Jump to content

Upper American River Project

From Alfawiki
Upper American River Project
Company typeHydroelectric facility
IndustryEnergy
Founded1957
FounderSacramento Municipal Utility District (SMUD)
Headquarters
Sacramento
,
United States
Area served
Sacramento, California
ProductsElectricity
OwnerSacramento Municipal Utility District (SMUD)
ParentSacramento Municipal Utility District (SMUD)

The Upper American River Project (UARP) is a hydroelectric facility managed by the Sacramento Municipal Utility District (SMUD), located in Sacramento, California, United States.

This system includes a total of 11 dams and eight power generation stations, utilizing the upper branches of the American River within the Sierra Nevada mountain range to produce electricity. The project’s installed capacity surpasses 687 MW, generating approximately 1.8 billion KWh annually, which accounts for about 20% of Sacramento’s electricity consumption.

Water resources for the project mainly come from the South Fork American River and its feeder streams, supplemented by flows from the Rubicon River, a tributary feeding into the Middle Fork American River. The dams collectively provide substantial water storage capacity and create a total hydraulic head measured between the highest reservoir and the lowest powerhouse discharge.

History

The Federal Power Commission authorized the project on August 28, 1957, with SMUD initiating construction in September of the same year. The first operational unit was Jaybird Powerhouse, which began generating electricity on May 1, 1961. Most infrastructure was completed by 1967; however, Loon Lake Powerhouse was finalized in 1971, followed by Jones Fork Powerhouse in 1985. The construction of dams on portions of the South Fork American River, Rubicon River, and their tributaries has resulted in environmental consequences such as obstructed fish migration routes.

Overview

Water diverted from the Rubicon River is stored in Loon Lake, then discharged through Loon Lake Powerhouse into Gerle Creek. From there, it is redirected into Silver Creek—a tributary of the South Fork American River—passing through Robbs Peak Powerhouse before reaching Union Valley Reservoir, which serves as the main reservoir for the project. Additionally, water from Ice House Reservoir flows into Union Valley via Jones Fork Powerhouse.

From Union Valley Reservoir, water proceeds through Union Valley Powerhouse to Junction Reservoir and then through Jaybird Powerhouse into Camino Reservoir on Silver Creek. The flow continues via a penstock to Camino Powerhouse situated above Slab Creek Reservoir on the South Fork American River. Subsequently, it travels through a tunnel to White Rock Powerhouse located at Chili Bar Reservoir on the South Fork.

List of facilities

Dams and reservoirs
Dam Stream Capacity
acre.ft dam3
Brush Creek Brush Creek 1,530 1,890
Buck Island† Unnamed 1,070 1,320
Camino Silver Creek 825 1,018
Gerle Creek Gerle Creek 5,231 6,452
Ice House South Fork Silver Creek 45,960 56,690
Junction Silver Creek 3,250 4,010
Slab Creek South Fork American River 16,600 20,500
Loon Lake Gerle Creek 76,200 94,000
Robbs Peak† South Fork Rubicon River 30 37
Rubicon Rubicon River 1,450 1,790
Union Valley Silver Creek 277,290 342,030
Total 429,436 529,702

† denotes a diversion dam

Power plants
Name Capacity (MW) Hydraulic head Annual generation
( KWh, 2002–2012)
ft m

Camino |150.0 |style="text-align:right;"|1,065

325 |356,187,000

Jaybird |144.0 |style="text-align:right;"|1,535

468 |532,315,000

Jones Fork |11.5 |style="text-align:right;"|580

180 |20,677,000

Loon Lake |82.0 |style="text-align:right;"|1,179

359 |97,891,000

Robbs Peak |29.0 |style="text-align:right;"|361

110 |48,897,000

Slab Creek |0.4 |style="text-align:right;"|250

76 |1,612,000

Union Valley |46.7 |style="text-align:right;"|420

130 |123,393,000

White Rock |224.0 |Template:Convert 867 ft m disp=table 529,824,000

Total 687.6 1,710,794,000