Mesquite Solar
Company typePower generation facility
IndustrySolar energy
Founded2011
Headquarters
Arlington
,
United States
Area served
Arizona, United States
ProductsPhotovoltaic power, energy storage
OwnerSempra Generation, Consolidated Edison Development Inc.

The Mesquite Solar project is a photovoltaic power facility with a capacity of 512.5 megawatt (MWAC), located in Arlington, Arizona, within Maricopa County, Arizona. Ownership is held by Sempra Generation alongside Consolidated Edison Development Inc. The initial development phases incorporated more than 2.1 million crystalline silicon solar modules provided by Suntech Power. The expansions known as Mesquite 4 and 5 contributed an additional 112.5 MW of solar power capacity along with 70 MW of energy storage using batteries.

Project details

Phase 1 construction commenced in 2011 on a 3.6 km2 area adjacent to the Palo Verde Nuclear Generating Station, reaching completion in January 2013. This phase has a rated capacity of 150 MW and operates under a 20-year Power Purchase Agreement (PPA) with Pacific Gas and Electric Company (PG&E). Zachry Holdings served as the engineering, procurement, and construction (EPC) contractor. The investment for Phase 1 was roughly $600 million, with an expected annual electricity generation exceeding 350 gigawatt-hours (approximately averaging 40 MW), resulting in an estimated reduction of about 200,000 tons of carbon dioxide emissions each year.

Phases 2 and 3, delivering capacities of 100 MW and 150 MW respectively, were finalized in December 2016. These stages incorporated single-axis tracking technology to boost energy output.

Mesquite 4 is a solar installation with a capacity of 52.5 MW complemented by 10 MW of battery storage and began operations in January 2024. Mesquite 5, featuring a 60 MW solar array paired with an equal amount of battery storage capacity, has been operational since July 2023.

Electricity production

Total Facility Generation
(Annual Sum from All Units Below)
Year Total Annual MW·h
2011 2,956
2012 233,105
2013 413,611
2014 408,218
2015 397,599
2016 442,565
2017 1,145,231
2018 1,145,816
2019 1,109,029
Average (2017–2019) 1,133,359
Generation (MW·h) for Mesquite Solar Phase 1 (150MW)
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2011 1,711 1,245 2,956
2012 6,830 8,261 10,848 14,729 20,300 20,717 22,784 26,070 25,060 27,809 25,008 24,689 233,105
2013 26,897 31,203 35,698 37,963 39,751 39,487 38,113 36,261 35,489 38,806 27,362 26,581 413,611
2014 29,466 28,570 39,157 40,084 42,765 40,304 37,138 35,717 34,451 32,627 27,236 20,703 408,218
2015 20,029 30,905 37,089 40,474 40,419 37,689 35,962 36,967 33,285 31,139 29,199 24,442 397,599
2016 23,919 32,350 36,412 37,321 42,442 39,309 38,869 38,069 33,660 34,753 28,321 22,825 408,250
2017 18,968 23,127 39,542 43,048 45,896 51,628 31.943 39.425 40.513 37.184 22.096 20.363 413.734
2018 23.598 25.234 32.580 38.786 48.925 47.774 42.202 42.713 41.106 29.406 25.482 17.198 415.004
2019 21.519 21.215 33.843 40.244 42.179 47.752 42.113 45.612 36.747 37.825 21.338 16.959 407.345
Generation (MW·h) for Mesquite Solar Phase 2 (100MW with tracking)
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2016 13.255 13.255
2017

15.016 ||16.794 ||26.698 ||29.176 ||31.992 ||32.486 ||29.490 ||28.681 ||26.392 ||23.857 ||15.275 ||15.040

290.897
2018

17.201 ||18.569 ||24.484 ||28.562 ||32.739 ||31.729 ||29.461 ||29.075 ||26.015 ||16.891 ||15.900 ||14.396

285.023
2019

16.090 ||14.280 ||19.916 ||21.340 ||22.983 ||30.941 ||29.656 ||29.898 ||23..634 ||23..723 ||13..615 ||9..971

256..047