The Fall River/New Bedford Line—previously known as the Middleborough/Lakeville Line—is an MBTA Commuter Rail route that serves southeastern Massachusetts. It extends southward from Boston to Taunton, where it divides into two branches reaching Fall River and New Bedford. Along the shared portion, there are 10 intermediate stops, with each branch containing one additional station. With a length of up to , it ranks as the second-longest line within the MBTA system.
This corridor closely traces the path of the historic Fall River Railroad, which opened between Fall River and South Braintree through Middleborough during 1845–46. At South Braintree, it connected with the Old Colony Railroad, later merging into the Old Colony and Fall River Railroad in 1854. Although the Dighton and Somerset Railroad took over as the primary Boston–Fall River connection in 1866, this line remained essential for local commuter traffic and travel to Cape Cod. Subsequent consolidations brought it under the control of the Old Colony Railroad in 1872 and eventually the New York, New Haven and Hartford Railroad by 1893.
Commuter ridership peaked in the early 1900s but began to diminish during the 1910s; service between Fall River and Middleborough was discontinued in 1931. After extended attempts to terminate Old Colony Division operations, the New Haven Railroad ended service in 1959. The Massachusetts Bay Transportation Authority initiated plans for restoration during the 1970s, which led to construction commencing in 1993 and the launch of service on what was then called the Middleborough/Lakeville Line in 1997. Seasonal tourist service operated by the CapeFlyer started in 2013. In 2025, as part of phase one of the South Coast Rail project, the line was extended and rebranded. Proposals remain to extend service further from Middleborough toward or .
Operation
The northern portion aligns with the Middleborough Main Line, running roughly north-south from Boston to Middleborough. Between South Station and Braintree—passing through Boston and Quincy—the route is shared with both the Kingston Line and Greenbush Line. Continuing southward, it serves communities including Randolph, Holbrook, Avon, Brockton, West Bridgewater, East Bridgewater, and Bridgewater. Prominent stations along this stretch include , , , , , , , and .
At Pilgrim Junction just north of Middleborough station, located in downtown Middleborough, the line veers westward. It follows the Middleboro Secondary track westward to Cotley Junction situated in southern Taunton, then proceeds along the New Bedford Main Line southeast toward Myricks, passing through East Taunton station. From Myricks, two branches diverge: the New Bedford Branch continues southeast to reach New Bedford station via Church Street station, while the Fall River Branch heads southwest along the Fall River Secondary line to serve Fall River station through Freetown station.
MBTA Commuter Rail services utilize push-pull trains powered by diesel locomotives. Operational speeds can reach up to south of Braintree and up to north of that point. The majority of this line is single track equipped with passing sidings; however, double-track segments exist within Boston, Quincy, Braintree, Brockton, and between Cotley Junction and Myricks Junction. Layover facilities are positioned in Fall River, New Bedford, and Middleborough. Every station is outfitted with fully accessible high-level platforms spanning their entire length.
As of March 2025, weekday service between East Taunton and Boston consists of 16 round trips while weekends offer 13 round trips. Service is approximately evenly divided between trains serving Fall River and those serving New Bedford branches. Most weekday trains traveling to Boston operate shuttles on the alternate branch with a convenient cross-platform transfer at East Taunton. Typical nonstop travel times fall between 92 and 98 minutes. Additionally, during summer weekends—from Memorial Day through Labor Day—the seasonal CapeFlyer provides one daily round trip between Boston and Hyannis on Friday evenings, Saturdays, and Sundays. This service uses this line north of Middleborough with stops at Braintree and Brockton.
Old Colony Railroad
The Fall River Railroad was formed in March 1845 through the consolidation of three smaller rail lines. Its construction was completed in stages between June 1845 and December 1846, establishing a route connecting Fall River to South Braintree via Middleborough.[1][2] At South Braintree, it linked with the Old Colony Railroad, which had initiated service between Boston and Plymouth in November 1845.[3] By 1847, the line was extended to Fall River Wharf, facilitating the launch of the Fall River Line rail–steamboat connection between Boston and New York.[2] The Cape Cod Railroad expanded from Middleborough to Sandwich in 1848 and further to Hyannis in 1854.[2] In 1854, the Old Colony and Fall River railroads merged to create the Old Colony and Fall River Railroad, permitting commuting into Boston from locations as far south as Bridgewater. During the late 1850s and early 1860s, North Bridgewater (later known as Brockton) functioned as a terminal for short-turn train services.[3]
The Dighton and Somerset Railroad, under the ownership of Old Colony and Newport (which succeeded Old Colony and Fall River), commenced operations in September 1866. This line connected with the Fall River route at Braintree Highlands and Somerset Junction, offering a more direct Boston–Fall River path via Taunton. This new alignment became the main Boston–Fall River corridor, although the original route continued to handle substantial Cape Cod traffic.[2] In 1872, the Old Colony and Newport Railroad merged with the Cape Cod Railroad to form the Old Colony Railroad. In southern Brockton, a turnback facility was established during the early 1870s.[3]
Due to increased passenger and freight volumes, the Old Colony undertook double-tracking of critical sections throughout the 1880s and 1890s.[3] The double track was extended progressively southward from South Braintree to Randolph in 1882, Campello in 1883, Bridgewater in 1884, and Middleborough by 1885.[4] By the mid-1880s, commuter timetables were available from Middleborough.[3] The West Bridgewater Branch, which connected with the Dighton and Somerset line, was finalized in 1888.[2] Double tracking extended from Middleborough to by 1893.[5] Commuter services originating from Cape Cod began operating in 1894.[3]
New Haven Railroad
In 1893, the New York, New Haven and Hartford Railroad took over the Old Colony through a lease agreement. Between 1894 and 1897, an extensive project raised the tracks running through downtown Brockton to remove grade-level crossings. The Middleborough line experienced its highest usage from 1898 to 1914. By 1898, daily inbound trains to Boston included six originating from Cape Cod, three from Fall River, six from Middleborough, seven from Campello, and one arriving via the West Bridgewater Branch. Additionally, three trains traveled from to Boston by heading south through Brockton and utilizing various branch lines. Many trains from Old Colony Division branches operated on the mainline north of Braintree, frequently splitting or joining there.
After 1900, the central segment of the Fall River Railroad between Middleborough and Myricks saw a decline in significance, although commuter service from Fall River resumed sporadically starting in 1915. During World War I, freight traffic took precedence causing a reduction in passenger services, with commuter trains from Cape Cod becoming scarce after 1919. By 1924, inbound train service consisted of five from Cape Cod, one from Fall River, five from Middleborough, three from Bridgewater, eight from Campello, and one from North Easton via the West Bridgewater Branch—the latter route discontinued in 1925. Service to Fall River via Middleborough ended in 1931.
Abandonment
The New Haven Railroad entered bankruptcy proceedings in 1935, leading to a reorganization that lasted twelve years. The Old Colony lease represented a major financial burden; although the New Haven terminated it in 1936, it was required to continue operating the division. In the contentious 88 stations case, on July 17, 1938, New Haven closed 88 stations throughout Massachusetts, including six located on the Middleboro line and between Middleboro and the Cape Cod Canal.
By May 1939, the railroad proposed discontinuing all passenger operations within the "Boston Group," which encompassed vital routes such as Greenbush, Plymouth, and Middleborough. A revised plan issued in September preserved Boston–Braintree service along with limited rush-hour trains to Campello, Whitman, and Hingham. Following negotiations, a compromise timetable commenced on March 31, 1940, reducing service by half but preventing line closures. This schedule operated on a single track south of Bridgewater as the second track was removed over a two-year period.
On February 18, 1941, the Interstate Commerce Commission rejected the abandonment request for the Boston Group lines, compelling continued operation of Old Colony services. While World War II temporarily increased ridership and freight traffic, financial losses resumed after the war. Severe reductions in March 1949 left the Middleboro line with minimal service: two inbound trains from Cape Cod and three from Middleborough.
During Frederic C. Dumaine Jr.’s tenure as president (1951–1954), New Haven enhanced passenger offerings by deploying new Budd Rail Diesel Cars aimed at lowering expenses. By April 1954, daily inbound trains included three from Cape Cod, four from Middleborough, and six from Brockton. However, under Patrick B. McGinnis’s leadership beginning in 1954, maintenance was deferred and expansion plans canceled; the railroad renewed efforts to abandon all Old Colony operations.
A temporary subsidy provided by the state in 1958 maintained service on Greenbush, Plymouth, Middleborough, and Cape Cod lines for one year during construction of the Southeast Expressway. Service ceased on June 30, 1959 when funding ended; bus operators such as Eastern Massachusetts Street Railway and Plymouth and Brockton Street Railway expanded commuter transportation across the South Shore.
1960s and 1970s
At the start of 1960, officials from the state and Cape Cod reached an agreement with the New Haven Railroad to provide seasonal summer train service connecting Boston and New York to Cape Cod. The New York-based trains, known as the Day Cape Codder and Neptune, operated as scheduled. However, a fire on July 22–23, 1960 destroyed wooden trestles on the drawbridge spanning the Neponset River between Boston and Quincy. Although the New Haven Railroad received insurance compensation, it opted not to reconstruct the bridge and instead rerouted freight traffic through Middleborough. Passenger transfers were arranged at , and in 1961, Boston–Cape Cod trains ran via Stoughton. The New York-originating trains continued until 1964, while freight operations persisted along the Middleboro route.
The Massachusetts Bay Transportation Authority (MBTA) was founded in August 1964 with a mission to extend urban transit into suburban areas, subsidize commuter rail services, and substitute parts of them with rapid transit expansions. Its inaugural initiative was a Red Line extension following the Old Colony Railroad corridor to Braintree. Though earlier proposals for this extension had been rejected by voters in Quincy and Braintree in 1948, support grew after the discontinuation of Old Colony service. In November 1965, the MBTA acquired the Old Colony main line stretching from Boston to South Braintree from the New Haven Railroad. By 1966, plans envisioned extending this line further to either Braintree Highlands or Holbrook, including a branch toward Weymouth or Hingham. The Red Line reached Quincy Center station in September 1971 and was extended to Braintree by March 1980. Alongside the new rapid transit tracks within Boston, a freight track was maintained with reserved right-of-way through Quincy for future freight use.
At the close of 1968, the New Haven Railroad merged into Penn Central. Following widespread opposition to urban freeway projects, Massachusetts Governor Francis Sargent imposed a halt on new highway construction inside Route 128 in 1970, which led to cancellation of the Southwest Expressway plan. As a result, the Southeast Expressway remained Boston’s only southern highway access. In January 1973, the MBTA purchased most of Penn Central's suburban lines around Boston, including the Middleboro line extending southward to Campello.
Restoration
A state report published in 1974 evaluated potential rail service restoration to Hyannis and Falmouth on Cape Cod, estimating construction expenses between $13.6 million and $23 million, along with $9.2 million for acquiring track rights and $2.5 million to $6.8 million for rolling stock. To promote these restoration efforts, a special train journeyed from Braintree to Middleborough on October 15, 1979. An MBTA study conducted in 1984 confirmed that resuming commuter rail operations on former Old Colony routes was feasible. Between 1984 and 1988, passenger service operated by the Cape Cod and Hyannis Railroad ran from Braintree to Cape Cod with five intermediate stops, serving as an early model for future commuter rail restoration.
In May 1990, a Draft Environmental Impact Statement (DEIS) was released covering lines serving Middleborough, Plymouth, and Greenbush. As part of a legal settlement addressing vehicle emissions related to the Central Artery/Tunnel Project (Big Dig), Massachusetts committed in 1991 to transit initiatives including an Old Colony Commuter Rail Line Extension slated for completion by 1996. The Final Environmental Impact Statement was issued in 1992. Unlike other lines which reused existing tracks, the Greenbush Line involved reopening abandoned corridors and encountered greater public controversy; it ultimately commenced service in 2007. Two planned stations—Westdale in West Bridgewater and Middleborough/Route 44—were eliminated during project development.
Groundbreaking for this $560 million project took place in 1993 with anticipated service launch by late 1996. Debates arose over adding stations on the shared mainline between Braintree and Boston; initially only Braintree was included. In September 1995, Governor Bill Weld announced plans for a platform at Quincy Center; both stations received approval later that year. In November 1996, JFK/UMass station was incorporated as well. Limited weekday operations began on September 29, 1997 with four daily round trips each on Middleborough/Lakeville and Plymouth/Kingston branches. Full service commenced November 30, 1997 featuring twelve weekday round trips for Middleborough/Lakeville and seven weekend trips. Starting April 30, 2001, weekend trains and select weekday services began stopping at JFK/UMass station.
Service since 1997
Starting in 2007, the Old Colony Lines experienced failures in their concrete ties due to defects originating from manufacturing. These issues escalated over the subsequent two winters, resulting in interruptions to service and imposed speed limitations. In response, the MBTA initiated a $91.5 million initiative in 2010 aimed at replacing 150,000 faulty ties from a 1990s production batch of 600,000 with wooden alternatives. Replacement efforts commenced that same year in Bridgewater and Middleborough. From March to June 2011, midday services on the Middleborough/Lakeville Line were substituted by buses, with weekend bus replacements occurring sporadically until April 2012. This replacement project was completed by May 2012.
On May 24, 2013, the MBTA launched the CapeFlyer, a seasonal rail service connecting Boston and Hyannis via the Middleborough Main Line and Cape Main Line. Initially offering one round trip daily from Friday evenings through Sundays during summer months, the service was extended through Columbus Day weekend. By 2015, Friday departures utilized dedicated trainsets distinct from those serving the regular Middleborough/Lakeville Line.
The COVID-19 pandemic caused significant cutbacks to Commuter Rail schedules between March and June 2020. In November 2020, consistent midday service on the Middleborough/Lakeville Line resumed with trains running every 60 to 70 minutes; however, pilot programs for late-night service were discontinued. Reduced schedules were reinstated from December 2020 through April 2021. By October 2022, ridership levels had rebounded to approximately 77% of those seen before the pandemic.
South Coast Rail
The concept of restoring commuter rail access to New Bedford and Fall River (South Coast Rail) emerged in the 1980s, with three potential routes under consideration, including options via the Middleborough Main Line and Middleborough Secondary. By 1988, MBTA plans favored a route passing through . A feasibility study conducted in 1995 revealed that limited single-track capacity between Boston and Braintree could accommodate service to either Fall River or New Bedford but not both simultaneously. Planning efforts for the Stoughton route continued until being halted in 2003; they later resumed with studies from 2009 through 2013 supporting the Stoughton alignment.
In June 2016, project costs were updated to $3.42 billion with an anticipated completion date around 2030, prompting exploration of an interim service utilizing the Middleborough route. Some stakeholders opposed this interim plan due to concerns about reduced service at Middleborough/Lakeville station and potential conflicts with other lines. In March 2017, a revised strategy was announced: Phase 1 would follow the Middleborough corridor, targeting a 2024 opening at a cost of $1.1 billion and providing service to both Fall River and New Bedford; Phase 2 would implement the Stoughton route featuring electrification, scheduled for a 2029 launch. Local officials voiced apprehension regarding potential abandonment or modification of Middleborough/Lakeville station given its role in stimulating transit-oriented development.
By June 2017, the Phase 1 completion timeline was accelerated to 2022. The January 2018 draft supplemental environmental impact report evaluated three alternatives for Middleborough; ultimately selecting a new station combined with a bus shuttle to maximize operational flexibility and reduce travel times.
Two principal construction contracts were awarded in May and August of 2020 with an initial target for service commencement by late 2023. By mid-2022, the project had reached approximately half completion. However, revenue service was postponed to mid-2024 as of September 2023. By April 2024, a midyear launch appeared unlikely without an updated schedule release. In June 2024, the MBTA announced an additional delay pushing opening to May 2025. Official service began on March 24, 2025, rebranded as the Fall River/New Bedford Line, featuring an increased frequency of sixteen weekday round trips and thirteen weekend trips.
Following its inauguration, the new service encountered operational challenges including crew shortages that led to weekend cancellations. In April 2025, the MBTA proactively substituted some weekend trips with bus services. Early on-time performance indicated roughly one-third of trains arrived late compared to about ten percent systemwide; performance improved over time but remained below average through May. The MBTA attributed these issues to initial startup difficulties and coordination complexities on predominantly single-track segments. On July 21, 2025, schedule revisions were implemented aimed at enhancing reliability by eliminating off-peak and weekend stops at JFK/UMass station, reducing two late-night shuttle trains, and extending running times.
Cape Cod service initiatives
In 2007, the Boston Region Metropolitan Planning Organization published a study assessing the feasibility of extending commuter rail service to Buzzards Bay, located in Bourne, Massachusetts just north of the Cape Cod Canal. Suggested stops along the route included Rock Village in southern Middleborough, County Road at the Rochester/Wareham boundary, and downtown Wareham. The launch of the CapeFLYER sparked renewed enthusiasm for expanding the Middleborough/Lakeville Line to reach Buzzards Bay. By 2013, both the Wareham Chamber of Commerce and Buzzards Bay selectmen endorsed this extension, citing the CapeFLYER’s positive reception.
Between 2014 and 2015, MassDOT together with the Cape Cod Commission evaluated potential service options, projecting daily ridership figures ranging from 800 to 875 if all Middleborough/Lakeville trains were extended to Buzzards Bay without additional stops. Although Bourne joined the MBTA district in 2015 and began paying assessments in 2016, no service was guaranteed at that time. MassDOT intended to launch a pilot shuttle service connecting Bourne and Middleborough/Lakeville, to be operated by Massachusetts Coastal Railroad in late 2015; however, this plan was declined by the MBTA Fiscal Management and Control Board in April 2016.
As part of the South Coast Rail development, Middleborough station was designed with provisions for a future shuttle platform. A 2021 MassDOT feasibility report estimated that a shuttle running between Middleborough and Buzzards Bay with seven daily round trips could generate approximately 1,710 daily boardings. Meanwhile, service linking Middleborough and Bourne with ten round trips—including two off-peak trips to Boston—was projected to attract around 2,540 daily riders. Extending service to Hyannis was excluded due to extensive track and signaling improvements required.
Stations
2 3 Randolph 15.0 (24.1) Disabled access| Fare zone | Location | Miles (km) | Station | Connections and notes | ||
|---|---|---|---|---|---|---|
| 1A | Boston | 0.0 (0.0) | Disabled access
|
Template:Ric: Template:Lnl, Template:Lnl, Template:Lnl Template:Ric: Fairmount Line, Framingham/Worcester Line, Franklin/Foxboro Line, Greenbush Line, Kingston Line, Needham Line, Providence/Stoughton Line, CapeFlyer (seasonal) Template:Ric: Template:Ric, Template:Ric (Template:MBTABus) Template:Ric: Template:MBTA bus links Template:Bus icon Intercity buses at South Station Bus Terminal | ||
| 2.3 (3.7) | Disabled access
|
Template:Ric: Greenbush Line, Kingston Line Template:Ric: Template:Ric Template:Ric: Template:MBTA bus links Template:Bus icon Template:MBTA other buses | ||||
| 1 | Quincy | 7.9 (12.7) | Disabled access
|
Template:Ric: Greenbush Line, Kingston Line Template:Ric: Template:Ric Template:Ric: Template:MBTA bus links | ||
| Braintree | 10.9 miles (17.5 km) | Disabled access
|
Template:Ric: Kingston Line, CapeFlyer (seasonal) Template:Ric: Template:Ric Template:Ric: Template:MBTA bus links |
This page is a redirect. The following categories are used to track and monitor this redirect:
|
Template:Ric: Template:MBTA bus links
rowspan="2" 4 rowspan="3" Brockton 18.6 (29.9) Disabled access
This page is a redirect. The following categories are used to track and monitor this redirect:
|
Template:Ric: Template:MBTA bus links
Template:Bus icon BAT: Template:MBTA other buses
20.0 (32.2) Disabled access
This page is a redirect. The following categories are used to track and monitor this redirect:
|
Template:Ric: CapeFlyer (seasonal)
Template:Bus icon BAT: Template:MBTA other buses
5 21.9 (35.2) Disabled access
This page is a redirect. The following categories are used to track and monitor this redirect:
|
Template:Bus icon BAT: Template:MBTA other buses
6 Bridgewater Template:Convert 27.7 miles 1 adj=ri1 abbr=values Disabled access Template:Bts Bridgewater
8 Lakeville, Massachusetts Lakeville Template:Convert 35.6 miles 1 adj=ri1 abbr=values bgcolor=lightgray Template:Access icon bts Lakeville Station closed for commuter rail service on March 24, 2025; remains operational for seasonal CapeFlyer trips rowspan="2" 8 Middleborough, Massachusetts Middleborough Template:Convert 34.5 miles 1 abbr=values adj=ri1 Disabled access Middleborough station Middleborough Template:Bus icon GATRA: Template:MBTA other buses Middleborough GATRA Taunton, Massachusetts Taunton Template:Convert 42.8 miles 1 abbr=values adj=ri1 Disabled access East Taunton station East Taunton Template:Bus icon GATRA: Template:MBTA other buses East Taunton GATRA align=center colspan=5 bgcolor=eaecf0 Fall River Branch rowspan="2" 8 Freetown, Massachusetts Freetown Template:Convert 51.2 miles 1 abbr=values adj=ri1 Disabled access Freetown station Freetown Template:Bus icon Southeastern Regional Transit Authority SRTA: Template:MBTA other buses Freetown SRTA Fall River, Massachusetts Fall River Template:Convert 56.6 miles 1 abbr=values adj=ri1 Disabled access Fall River station Fall River Template:Bus icon SRTA: Template:MBTA other buses Fall River SRTA align=center colspan=5 bgcolor=eaecf0 New Bedford Branch rowspan="2" 8 rowspan="2" New Bedford, Massachusetts New Bedford Template:Convert 57.4 miles 1 abbr=values adj=ri1 Disabled access Church Street station (MBTA) Church Street Template:Bus icon SRTA: Template:MBTA other buses Church Street SRTA Template:Convert 60.0 miles 1 abbr=values adj=ri1 Disabled access New Bedford station New Bedford Template:Bus icon SRTA: Template:MBTA other buses New Bedford SRTA colspan="5" align="center" bgcolor=lightgray Closed stations
External links
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs named1911report - ↑ 2.0 2.1 2.2 2.3 2.4 Cite error: Invalid
<ref>tag; no text was provided for refs namedsne - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 Cite error: Invalid
<ref>tag; no text was provided for refs named150years - ↑ Template:Multiref2
- ↑ Template:Multiref2