Rockport Generating Station

From Alfawiki
Adapted from the English Wikipedia article Rockport Generating Station, available under CC BY-SA 4.0Updated 7 August 2025
Rockport Generating Station
Company typeElectricity generation facility
IndustryElectric power generation
FoundedDecember 1984; 41 years ago (1984-12)
Headquarters
Ohio Township, Spencer County
,
United States
Area served
Indiana, United States
Key people
Indiana Michigan Power (operator), American Electric Power (parent company)
ProductsElectricity
ParentAmerican Electric Power

Rockport Generating Station is a coal-powered electricity facility situated on the banks of the Ohio River within Ohio Township, Spencer County, Indiana, in close proximity to Rockport, Indiana. Located near the William H. Natcher Bridge along U.S. Route 231, the station is managed by Indiana Michigan Power, a division of American Electric Power.

History

The plant comprises two identical 1,300 MW non-cyclonic units manufactured by Babcock & Wilcox, which were brought online in December 1984 and December 1988 respectively, making them among the largest coal-fired units ever constructed. It is linked to the electrical grid through 765 kV transmission lines, representing the highest voltage level utilized within the United States. The facility boasts Indiana’s tallest smokestack and ranks as one of the tallest chimneys worldwide with a height of .

Coal supply

Coal shipments arrive at the station via barge transportation along the Ohio River. The plant's annual coal consumption exceeds seven million short tons. To optimize expenses, AEP declared in February 2018 that Rockport would exclusively procure coal from Wyoming’s Powder River Basin.

Retirement

In July 2019, AEP revealed plans to retire Unit 1 of Rockport by the conclusion of 2028, following an agreement involving the United States Environmental Protection Agency (EPA), northeastern states, and environmental organizations. This arrangement allows AEP to fulfill emission reduction goals without investing in expensive pollution control technology. Subsequently, in April 2021, AEP confirmed that Unit 2 is also scheduled for retirement by the end of 2028.