Jump to content

Middleborough station

From Alfawiki
Middleborough station
Company typeMBTA Commuter Rail station
IndustryTransportation
FoundedMarch 24, 2025; 19 months ago (2025-03-24)
Headquarters
Middleborough, Massachusetts
,
United States
ProductsCommuter rail service

Middleborough station serves as a stop on the MBTA Commuter Rail network in Middleborough, Massachusetts, operating on the Fall River/New Bedford Line. It commenced operations on March 24, 2025, as an element of the South Coast Rail initiative, taking over regular service duties from Middleborough/Lakeville station. The facility comprises a single side platform located within the wye junction formed by the Middleborough Main Line and the Middleboro Secondary.

Rail service first reached Middleborough via the Fall River Railroad during 1845–46. Subsequently, three branch lines were introduced: the Cape Cod Branch Railroad in 1847, the Middleborough and Taunton Railroad in 1856, and the Plymouth and Middleborough Railroad in 1892. These railroads were consolidated under the Old Colony Railroad, which erected a Tudor-style depot in 1887. The New York, New Haven and Hartford Railroad took over Old Colony in 1893. Throughout the 20th century, passenger rail usage diminished, culminating with commuter rail service to Boston ceasing in 1959.

From 1984 to 1988, seasonal operations by the Cape Cod and Hyannis Railroad utilized the former station, which was demolished during the 1990s. MBTA commuter rail service resumed in 1997 at Middleborough/Lakeville station, located south of downtown. A South Coast Rail reassessment in 2017 suggested an interim routing through Middleborough featuring a newly constructed station. In 2018, the Pilgrim Junction wye location was selected for this purpose, with construction commencing following a contract award in 2020.

Station layout

Positioned within the wye that links the north-south Middleborough Main Line with the east-west Middleboro Secondary, just south of Middleborough’s central business district, this station includes an 800-foot-long high-level platform situated on the northwest leg of the wye. Pedestrian access is provided at its northeast terminus via West Grove Street (Route 28). A parking area accommodating approximately 500 vehicles is located within the wye itself and is reachable through a driveway connecting to South Main Street (Route 105) near ramps for I-495. Additionally, provisions have been made for a future 400-foot platform on the southwest leg to facilitate shuttle train operations to Cape Cod.[1] Projections estimate daily boardings of around 670 passengers by 2030.[1]

Old Colony Railroad

The Fall River Railroad opened sections between South Braintree and Fall River incrementally from June 1845 through December 1846.[2][3] The portion stretching from Myricks to Middleborough became operational around mid-1846,Cite error: The opening <ref> tag is malformed or has a bad name with completion of the final segment linking North Bridgewater to Middleborough occurring on December 21, 1846.Cite error: The opening <ref> tag is malformed or has a bad nameCite error: The opening <ref> tag is malformed or has a bad nameCite error: The opening <ref> tag is malformed or has a bad name

In May 1847, the Cape Cod Branch Railroad established a connection between Middleborough and Sandwich, later extending to by 1854 under the Cape Cod Railroad name.[4][3] The Fall River Railroad merged into the Old Colony Railroad in 1854, forming the Old Colony and Fall River Railroad; it was renamed Old Colony and Newport Railroad in 1863 before reverting back to Old Colony Railroad in 1872.[3] That same year, Old Colony acquired the Cape Cod Railroad and designated it as its Cape Main Line.[3]

The Middleborough and Taunton Railroad, which opened in 1856 connecting Middleborough to areas south of Taunton, was absorbed by Old Colony in 1874.[3] By 1885, Old Colony timetables supported commuter travel from Middleborough.[2] Two additional stations existed south of downtown: Rock (also known as Rock Meeting House) and South Middleboro.[5]

Construction commenced in November 1885 on a new Tudor Revival-style station at Station Street, replacing the original Fall River Railroad depot; it was completed by 1887.[6][4][7] By 1891, Old Colony had enhanced landscaping around the station grounds to improve its aesthetic appeal.Cite error: The opening <ref> tag is malformed or has a bad name

The opening of the Plymouth and Middleborough Railroad in 1892—immediately leased to Old Colony—further expanded rail connections through Middleborough. In 1893, ownership of Old Colony passed to the New York, New Haven and Hartford Railroad.[3] Consequently, Middleborough evolved into a significant railroad junction for southeastern Massachusetts with routes extending in five directions and supporting infrastructure such as a freight house, rail yard, and roundhouse.[6]

20th century

In 1900, downtown Middleborough saw the removal of grade crossings, with Centre Street and Grove Street constructed as bridges over the railway tracks, while South Main Street was routed below them.

Passenger operations on the lightly trafficked Plymouth branch were discontinued in 1927, ending the local service that connected Taunton and Middleborough via Plymouth. Freight services on this line, mainly catering to cranberry producers, halted by 1939. Passenger trains on the Middleborough–Myricks section of the Fall River route ceased in 1931, followed by freight operations ending in 1932 and full abandonment by 1937. On July 17, 1938, Rock and South Middleboro stations closed as part of the extensive shutdown known as the 88 stations case.

Middleborough continued to serve New York–Cape Cod trains until 1938; afterwards, express trains operated only between and Wareham. The year-round Cape Codder remained in service until 1958 and then ran seasonally through 1964. Commuter rail service to Boston, with some trains terminating at Middleborough, persisted until June 30, 1959, when the New Haven Railroad terminated all passenger operations on the Old Colony Division. A fire on the Neponset River bridge disrupted Boston-to-Cape service via Middleborough; in response, a seasonal Boston–Hyannis train via Stoughton was operated in 1961.

Freight traffic on lines extending north, west, and southeast from Middleborough continued under New Haven control until 1969, followed by Penn Central through 1971, Conrail until 1997, and CSX thereafter. Freight services southeast of Middleborough were handled by Bay Colony Railroad beginning in 1982 and later by Massachusetts Coastal Railroad from 2007, with interchange connections at Middleborough Yard with CSX.

MBTA era

Efforts to reinstate passenger rail service emerged sporadically throughout the 1960s and 1970s. On October 15, 1979, a special promotional train ran from Braintree to Middleborough to support state restoration initiatives. A state study conducted in 1974 identified the potential reuse of the original Middleborough station. Between 1984 and 1988, seasonal commuter and excursion trains operated by the Cape Cod and Hyannis Railroad made stops at the former station site. From 1986 to 1996, Amtrak’s Cape Codder passed through Middleborough without stopping due to station location constraints. The original station building was demolished during the 1990s. The freight house built in 1887 was added to the National Register of Historic Places in 2000 as part of the Middleborough Center Historic District and was slated for restoration in 2011; however, it was destroyed by fire in October 2020.

A study by the MBTA in 1984 confirmed that restoring commuter rail service was feasible. Subsequent environmental reviews—a Draft Environmental Impact Statement in 1990 and a Final Environmental Impact Statement in 1992—recommended constructing a new Middleborough/Lakeville station near Route 105, close to the Lakeville town boundary, rather than reusing the old station location. MBTA Commuter Rail service on the Middleborough/Lakeville Line commenced on September 29, 1997, featuring a layover facility situated west of the wye on the Middleboro Secondary.

South Coast Rail

The South Coast Rail initiative, designed to reinstate passenger rail service to Fall River and New Bedford, originated in the 1980s with proposed routes passing through Middleborough, Stoughton, and Attleboro. Initially, the Stoughton route was the preferred option until the project's cancellation in 2003. Planning efforts recommenced in 2005, and by 2009, the Stoughton alignment remained the favored choice. In 2008, MassDOT introduced a proposal featuring 18 potential stations, including a "village-style" station situated in downtown Middleborough.

By 2017, budgetary constraints prompted a revision of the plan to enable early service via Middleborough by 2022, with full service through Stoughton anticipated by 2030. A new station in Middleborough was proposed to replace the existing Middleborough/Lakeville station, which South Coast Rail trains could not access. This proposal raised concerns among local officials regarding the abandonment of the current station, which had been a catalyst for transit-oriented development, as well as potential traffic issues associated with a downtown Middleborough location.

The Draft Supplemental Environmental Impact Report released in January 2018 assessed three operational strategies for Middleborough: performing reverse moves to serve the current station, operating shuttle trains between Middleborough/Lakeville and Bridgewater stations, or constructing a new Middleborough station supplemented by shuttle bus connections. The preferred alternative was building a new station due to its advantages in reduced travel times and lower infrastructure expenses. Two potential sites were evaluated—the former downtown station site and the wye at Pilgrim Junction—with Pilgrim Junction selected for its cost-effectiveness and minimized traffic impacts. Meanwhile, CapeFLYER service continued utilizing Middleborough/Lakeville station since the new facility lacked a platform on the main line.

In 2020, buildings located at 161 South Main Street and 52 West Grove Street were demolished to make way for the new station and its parking facilities. On August 24 of that year, the MBTA awarded a $403.5 million contract covering construction of both the Middleboro Secondary and New Bedford Secondary segments, including the new Middleborough station. Construction commenced later in 2020 with an anticipated opening in late 2023. By February 2022, platform foundations had been completed; steel structures for platforms and canopies were installed by November of that year. However, the opening was postponed to mid-2024 as of September 2023 when construction reached 98% completion; subsequent delays pushed service commencement to May 2025. The station was fully finished at that time, with service officially starting on March 24, 2025.

Middleborough station has been designed with future expansion in mind, including space for a platform to accommodate shuttle trains serving Cape Cod. In fall 2020, the MBTA launched a feasibility study examining commuter rail options for Buzzards Bay connected to South Coast Rail. Completed in 2021, this study explored alternatives involving stops at Buzzards Bay or Bourne stations. Both scenarios would necessitate transfers at Middleborough, although some direct off-peak train services could be provided.

  1. ↑ 1.0 1.1 Cite error: Invalid <ref> tag; no text was provided for refs named dseir
  2. ↑ 2.0 2.1 Cite error: Invalid <ref> tag; no text was provided for refs named 150years
  3. ↑ 3.0 3.1 3.2 3.3 3.4 3.5 Cite error: Invalid <ref> tag; no text was provided for refs named sne
  4. ↑ 4.0 4.1 Cite error: Invalid <ref> tag; no text was provided for refs named history
  5. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named study
  6. ↑ 6.0 6.1 Cite error: Invalid <ref> tag; no text was provided for refs named depots
  7. ↑ Cite error: Invalid <ref> tag; no text was provided for refs named nemasket