China Railway CRH5
| Company type | Electric multiple unit train |
|---|---|
| Industry | Railway transportation |
| Predecessor | China Star, DJF3 |
| Founded | 2007 |
| Headquarters | China |
Area served | Northern regions of China |
Key people | Alstom, Changchun Railway Vehicles Co., Ltd. |
| Products | High-speed trains (CRH5A, CRH5E, CRH5G/H variants) |
| Parent | China Railway High-speed |
The CRH5 Hexie () is a high-speed electric multiple unit train operated by China Railway High-speed throughout northern regions of China. This model, derived from Italy’s ETR-600 New Pendolino, is a non-tilting design developed through technology transfer agreements with Chinese manufacturers.
Capable of reaching speeds up to , the CRH5 operates on both major high-speed and conventional rail corridors, playing a vital role in enhancing regional connectivity and increasing transport capacity. Production of 140 trainsets (totaling 1120 cars) began in 2007 as a collaborative effort between Alstom and Changchun Railway Vehicles Co., Ltd., replacing older rolling stock such as the China Star and DJF3 models.
The CRH5 is engineered with a focus on dependability and operational efficiency, utilizing Alstom’s IGBT VVVF inverter traction system that delivers a power output of . Configured as an eight-car set, it accommodates up to 622 fixed seats, maximizing passenger throughput on heavily trafficked northern routes. It runs on China’s standard 25 kV AC electrification system and incorporates regenerative braking alongside electronically controlled pneumatic brakes to optimize energy use and ensure safety.
CRH5A
In 2004, the Ministry of Railway of China awarded contracts to Alstom and CNR Changchun Railway Vehicles for the production of 60 trainsets with a top speed of , designated as CRH5A. These orders were placed alongside those for the Regina-based CRH1A and the Shinkansen-derived CRH2A. Subsequent procurement included 30 additional sets in 2009, 20 in 2010, and another 30 in 2011, completing the fleet serving northern and eastern China.
The initial three trainsets were manufactured by Alstom in Italy; six more arrived as complete knock-down kits assembled by CNR Changchun. The remaining 51 units were produced domestically under technology transfer agreements from Alstom. The first CRH5-001A set left Savigliano, Italy in December 2006 and reached Dalian by January 2007. The first unit assembled entirely in China (CRH5-010A) was delivered in April 2007.
CRH5A trains commenced operation on April 18, 2007, coinciding with the sixth national railway speed-up initiative on the Beijing-Harbin route. Service later expanded to include lines such as Jinan-Qingdao and Shijiazhuang-Taiyuan high-speed railways.
Each original eight-car formation comprised one first-class car (ZY), six second-class cars (ZE), and one combined second-class/dining car (ZEC). Later versions adjusted this layout to include two first-class cars alongside six second-class cars.
Initial deployment encountered some reliability issues due to the integration of new technologies and limited pre-delivery testing.
CRH5E
The CRH5E variant consists of cold-resistant high-speed sleeper trains equipped with traditional railway sleeping berths (couchette car), designed specifically for overnight journeys in severe climatic conditions.
CRH5G/H
The CRH5G represents a specialized adaptation engineered for resistance against cold temperatures as well as sand and windstorms. Manufactured by CRRC Changchun Railway Vehicles, this model serves the Baoji–Lanzhou high-speed railway, providing enhanced operational reliability under extreme environmental conditions.
CIT001
On April 2, 2007, the China Academy of Railway Sciences launched a high-speed test train based on the CRH5 platform, designated as the Code Zero Comprehensive Testing Train (CIT001). This train, fitted with state-of-the-art monitoring equipment for track condition, wheel-rail interaction, overhead catenary, communication, and signaling systems, commenced its trial runs on July 1, 2007.
Formation
Power Car Designations
- M – Motorized car
- T – Non-powered trailer car
- C – Cab car with driver controls
- P – Pantograph-equipped car
Coach Classifications
- ZY – First Class Coach
- ZE – Second Class Coach
- ZEC – Second Class Coach with Buffet Section
- WR – Soft Sleeper Coach
- WRC – Soft Sleeper Coach with Buffet Section
CRH5A / CRH5G
| Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|---|---|---|---|---|---|---|---|---|
| TypeTemplate:Ref | ZE | ZEC | ZE | ZY | ||||
| TypeTemplate:Ref | ZY | ZE | ZEC | ZE | ZY | |||
| TypeTemplate:Ref | ZY | ZE | ZEC | ZE | ||||
| Power Configuration | M | TP | M | T | TP | M | MC | |||||||
| Power Units | Unit 1 | Unit 2 | ||||||
| CapacityTemplate:Ref | colspan="4" | 93 | 42 | 74 | 60 | |||||||
| CapacityTemplate:Ref | colspan="4" | 90 | 40 | 74 | 56 | |||||||
| CapacityTemplate:Ref | colspan="2" | 90 | 77 | 63 | colspan="2" | 90 | 65 | |||||||
- Trains numbered CRH5A-5001 to CRH5A-5012 and CRH5A-5043 to CRH5A-5053
- Trains numbered CRH5A-5013 to CRH5A-5042 and CRH5A-5054 to CRH5A-5140
- Trains numbered CRH5G-5141 to CRH5G-5200 and CRH5G-5206 to CRH5G-5229
CRH5E
| Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | ZE | WR | WRC | WR | ZE | |||||||||||
| Power Configuration | M | Tp | M | T | Tp | colspan=4 | M | Tp | T | M | Tp | M | Mc | |||||||||||||||
| Power Units | Unit 1 | Unit 2 | Unit 3 | Unit 4 | ||||||||||||
- Train numbers CRH5E-5201 and CRH5E-5202
Distribution
By September 2017, a total of 227 units of the CRH5 series had been manufactured, inclusive of the No. 0 high-speed comprehensive inspection train.
| Operator | Quantity | Serial Numbers | Depot | Remarks | |
|---|---|---|---|---|---|
| CRH5A | |||||
| China Railway Beijing Group | 13 | 5018、5021、5029、5036、5037、5042、5073、5079、5103、5116、5117、5134、5135 | Beijing | ||
| 8 | 5057、5061、5063、5074、5077、5115、5119、5120 | Shijiazhuang | |||
| 5 | 5028、5076、5118、5121、5136 | Caozhuang | |||
| China Railway Lanzhou Group | 2 | 5078、5104 | Yinchuan | ||
| China Railway Wuhan Group | 17 | 5078、5091、5096、5097、5100~5101、5104~5110、5123~5127、5133 | Hankou | ||
| China Railway Shenyang Group | 19 | 5015、5016、5024、5026、5035、5038、5039、5082、5089、5092~5094、5102、5111、5113、5114、5137~5139 | Shenyang North | ||
| 5 | 5014、5017、5081、5088、5112 | Tongliao | |||
| 9 | 5001~5008、5010 | Dalian | |||
| China Railway Harbin Group | 26 | 5019~5023,5030,5033,5041,5043,5056,5062,5064,5065,5067~5072,5090,5099,5128~5132,5140 | Harbin West | ||
| China Railway Taiyuan Group | 20 | 5025,5027,5031,5032,5034,5040,5058~5060,5066,5075,5080,5083~5087,5095,5098,5122 | Taiyuan | ||
| China Railway Hohhot Group | 16 | 5009,5011~5013,5044~5055 | Hohhot | ||
| CRH5G | |||||
| China Railway Ürümqi Group | 12 | 5183~5185,5195~5198,5200,5206,5207,5212,5214 | Ürümqi | ||
| China Railway Lanzhou Group | 24 | 5147,5152,5178,5191~5194,5199,5208,5210,5215,5216,5218~5229 | Lanzhou West | Units 5218~5229 are upgraded CRH5G models | |
| 6 | 5148,5151,5177,5199,5209,5213 | Yinchuan | |||
| China Railway Qingzang Group | 7 | 5175,5176,5179~5182,5211 | Xining | ||
| China Railway Harbin Group | 12 | 5143~5146,5153~5156,5158,5159,5186,5187 | Harbin West | ||
| China Railway Shenyang Group | 23 | 5141,5142,5149,5150,5157,5160~5174,5188~5190 | Changchun | ||
| CRH5E | |||||
| China Railway Ürümqi Group | 2 | 5201・5202 | Ürümqi | Sleeper EMUs initially tested at China Railway Test Center; from January 2019 operate on Beijing-Qingdao North D335/336 route; currently assigned as daytime sleeper trains in Ürümqi. | |
| CRH5J (formerly CIT001) | |||||
| China Railway | 1 | 0501 | Designated as No. 0 high-speed comprehensive inspection train (featuring yellow livery) | ||
See also
- China Railway CRH3A
- China Railway CJ1
- China Railway CR300BF
- China Railway CIT trains
- List of high-speed trains
- New Pendolino
- Avant class 114
- Pendolino
References
- Electric multiple units of China
- Changchun Railway Vehicles
- Alstom high-speed trains
- Passenger trains running at least at 200 km/h in commercial operations
- CRRC multiple units
- High-speed trains of China
- 25 kV AC multiple units
- Alstom multiple units
- Passenger trains running at least at 250 km/h in commercial operations
- Train-related introductions in 2007