Manchester and Leeds Railway
| Company type | Public company |
|---|---|
| Industry | Railway transport |
| Founded | 1836 |
| Founder | George Stephenson (chief engineer) |
| Defunct | 1847 |
| Fate | Renamed Lancashire and Yorkshire Railway after mergers |
| Headquarters | Manchester , United Kingdom |
Key people | George Stephenson (chief engineer) |
| Products | Railway transport services |
The Manchester and Leeds Railway was a British rail company responsible for constructing a route from Manchester to Normanton, where it linked with the North Midland Railway to provide access to Leeds. The line predominantly traced the course of the River Calder valley, which helped minimize steep gradients but resulted in bypassing several significant industrial towns. To traverse the Lancashire-Yorkshire watershed, engineers built a lengthy tunnel. The entire railway became operational in 1841.
Anticipating future growth, the company initiated branch lines either directly or through affiliated enterprises. In Manchester, it established a connection with the Liverpool and Manchester Railway by constructing a linking track and the crucial shared passenger terminal known as Victoria station.
Growth intensified rapidly, and by 1846 the original company name no longer adequately described its expanding network. After receiving parliamentary sanction for further mergers, it adopted the name Lancashire and Yorkshire Railway under the Lancashire and Yorkshire Railway Act 1847 (10 & 11 Vict. c. clxiii) on 9 July 1847. This renaming signified the commencement of an era marked by vigorous expansion.
Conception
Proposals for a railway connecting Manchester and Leeds emerged simultaneously with plans for the Liverpool and Manchester Railway. An initial company formed in 1825 with involvement from engineer George Stephenson failed to advance; a renewed attempt in 1831 also did not secure approval.[1][2]
In 1835, the company was re-established with capital of £800,000, and Stephenson was reinstated as chief engineer. The alignment was altered to pass through Wakefield to Normanton, where it joined the North Midland Railway, granting running rights into Leeds. This eastward rerouting reduced gradient difficulties but introduced three steep inclines near Manchester and necessitated several tunnels, including one measuring 1705 yards.[2][3] The running powers covered nine miles on the North Midland line into Leeds, with an option allowing construction of that segment should North Midland fail to build it.
The Manchester and Leeds Railway Act 1836 (6 & 7 Will. 4. c. cxi) received royal assent on 4 July 1836, authorizing share capital of £1,300,000. Subsequently, the Manchester and Leeds Railway Act 1837 (7 Will. 4 & 1 Vict. c. xxiv) passed on 5 May 1837 permitted route adjustments.[4]
Tunnels
Construction commenced on the section between Manchester and Littleborough on 18 August 1837, followed by work on the Summit Tunnel in the subsequent year. The tunnel proved more costly and time-consuming than initially anticipated. Near completion in December 1839, a segment of the invert[note 1] failed, causing side walls to shift by , necessitating reconstruction. Stephenson attributed this failure to misleading blue shale conditions:
The blue shale was believed stable enough to require only a weak invert; however, it disintegrated like quicklime, leaving only the invert lip to bear arch pressure, causing it to spring both inward and upward.[5]
Upon its completion, Summit Tunnel held the distinction of being the longest railway tunnel worldwide at . The brickwork thickness varied between five and ten rings. The overall expenditure amounted to £251,000.[6][7]
Charlestown Tunnel, situated between Eastwood and Hebden Bridge, encountered difficulties due to unstable sandy soil. By 8 June 1840, masonry collapse was reported within the tunnel. Following further evaluation, plans for this tunnel were abandoned; instead, the line was diverted around the hill at ground level incorporating curves with a radius of .[6]
Early track
In 1842, Whishaw documented that the track gauge measured 4 feet 9 inches [1,448 mm], permitting a lateral wheel clearance of 1⁄1}{4 inch on each side.[note 2] The rails consisted of single parallel bars, each approximately 15 feet (4.6 m) in length, resting on bearings spaced every 3 feet (0.91 m).[note 3]
The railway employed T-section rails, featuring heads wide and deep, weighing , which were fixed into chairs measuring by , secured with a ball and key fitting system featuring grooves on either side of the rail stem. Sleepers consisted of sandstone blocks (~) within cuttings and Kyanised larch timber sleepers ( by by ) placed on embankments.[8][6]
Opening
The line officially commenced operations on Wednesday, 3 July 1839, running from Manchester to Littleborough. Two trains transported directors and invited guests as far as Summit Tunnel. Public services began the next day, carrying 3,100 passengers. Ticket prices for the Manchester to Littleborough segment were set at 4s for first class, 2s 6d for second class, and 6d for third class. Thomas Edmondson, the chief booking clerk in Manchester, invented a device to print standardized railway tickets and imprint dates—a system that remained in use until the 1970s—initially implemented on the in 1839.
On 5 October 1840, the stretch from Normanton to Hebden Bridge was inaugurated. The North Midland Railway had already opened its own route to Leeds on 30 July, operating from its Hunslet Lane terminus. Since the eastern portion of the was isolated due to Summit Tunnel’s incompletion, locomotives from NMR serviced this segment until the tunnel was finished. Passengers could purchase through tickets from Manchester to Leeds, with road coaches bridging the gap between Littleborough and Hebden Bridge.
The section connecting Hebden Bridge to Summit Tunnel became operational on 31 December 1840. Following completion of Summit Tunnel, Sir Frederick Smith conducted an inspection in February 1841 and authorized public use. The main line officially launched on 1 March 1841. Four Sunday trains running in each direction encountered significant opposition from religious groups, resulting in board conflicts and the resignation of the chairman along with two directors in protest.
First train services
The initial schedule included nine passenger trains traveling each way on weekdays and four services on Sundays. The earliest eastbound weekday train originated at Sowerby Bridge. Services alternated between all-stop trains and semi-fast trains—the latter halting at eight intermediate stations compared to fifteen stops for all-stations services. Travel times were roughly 3 hours and 20 minutes for stopping trains versus approximately 2 hours and 45 minutes for semi-fast ones.
Several important towns were bypassed by the line but noted in timetables as Mills Hill (serving Oldham), Blue Pitts (for Heywood), Todmorden (for Burnley), Sowerby Bridge (for Halifax), Brighouse (for Bradford), and Cooper Bridge (for Huddersfield).
Due to dense population centers along its route and early southbound traffic diverted from Manchester amid disputes affecting the Grand Junction Railway, the rapidly generated substantial profits.
In July 1844, the seized all Midland Railway goods wagons operating on its network to run a reduced-fare excursion from Dewsbury to Liverpool, a common tactic at the time. In retaliation, Midland Railway confiscated M&LR wagons and transferred them to Derby.
On 16 September 1847, a derailment occurred at Sowerby Bridge when a train powered by a 2-2-2 locomotive encountered a broken rail; this accident resulted in two fatalities among passengers and one injury. Captain J L A Simmons, a government inspector, criticized the track’s condition: over , many chairs had loosened within stone blocks; gauge irregularities reached up to , and rails exhibited severe wear. Although approximately of track had been replaced with double-head rails mounted in chairs between 1844 and 1846, extensive maintenance work was still required.
Manchester Victoria Station
Following the inauguration of the Leeds to Manchester route, the absence of a direct connection between the 's Oldham Road station and the 's Liverpool Road terminus hindered a continuous line from Liverpool to Hull. This situation necessitated the transfer of both passengers and freight across Manchester, leading to operational inefficiencies. To address this, the companies consented to construct a linking railway running from at Miles Platting to a newly established station at Hunt's Bank, continuing onward to the Manchester and Bolton Railway terminus near the present-day Salford Central. This connection followed an S-shaped route westward from its terminus, completed by July 1838. Samuel Brooks, serving as vice-chairman of , privately acquired the Hunt's Bank land and subsequently donated it to the company in August 1838. The segment between Miles Platting and Hunt's Bank was constructed by , whereas the western portion was developed by . Parliamentary approval for this scheme was granted through the Liverpool and Manchester Railway Act 1839 (2 & 3 Vict. c. xli) on 14 June 1839, followed by the Manchester and Leeds Railway Act 1839 (2 & 3 Vict. c. lv) on 1 July, which also authorized branch lines to Oldham and Halifax.
Considerable controversy arose regarding route selection; favored a southern link via the Manchester and Birmingham Railway to enhance southern connectivity but at the cost of severing Bolton’s connection and complicating Leeds traffic due to incompatible track levels. This disagreement was resolved with the passage of the Liverpool and Manchester Railway Act 1842 (5 & 6 Vict. c. cviii) on 30 July 1842.
The construction phase of the segment encountered several incidents but ultimately commenced operations on 1 January 1844. The extension featured a steep descent toward Hunt's Bank with gradients ranging from 1 in 47 to 1 in 59, initially employing a stationary engine at Miles Platting for rope-assisted haulage.
From its opening, the station bore the name Victoria,[note 4] boasting what was then the nation’s largest platform at 852 ft, accommodating Liverpool-bound trains to the west and Leeds-bound services to the east.
Initially, trains were hauled uphill using wire rope systems while descending trains were regulated by brake wagons. However, records indicate that within approximately eighteen months, conventional locomotives managed trains exceeding 80 long tons without reliance on rope haulage. Following Victoria’s inauguration, Oldham Road station ceased passenger operations after just four and a half years but continued functioning solely as a goods depot.
Leeds Station
The original terminus utilized by the Manchester and Leeds Railway in Leeds was located at Hunslet Lane, situated south of the city centre and shared with the Midland Railway. In 1846, most Midland Railway services were transferred to Wellington Station, positioned centrally and constructed by the Leeds and Bradford Railway. After this shift, the Manchester and Leeds Railway maintained operations at Hunslet Lane but redirected most trains through an LNWR route via Batley in 1848. This route intersected with the Midland Railway's Leeds–Bradford line at Holbeck and terminated at a temporary station approximately from Wellington, close to where would later be established; a permanent station opened there around 1851.[9]
Expansion and branch lines until 1846
The Manchester and Leeds Railway Act of 1836 (6 & 7 Will. 4 c. cxi), enacted on 4 July 1836, authorized the construction of the principal route connecting Manchester to Normanton, thereby facilitating access to Leeds. This main line reached completion in 1841, with an extension to Manchester's Victoria station finalized in 1844. In response to industrial demands, the company expanded its network by developing branch lines and acquiring other railways to link significant manufacturing locations.
Heywood Branch 1841
Heywood, known for its cotton mills and iron foundry, was connected by a single-track branch line that commenced operations on 15 April 1841. Although initially constructed without parliamentary consent, retrospective authorization was granted on 10 May 1844 under the Manchester and Leeds Railway Act 1844 (7 & 8 Vict. c. xvi). This branch diverged from the main line at Castleton (formerly Blue Pitts), situated roughly southwest of Rochdale, with a construction expenditure of £10,000. Branch trains were initially drawn by horse power until locomotive services began on 1 May 1847.
Oldham branch 1842
The Hunt's Bank extension included authorization for an Oldham branch under the Manchester and Leeds Railway Act 1839 (2 & 3 Vict. c. lv), passed on 1 July 1839, which opened on 31 March 1842. This two-mile line ascended 186 feet from a junction at Middleton, originally named Oldham Junction. Featuring a steep incline averaging a gradient of 1 in 27 over more than half its distance, the branch employed a unique system developed by General Manager Captain Laws. This method involved balancing mineral wagons on a separate track while using a cable wrapped around a large drum at the top of the slope to assist trains. This cable-operated mechanism remained in use until sometime between 1851 and 1856, when it was replaced by standard locomotive operations.
"This branch includes a steep gradient of 1 in 27 extending for one mile between Middleton Junction and Werneth, Oldham, with a stationary engine at the summit pulling trains via rope."[note 5]
Halifax branch 1844
The Hunt's Bank Act also sanctioned construction of a Halifax branch—a short route of approximately 1¾ miles characterized by steep gradients. The junction at North Dean (later renamed Greetland) faced towards Wakefield. The Halifax terminus was situated at Shaw Syke, with the branch opening on 1 July 1844.
Bolton and Bury lines 1846
Originally established under the Manchester, Bolton and Bury Canal Act of 1791 (31 Geo. 3 c.68), the Manchester, Bolton and Bury Canal Company proposed building a railway alongside its canal in 1832, subsequently renaming itself Manchester, Bolton & Bury Canal Navigation and Railway. The railway never extended as far as Bury; its "Manchester" terminus was located in Salford instead. The line opened to Bolton on 29 May 1838 and operated six weekday trains each way plus two on Sundays.
Starting in May 1844, the Manchester Bolton & Bury Railway gained access to Victoria station using tracks owned by the Liverpool & Manchester Railway.
Following unsuccessful negotiations in Manchester during 1844, the Manchester and Bolton Railway agreed to more advantageous terms offered by the Manchester and Leeds Railway (M&LR) on 30 January 1846. An operational agreement took effect from 1 July that year, and through the Manchester and Leeds Railway (Manchester, Bolton and Bury Canal and Railway) Act of 18 August 1846 (9 & 10 Vict. c. ccclxxviii), the Bolton company was formally absorbed into M&LR.
Liverpool and Bury Railway 1846
Entrepreneurs from Bolton and Wigan, dissatisfied with the Liverpool and Manchester Railway, established the Liverpool and Bury Railway, which received authorization on 31 July 1845 to construct a route from Sandhills, near Liverpool Exchange, to Bury. To avoid pressure from the Liverpool and Manchester Railway, the L&BR aligned with the Manchester and Leeds Railway (), which was eager to secure access to Liverpool. Before completion, the M&LR absorbed the L&BR on 1 October 1846. The railway commenced operations on 20 November 1848, by which time the M&LR had been renamed the Lancashire and Yorkshire Railway ().
Huddersfield and Sheffield Junction Railway 1846
Authorized under the Huddersfield and Sheffield Junction Railway Act 1845 (8 & 9 Vict. c. xxxix) on 30 June 1845, this line was intended to link Huddersfield with the Sheffield, Ashton-under-Lyne and Manchester Railway (later known as the Manchester, Sheffield and Lincolnshire Railway) near Penistone, including a branch to Holmfirth. Though never constructed independently, it was incorporated into the Manchester and Leeds Railway on 27 July 1846. The route opened on 1 July 1850. Initially operated by the Manchester, Sheffield and Lincolnshire Railway due to its separation from the M&LR network, Sheffield-Huddersfield services began running from Penistone in 1870.
West Riding Union Railways 1846
The West Riding Union Railways Company emerged in 1846 after George Hudson’s plans for a southward Bradford-to-Halifax line failed. The West Riding Union Railways Act 1846 (9 & 10 Vict. c. cccxc) authorized a route backed by the Manchester and Leeds Railway, requiring integration within three months. This merger took place on 17 November 1846; construction was undertaken by the Manchester and Leeds Railway, which became the Lancashire and Yorkshire Railway in the following year. The segment between Low Moor and Mirfield opened on 18 July 1848; Bradford to Low Moor followed on 9 May 1850; Mirfield to Halifax opened on 7 August 1850; and Sowerby Bridge service began on 1 January 1852.
Preston and Wyre Railway 1846
Established in 1835, the Preston and Wyre Railway and Harbour Company created a line from Preston through Poulton to Fleetwood, opening in 1840. In 1839 it merged with the Preston and Wyre Dock Company to form the Preston and Wyre Railway, Harbour and Dock Company. Branch lines to Blackpool North and Lytham were inaugurated in 1846.
Following its absorption of the Manchester and Bolton Railway and part of the North Union Railway in 1846, the Manchester and Leeds Railway expanded its network to Preston. Having cooperated with Preston and Wyre Railway on excursion traffic, a formal merger was sanctioned by the Manchester and Leeds Railway Act 1846 (9 & 10 Vict. c. cclxxvii) on 3 August 1846.
Ashton, Stalybridge and Liverpool Junction Railway 1847
Authorized by the Ashton, Stalybridge and Liverpool Junction Railway Act 1844 (7 & 8 Vict. c. lxxxii) on 19 July 1844, this branch extended from Miles Platting to Ashton and Stalybridge, including a short spur to Ardwick. Despite its title, it did not reach Liverpool. The line connected adjacent to Stalybridge station of the Sheffield, Ashton and Manchester Railway (later known as Manchester, Sheffield and Lincolnshire Railway). The Ashton, Stalybridge and Liverpool Junction Railway Act 1845 (8 & 9 Vict. c. cix) authorized a junction with the Manchester and Birmingham Railway at Ardwick.
The Ashton branch opened on 13 April 1846, reaching Stalybridge by 5 October that year. The roughly single-track line was mostly doubled by March 1849 except for the Medlock viaduct section; full double-track approval was granted in August with completion later that year. The Ardwick branch of under opened for freight traffic on 20 November 1848; passenger services commenced at the end of 1852.
Wakefield, Pontefract and Goole Railway
Aiming to extend its reach eastwards and establish a direct link to a port on the east coast, the company initiated the construction of a railway line originating from its Wakefield station. The Wakefield, Pontefract and Goole Railway Act 1845 (8 & 9 Vict. c. cxlii), passed on 31 July 1845, granted permission for this route to run eastward from the Liverpool and Manchester Railway's Wakefield Kirkgate station, passing through Crofton, Featherstone, Pontefract, Knottingley, and Hensall before reaching Goole. This line commenced operation on 1 April 1848, by which time the company had amalgamated with others to form the Lancashire and Yorkshire Railway on 9 July 1847. Subsequent Parliamentary acts dated 16 July 1846 authorized enhancements to Goole docks as well as branch lines extending from Pontefract to Methley (opened 12 September 1849) and from Knottingley to Askern, connecting with the Great Northern Railway.
Establishment of the Lancashire and Yorkshire Railway
As the Manchester and Leeds Railway experienced considerable growth, it was renamed the "Lancashire and Yorkshire Railway" on 9 December 1846, a change ratified by the Lancashire and Yorkshire Railway Act 1847 (10 & 11 Vict. c. clxvi) enacted on 9 July 1847. This legislation incorporated both the Wakefield, Pontefract and Goole Railway and the Ashton, Stalybridge and Liverpool Junction Railway into the newly formed company.
The act further authorized a southern connection at Castleton linking the main line to the Heywood branch, facilitating direct services between Manchester and Bury. It also permitted the Liverpool and Bury Railway to extend eastward beneath the East Lancashire Railway at Bury to join the Heywood branch extension, including an east-to-north junction between these lines at Bury.
Boiler explosion
On 28 January 1845, locomotive No. 27 named Irk experienced a boiler explosion at Miles Platting in Lancashire.
Location list
- ; inaugurated 1 January 1844; remains operational;
- ; opened 4 July 1839; ceased operations 1 January 1844;
- ; opened on 1 January 1844; last service ran on 26 May 1995;
- ; operational by February 1872; still active;
- Oldham Junction; opened on 31 March 1842; renamed Middleton on 11 August 1842; renamed again in 1852; closed on 3 January 1966;
- ; opened 4 July 1839; closed on 11 August 1842; a new station was opened on 25 March 1985; remains open;
- Blue Pits or Blue Pitts; started service on 15 September 1839; renamed on 1 November 1875; still in use;
- ; opened on 4 July 1839; relocated on 28 April 1889; remains operational;
- ; commenced operations on 1 October 1868; closed on 2 May 1960; reopened on 19 August 1985; currently open;
- ; opened since 4 July 1839; still functioning;
- Summit Tunnel;
- ; began service in October 1845; closed on 7 August 1961; a new nearby station opened on 10 September 1990; remains open;
- ; opened on 28 December 1840; still active;
- ; started operations on 28 December 1840; closed on 3 December 1951;
- ; inaugurated on 5 October 1840; remains open;
- ; opened in May 1847; still operational;
- ; opened on 5 October 1840; closed on 10 September1962;
- ; commenced service on5 October1840; relocatedon1 September1876; still in use;
- Greetland Junction;
- North Dean; began service February1846; renamedon1 January1883; closed10 September1962;
- ; opened12 April1841; relocated1 August1865; closed10 September1962;
- ; inaugurated5 October1840; closed5 January1970; new station reopened28 May2000 at same location; still active;
- ; opened1 October1840; closedFebruary1950;
- ; started March1845; relocated March1866; currently operational;
- Dewsbury; opened October1840, later renamed ; closed January1962;
- Horbury; inaugurated October1840, renamed Horbury & Ossett March1903, renamed again June1962, closed January1970;
- ; opened January1850, replaced by , which opened July1927 and closed November1961;
- Wakefield Kirkgate (originally Wakefield); operational since October1840, still open;
- Goose Hill Junction;
- (North Midland Railway station); line opened July1840, remains open.
Heywood Branch
- Blue Pitts (see above);
- : commenced operations in April 1841; moved in May 1848 following the extension to Bury; ceased service in October 1970.
Oldham Branch
- Oldham Junction; refer above;
- Oldham; inaugurated on 31 March 1842; renamed Oldham Werneth in 1849; closed on 4 October 2009.
Halifax Branch
- Greetland Junction; refer above;
- Halifax, originally opened at Shaw Syke on 1 July 1844; shifted to its present location on 7 August 1850.
External links
- The Manchester & Leeds Railway in 1960 - Oldham Road to Miles Platting Station Junction
- The Manchester & Leeds Railway in 1960 - Manchester Victoria to Newtown No.1
- The Manchester & Leeds Railway in 1960 - Newtown No.1 to Miles Platting Station Junction
- The Manchester & Leeds Railway in 1960 - Miles Platting Station Junction to Thorpes Bridge Junction
- The Manchester & Leeds Railway in 1960 - Thorpes Bridge to Hebden Bridge
- The Manchester & Leeds Railway in 1960 - Hebden Bridge to Normanton, Goose Hill
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedBairstow26 - ↑ 2.0 2.1 Cite error: Invalid
<ref>tag; no text was provided for refs namedmarshall39 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedmarshall42 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedmarshall40 - ↑ George Stephenson, contemporaneous remarks, quoted in Samuel Smiles, The Story of the Life of George Stephenson, John Murray, London, 1860, page 262
- ↑ 6.0 6.1 6.2 Marshall, pages 43 to 47
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedbairstow26 - ↑ Francis Whishaw, The Railways of Great Britain and Ireland, John Weale, London, 1842
- ↑ Bairstow, page 30
Cite error: <ref> tags exist for a group named "note", but no corresponding <references group="note"/> tag was found
- Articles with short description
- Lancashire and Yorkshire Railway
- Early British railway companies
- Railway companies established in 1836
- Railway lines opened in 1839
- Railway companies disestablished in 1847
- 1836 establishments in England
- 4 ft 9 in gauge railways in England
- British companies disestablished in 1847
- British companies established in 1836
- Pages with reference errors