Jump to content

Deutsche Bank Building

From Alfawiki
Deutsche Bank Building
Company typeOffice skyscraper
IndustryCommercial real estate
PredecessorBankers Trust Plaza
Founded1974
Defunct2011
FateDemolished
Headquarters
Manhattan, New York City
,
United States
Area served
Lower Manhattan
Key people
Deutsche Bank (owner after 1998 acquisition)
ProductsOffice space

The Deutsche Bank Building—previously known as Bankers Trust Plaza—was a 39-story office skyscraper located at 130 Liberty Street in Manhattan, New York City, directly adjacent to the World Trade Center site. Completed in 1974, it ceased operations following the September 11 attacks in 2001 due to hazardous dust contamination after the South Tower's collapse. The structure was designed by Shreve, Lamb & Harmon, the same architectural firm behind the Empire State Building. In 1998, Deutsche Bank acquired the building through its takeover of Bankers Trust.

This tower was a prominent feature of Lower Manhattan’s skyline until its demolition occurred between 2007 and 2011. The location is slated for redevelopment as part of the 5 World Trade Center project, which will extend the footprint of the existing World Trade Center complex beyond its original perimeter.

September 11th

When the South Tower collapsed during the September 11 attacks, it inflicted a 24-story vertical breach on the building’s exterior, destroyed a critical load-bearing column, and eliminated approximately 158,000 square feet of usable floor area. Additionally, an elevated plaza at the base was demolished. Tragically, one individual lost their life inside the structure during these events.

Plans

For months following the attacks, steel and concrete debris jutted from the building. Given the severe contamination present, Deutsche Bank opted to demolish the entire 39-story structure. Safety netting was erected to prevent collapse throughout cleanup operations. While insurers categorized the damage as reparable rather than total loss, ownership judged restoration impractical. Cleanup efforts were postponed for over two years as conditions deteriorated.

Human remains were discovered on the roof in September 2005 and again in March 2006, prompting demands for extended forensic investigations. Between April 7 and April 14, 2006, more than 700 bone fragments were recovered from gravel ballast on the roof.

Demolition expenses escalated to $75 million under contractor Bovis Lend Lease, largely due to hazardous substances such as asbestos, dioxins, lead, silica, quartz, polycyclic aromatic hydrocarbons, chromium, and manganese detected within the building materials.

Demolition

In 2004, a settlement resolved issues concerning insurance claims and ownership; subsequently, the Lower Manhattan Development Corporation took possession of the site and initiated demolition efforts. On December 7, 2006, announcements confirmed that dismantling would commence despite concerns from local residents about toxic dust related to debris from the Twin Towers.

Deconstruction began in March 2007 but was suspended on May 17 after a 22-foot pipe dropped from a height of 35 stories onto "The Ten House" firehouse roof, injuring two firefighters.

On August 18, 2007, a seven-alarm blaze broke out on the seventeenth floor due to workers violating safety protocols by smoking onsite. At that stage, crews were removing one floor per week alongside asbestos abatement activities. The fire spread vertically across ten floors and was exacerbated by polyethylene sheeting installed to contain asbestos dust but which trapped smoke inside. Firefighting efforts were severely impeded by a lack of a standpipe system because water pipes had been cut off. Despite regulations requiring biweekly inspections, no inspection had taken place since March. The incident resulted in two firefighter fatalities and injuries to 115 personnel, including 46 with serious wounds. Following this tragedy, demolition efforts accelerated significantly.

In 2008, three construction supervisors and demolition subcontractor John Galt Corporation faced indictments from the Manhattan District Attorney. A city-issued stop-work order was rescinded in April that year, allowing cleanup operations to resume in May. The submitted fire emergency plan faced criticism for inadequate evacuation measures.

Initial projections aimed to complete dismantling by late 2008; however, this deadline was extended to late 2010. Work recommenced in October 2009 and concluded on January 20, 2011 with crane removal. The final stage—removal of the first floor and foundation—was finalized on February 28, 2011, marking complete demolition of the building.

Future Developments

The Port Authority of New York and New Jersey is responsible for managing the site's ongoing projects, which encompass the construction of the Vehicular Security Center and Liberty Park. Meanwhile, plans for 5 World Trade Center are still under consideration.

5 World Trade Center

On June 14, 2007, then-Mayor Bloomberg and Governor Eliot Spitzer revealed that JPMorgan Chase had secured the contract to develop 130 Liberty Street, intended to replace the Deutsche Bank Building. However, after JPMorgan Chase acquired Bear Stearns in 2008, their strategy changed as they planned to move into Bear Stearns' former offices at 383 Madison Avenue. Should JPMorgan Chase decide not to proceed with development at this location, the property is expected to be repurposed for residential or hotel use, consistent with Bloomberg’s initial vision. Local community representatives generally support converting the site into hotel or residential facilities, while outgoing deputy mayor Robert Lieber advocates for an office skyscraper.

Church and Vehicular Security Center

On October 14, 2011, an agreement was reached between the Port Authority and St. Nicholas Greek Orthodox Church to construct a 4,100-square-foot church along with an interfaith bereavement center at 130 Liberty Street. The original church, established in 1916 and destroyed during the September 11 attacks, remained incomplete as of 2020. Construction efforts resumed on August 3, 2020, aiming for completion by the 20th anniversary of the attacks in 2021. The church was consecrated on July 4, 2022, with final construction finishing in December of that year.

The dismantling delays of the Deutsche Bank Building caused setbacks in completing the Vehicular Security Center and increased reconstruction expenses by about $100 million. Originally slated to open in 2013, the center eventually began operations in June 2016 after Liberty Park was completed atop the garage structure.

See also

External links