Lake Side Power Station
| Company type | Power station |
|---|---|
| Industry | Electric power generation |
| Founded | 2007 |
| Headquarters | Vineyard , United States |
Area served | Utah |
Key people | PacifiCorp (operator) |
| Products | Electricity generation |
| Parent | PacifiCorp (operating as Rocky Mountain Power) |
Lake Side Power Station is a combined cycle power facility fueled by natural gas turbines, situated in Vineyard, Utah, United States. The plant consists of two separate power blocks, each configured as a 2x1 combined cycle system. Built by Siemens Westinghouse Power Corporation, the station is managed by PacifiCorp, operating under the name Rocky Mountain Power within Utah.
The power station was completed in 2007 and initially generated an average output of 550 megawatts per day. With the integration of a second power block in 2014, the total generation capacity increased to 1,100 megawatts. Occupying a 70-acre area, the site includes 22 acres that were previously part of the Geneva Steel mill. To meet environmental standards, the plant utilizes emission offset credits acquired from Geneva Steel. Positioned close to Utah Lake, the facility is visible from Interstate 15 between the exits for Orem/Lindon and Pleasant Grove.