Jump to content

Flushing and North Side Railroad

From Alfawiki
Adapted from the English Wikipedia article Flushing and North Side Railroad, available under CC BY-SA 4.0Updated 26 July 2025
Flushing and North Side Railroad
Company typeRailroad company
IndustryRail transport
PredecessorNew York and Flushing Railroad
Founded1868
FounderConrad Poppenhusen
Defunct1874
FateMerged with Central Railroad of Long Island to form the Flushing, North Shore and Central Railroad
Headquarters
Long Island City
,
United States
Area served
Long Island, New York

The Flushing and North Side Railroad was a Long Island rail company established in 1868 by Conrad Poppenhusen to succeed the earlier New York and Flushing Railroad. In 1874, it combined with the Central Railroad of Long Island to form the Flushing, North Shore and Central Railroad, which the Long Island Rail Road purchased in 1876. Today, its principal route operates as the Port Washington Branch of the LIRR.

New York and Flushing Railroad

Chartered in 1852, the New York and Flushing Railroad (NY&F) constructed most of the line from Hunters Point in Long Island City to Flushing by 1854. It was notable as the first Long Island railroad independent from the Long Island Rail Road. After Oliver Charlick took control in 1859, it reorganized under the NY&F name and created a subsidiary called the "North Shore Railroad" to extend service from Flushing to Great Neck, NY in 1866. The company aimed to expand further east toward markets such as Roslyn and Oyster Bay but was outpaced by the LIRR, which reached those areas first. The NY&F suffered from subpar service, which limited its ability to capture market share and grow.

Flushing and Woodside Railroad

Frustration with NY&F’s inadequate service led residents of Flushing and Newtown to urge the LIRR to establish a rival line. Consequently, on February 24, 1864, the Flushing and Woodside Railroad was incorporated as a competing branch serving Flushing. This route extended from Woodside toward Great Neck Junction, including a branch toward Whitestone. Following NY&F’s failure after its Great Neck Extension, LIRR acquired this railroad but left its branch incomplete. Conrad Poppenhusen, founder of the Flushing and North Side Railroad, later purchased and finished this line, which became known as the Woodside Branch under Flushing and North Side management. The branch featured Grinnell station at Junction Boulevard and 35th Avenue (opened April 24, 1874; closed October 1877). East of Grinnell station near the Flushing River, a junction allowed trains to either continue on the F&NS main line or divert onto the Whitestone Branch.

North Shore Railroad

Despite operational challenges, NY&F formed a subsidiary called the North Shore Railroad of Long Island on September 25, 1863 to extend service from Flushing to Great Neck, which opened on October 27, 1866. Under competitive pressure, NY&F sold both this line and its lease on the North Shore Railroad to LIRR in 1867. This acquisition bolstered LIRR’s strategic position by preventing the South Side Railroad from accessing Long Island City terminal facilities and blocking North Side expansion eastward toward Huntington, which would have created competition for LIRR. Subsequently, LIRR discontinued construction on the unfinished Flushing and Woodside branch.

Formation

Responding to demands from residents of Flushing as well as influential individuals from College Point and Whitestone, including businessman Conrad Poppenhusen, the Flushing and North Side Railroad was incorporated on April 3, 1868. The company obtained authorization to build a line running from Long Island City through Flushing onward to Roslyn, along with a branch to Whitestone. It acquired the incomplete Flushing and Woodside Railroad and commenced service to Flushing in 1868; by 1869, service extended to College Point and Whitestone. This expansion attracted notable traffic away from the older New York and Flushing route, leading LIRR to divest its holdings in its Flushing branch.

In that same year, an affiliated company—the Whitestone and Westchester Railroad—constructed the Whitestone Branch intended to link across the East River into Westchester County; however, this connection was never realized. The branch included freight spurs serving docks along Flushing Bay. Primary stations along this route included Bridge Street, College Point, plus two stops within Whitestone at 14th Avenue and 155th Street (known respectively as Whitestone Landing and Beechhurst Yacht Club stations). The Malba station was introduced decades later following LIRR’s acquisition.

Also in 1869, authorization from the New York State Legislature allowed Flushing and North Side to acquire New York and Flushing’s lines east of . The company constructed connecting tracks at Woodside/Winfield and at Flushing to unify its network. Meanwhile, New York and Flushing retained ownership west of Winfield, serving as South Side Railroad’s access point into Long Island City.

Passenger service between what would become future stations ceased in 1875 and was fully discontinued by 1880; this former right-of-way is now partially beneath Mount Zion Jewish Cemetery in Maspeth. The Flushing and Woodside Railroad merged into Flushing and North Side in 1871; subsequently its line was abandoned in favor of utilizing former New York and Flushing trackage.

This consolidation strategy significantly increased market presence for Queens rail service providers by expanding network coverage through acquisitions and infrastructure development, thereby strengthening competitive positioning against rivals such as LIRR.

Planned extension

To broaden services eastward from Great Neck, subsidiaries were formed by the NY&F and F&NS railroads. The F&NS put forward proposals for the North Shore and Port Washington Railroad as well as the Roslyn and Huntington Railroad; however, these initiatives were discontinued following the 1874 consolidation with the Central Railroad of Long Island. The LIRR made efforts to push the line further to Roslyn up until 1882 but faced obstacles due to difficult construction conditions in the Manhasset Valley area.

Consolidations

On June 19, 1874, all divisions of the Flushing and North Side Railroad—including the Main Line extending to Great Neck—were unified into the Flushing, North Shore and Central Railroad, which incorporated the Central Railroad of Long Island. This company was absorbed into the Long Island Rail Road two years later. Despite an unsuccessful attempt in 1882 to extend service beyond Great Neck, wealthy residents of Port Washington persuaded the LIRR to push the terminus there by 1895. This expansion necessitated building the Manhasset Viaduct over Manhasset Bay, which was finished on June 23, 1898. Following this development, the Woodside and Whitestone Branches were terminated.

Main Line

Location Station Distance (miles/kilometers)
to Penn Station
Current Transit Links/Notes Historical Details
58th Street & 39th Avenue, Woodside Woodside
Subway: (Template:NYCS Flushing)
Bus: Q18, Q32, Q53
Opened November 15, 1869; rebuilt in 1916 during grade crossing removal
Woodside Template:Lirrs Inaugurated July 1854; relocated to junction in 1876; closed in 1929
Elmhurst Template:Lirrs Established 1855 as Newtown; renamed Elmhurst in 1897; ceased operations in 1985
Corona Template:Lirrs Service commenced June 26, 1854; renamed Corona in 1872; closed in 1963
Template:Lirrs Opened September 1854; subsequently abandoned
Whitestone Junction Served Whitestone Branch; situated east of present-day Template:Lirrs station
Great Neck Junction Junction for several branches; located on east side of Flushing River
Main Street and 41st Avenue, Flushing Flushing-Main Street 9.5 (15.3) Subway: (Template:NYCS Flushing)
Bus: Q12, Q17, Q20, Q25, Q26, Q28, Q34, Q44, Q48, Q58
Bus (Nassau Inter-County Express): n20 series
Service started June 26, 1854
150th Street and 41st Avenue, Flushing Template:Lirrs 10.3 (16.6) Bus: Q15 Constructed around 1890 by LIRR
162nd Street and Northern Boulevard, Flushing Template:Lirrs 11.1 (17.9) Bus: Q12, Q13, Q28 Opened October 27, 1866 as East Flushing; elevated between 1912 and 1913
192nd Street and Station Road, Auburndale Template:Lirrs 11.7 (18.8) Bus: Q12, Q13, Q28, Q76 Built in 1901 by LIRR
213th Street and 41st Avenue, Bayside Template:Lirrs 12.6 (20.3) Bus: Q13, Q31
235th Street and 41st Avenue, Douglaston Template:Lirrs 13.9 (22.4) Bus: Q12, QM3
Bus (Nassau Inter-County Express): n20G
Initially known as Little Neck Station until June 1870
Little Neck Parkway and 39th Road, Little Neck Template:Lirrs 14.5 (23.3) Bus: Q12, Q36
Bus (Nassau Inter-County Express): n20G
Middle Neck Road and Station Plaza at Great Neck Road, Great Neck Plaza Template:Lirrs 15.7 (25.3) Bus (Nassau Inter-County Express): n20G series Service initiated October 27, 1866; functioned as terminus until 1898
Stations beyond this point were constructed by LIRR as part of the Port Washington Branch completed on June 23, 1898

Original New York & Flushing section

Location Station Miles (kilometers)
to Penn Station
Connections/notes History
Hunter's Point, Long Island City Hunter's Point Established in 1854. Later renamed Long Island City (LIRR station)
Long Island City Template:Lirrs Inaugurated in 1854. Initially part of the South Side Railroad of Long Island, later incorporated into LIRR. Ceased operations in 1998.
Interchange with South Side Railroad of Long Island (currently LIRR Montauk Branch) at Laurel Hill. Section discontinued in 1880. A small station was added between 1890 and 1900.
Maspeth Maspeth Operated from 1855 to 1858; service resumed on Montauk Branch in 1895 and again in 1924.
Woodside Template:Lirrs Served as the junction connecting LIRR and NY&F Main Lines. The track segment between Laurel Hill and Winfield was abandoned in 1880.
Extends as F&NS Main Line toward Great Neck.

Woodside Branch

Location Station Miles (kilometers)
to Penn Station
Connections/notes History
61st Street and Roosevelt Avenue, Woodside Template:Lirrs 5.1 (8.2) Subway: (Template:NYCS Flushing)
Bus: Q18, Q32, Q53
Western endpoint of the Woodside Branch
Grinnell Functioned from 1874 to 1877. Sole station on Woodside Branch located at Junction Blvd and 35th Ave.
Connection point with Central Railroad of Long Island.
Link to Flushing Bay Freight Spur.
Eastern terminus connecting with Whitestone Branch.
Complete abandonment occurred in the late 1870s.

Whitestone Branch

Location Station Miles (kilometers)
to Penn Station
Connections/notes History
Whitestone Junction Originates at Port Washington Branch near Corona Yard, east of Template:Lirrs station.
Connection with Flushing Bay Freight Spur.
Link to Woodside Branch.
Flushing Flushing–Bridge Street 'Distinct from Template:Lirrs. Operated between 1870 and 1932.
College Point Active from 1869 until 1932.
Malba Only station constructed by LIRR on this route; operational from 1909 to 1932.
Whitestone Whitestone–14th Avenue Whitestone Line (NY&NST Trolley) In service from 1869 through 1932.
Whitestone Landing (at 155th Street) "Beechhurst Yacht Club Station." Functioned between 1886 and 1932.
The entire branch was discontinued on February 15, 1932.