to rust problems aggravated by extended outdoor storage prior to assembly.
- A complex and labor-intensive blended braking system combining mechanical disk brakes with resistive electric brakes on powered trucks proved unreliable. MBTA eventually adopted purely mechanical pneumatic brakes on later Kinki Sharyo Type 7 vehicles.
- Original undercarriage-mounted air conditioning units drew in dirt; MBTA retrofitted 76 SLRVs with roof-mounted air conditioners.
- Failures of Acousta Flex composite resilient wheels occurred due to separation between elastomer layers and rims, resulting in wheel breakage and loss of electrical grounding. Production of these wheels ceased by 1981.
Replacements and retirement
Due to ongoing reliability concerns, transit agencies began pursuing replacement vehicles by the late 1980s. Despite some incremental improvements over time, persistent issues led both Boston and San Francisco to exclude Boeing SLRVs from their long-term fleet strategies. The Federal Transportation Administration notably shortened the expected service life of the SLRV from the typical 25 years for federally funded trolleys down to 15 years, facilitating earlier retirement and procurement of successor vehicles.
Though plagued by operational challenges, Gregory Thompson credits the SLRV with increasing public awareness of light rail transit and influencing subsequent light rail vehicle designs. The models that followed—the Kinki Sharyo Type 7 in Boston and Breda LRV2/3 in San Francisco—closely reflect many specifications and performance characteristics originally established by the SLRV.
| Boeing SLRV | Kinki Sharyo Type 7 (MBTA) | Breda LRV2/3 (Muni) | |
|---|---|---|---|
| Axles/ articulation |
6/1 | ||
| L×W×H[lower-alpha 1] | 73 ft × 8.85 ft × 11.5 ft 22.25 m × 2.70 m × 3.51 m |
74 ft × 8.67 ft × 11.83 ft 22.56 m × 2.64 m × 3.61 m |
75 ft × 9 ft × 11.5 ft 22.9 m × 2.7 m × 3.5 m |
| Floor height |
34 in 860 mm |
35 in 890 mm |
34 in 860 mm |
| Weight (empty) |
68,000 lb 31,000 kg |
85,000 lb 39,000 kg |
79,000 lb 36,000 kg |
| Motors | 2×160 kilowatts (210 hp) (1 motor/truck) | 4×100 kilowatts (130 hp) (2 motors/truck) | 4×97 kilowatts (130 hp) (2 motors/truck) |
| Capacity | 52/68 seated 219 (crush) |
50 seated | 60 seated |
| Minimum curve radius |
32 to 42 feet (9.8 to 12.8 m) | 42 feet (13 m) | 45 feet (14 m) |
| Acceleration | 4.1 feet per second squared (1.2 m/s2) | 1.25 metres per second squared (4.1 ft/s2) | 1.4 metres per second squared (4.6 ft/s2) |
| Deceleration | 5.1 feet per second squared (1.6 m/s2) | 1.56 metres per second squared (5.1 ft/s2) | 1.78 metres per second squared (5.8 ft/s2) |
- Notes
MBTA
Following the termination of their agreement with Boeing-Vertol, the MBTA undertook upgrades to various systems and refurbished cars sourced from cannibalized units for operational use. They notably "combined" damaged vehicles, such as merging components from cars 3454 and 3478 after a collision, which allowed one vehicle to resume service while the other was placed in storage. This hands-on repair experience facilitated the restoration of multiple cars, resulting in an active fleet of approximately 114 vehicles by the early 1980s.
From 1986 to 1988, MBTA introduced new Type 7 light rail vehicles supplied by Kinki Sharyo, a Japanese company making its entry into the North American market. Due to their enhanced reliability, these cars rapidly became the primary equipment on the Green Line, enabling the phase-out of the older PCC cars that had lingered because of Boeing's inconsistent performance. To make room for the Type 7s, MBTA began scrapping SLRVs starting in 1987, removing nineteen by 1988—mostly those held in dead storage or damaged from collisions. Kinki Sharyo later expanded its presence by providing LRVs to major metropolitan areas such as Dallas, San Jose, Phoenix, Seattle, and Los Angeles.
Boston also engaged Breda to supply Type 8 vehicles as a long-term replacement for Boeing models. Unlike the Type 7s, Type 8 cars incorporate a low-floor section that facilitates wheelchair access without requiring lifts or raised platforms, aligning with Americans with Disabilities Act standards. To sustain service levels before Type 8 delivery and to substitute Type 7 units lost to accidents, MBTA placed an order for an additional 20 Type 7 vehicles in 1997. Furthermore, Amerail completed a refurbishment program for 55 SLRVs between 1996 and 1997 aimed at extending their operational lifespan by three to five years; improvements included replacing unreliable plug doors with folding doors and installing roof-mounted air conditioning units. All SLRVs that were not rehabilitated were retired following June 1997.
While full retirement of SLRVs was anticipated by 2001, delays stemming from technical difficulties postponed Type 8 deployment and nearly jeopardized its contract. At that time, refurbished SLRVs still constituted about one-third of Green Line rolling stock. By August 2005, only 32 SLRVs remained active, with further retirements occurring by early 2006. The issues affecting Type 8 vehicles were resolved during 2006, allowing production and deliveries to resume. By early 2007, enough Type 8 units had entered service to completely replace the remaining Boeing cars. The last revenue run featuring Boeing vehicles took place on March 16, 2007, on the Riverside Line using cars numbered 3485 and 3499. By the end of that year, all Type 8 units had been fully assembled and delivered.
Muni
Muni initiated plans to replace its fleet of Boeing SLRVs in 1989 and subsequently signed a contract on December 4, 1991, with Italian manufacturer Breda Costruzioni Ferroviarie for an initial batch of 35 vehicles plus options for an additional 20.[1] San Francisco began phasing out Boeing SLRVs starting in 1995 as Breda LRV2 models were delivered. These Breda cars more closely aligned with Muni’s original Metro system vision established in the early 1970s.[2]
By late 2001, Muni had retired all Boeing SLRVs after the LRV2 fleet demonstrated superior reliability.[2]
Breda’s success in North American light rail was limited mainly to producing the P2550 model for Los Angeles alongside Muni’s vehicles. However, Breda achieved greater accomplishments in heavy rail transit by supplying rolling stock for Los Angeles (A650 series), three generations of Washington Metro trains, and Atlanta’s MARTA system.
Museum Preservation
Three Boeing SLRVs from the United States have been conserved within museum collections:
- Former Muni car 1213, now housed at the Oregon Electric Railway Museum since 2000
- Former Muni car 1258, acquired by the Western Railway Museum in 2002
- Former MBTA car 3424, preserved at the Seashore Trolley Museum beginning in 2009
Following their retirement, two additional vehicles remained on Muni premises—car 1320 stored at the Geneva Division and car 1264 located near Market and Duboce—both of which were dismantled in April 2016. Another ex-Muni unit, car 1271, has been repurposed as an office trailer within a Bay Area scrapyard.
The Seashore Trolley Museum evaluated the possibility of acquiring MBTA car 3444; however, due to its deteriorated state and missing parts, the acquisition was declined and the vehicle was scrapped in 2005. Instead, the museum opted to obtain the refurbished car 3424 from MBTA’s Riverside Yard in 2009.
Manchester, United Kingdom
During preparations for the 2002 Commonwealth Games hosted by Manchester, many event locations were served by the Manchester Metrolink, a light rail system inaugurated in 1992. To address capacity constraints, the Greater Manchester Passenger Transport Executive investigated purchasing surplus Boeing SLRVs from San Francisco’s Muni. Two cars were bought for $250 each as test units and shipped to England.
Car 1226 arrived in January 2002 and underwent safety inspection at Derby Litchurch Lane Works overseen by Her Majesty's Railway Inspectorate. Meanwhile, car 1326 was delivered to Metrolink’s Queens Road Depot. Additional Muni vehicles remained stored stateside awaiting potential sale.
Ultimately, adapting these cars for operation on UK railways proved financially impractical. The vehicle stationed in Manchester was scrapped following project termination, while the unit held at Derby was dismantled in 2016.
Service Vehicles
The MBTA maintained three retired SLRV work cars until their disposal in 2020:
- Rerailer unit 3417
- Track geometry measurement car 3448
- Maintenance of Way vehicle 3453
In 2000, ex-MBTA car 3541 was donated to the United States Army for training purposes. Additionally, cars numbered 3468, 3480, 3485, 3499, 3514, and 3520 were sold to the U.S. Government and relocated to the Transportation Technology Center in Pueblo, Colorado in 2010 for operational testing under real conditions.
See also
External links
- Boston's Green Line Crisis Overview of MBTA challenges with Boeing
- 1975 article on US SLRV rollout
- US DOT UT 50009: Light Rail Transit: State of the Art Review (1976)
- MBTA US SLRV specifications
- SOAC1 & SOAC2 at Seashore Trolley Museum
- State of the Art Cars
Advertisements
Department of Transportation evaluations
Cite error: <ref> tags exist for a group named "lower-alpha", but no corresponding <references group="lower-alpha"/> tag was found
- ↑ Template:Muni Chronology
- ↑ 2.0 2.1 Cite error: Invalid
<ref>tag; no text was provided for refs namedBoeingsForScrapOrSale!