South Texas Nuclear Generating Station
| Industry | Nuclear power generation |
|---|---|
| Founded | 1971 |
| Founder | Houston Lighting & Power Co., cities of Austin and San Antonio, Central Power and Light Co. |
| Headquarters | Bay City, Texas , United States |
Area served | Texas, United States |
| Products | Electricity generation (nuclear power) |
| Owner | Constellation Energy (44%), CPS Energy (40%), Austin Energy (16%) |
| Parent | STP Nuclear Operating Company (STPNOC) |
The South Texas Project Electric Generating Station (STP, STPEGS) is a nuclear power complex situated southwest of Bay City, Texas, United States. Positioned on a site to the west of the Colorado River and approximately southwest of Houston, STP consists of two Westinghouse Pressurized Water Reactor units. The facility utilizes a reservoir for cooling purposes, thereby eliminating the need for conventional cooling towers.
1971–1994
On December 6, 1971, Houston Lighting & Power Co. (HL&P), along with the cities of Austin and San Antonio and Central Power and Light Co. (CPL), initiated a feasibility study to develop a jointly owned nuclear power plant. The initial cost projection was $974 million (equivalent to roughly $4.9 billion in 2015 dollars).
By mid-1973, HL&P and CPL had selected Bay City as the preferred location, with San Antonio joining as a partner shortly thereafter. Brown and Root was contracted as both architect and construction manager. In November 1973, Austin voters narrowly approved their city's participation, with further referendums held to confirm continued involvement.
Construction permits were granted by the Atomic Energy Commission (now the Nuclear Regulatory Commission) in December 1975, allowing immediate commencement of construction. By 1978, the project encountered delays extending two years and significant budget overruns. HL&P responded by replacing management late that year to address these challenges. The 1979 Three Mile Island accident further affected the nuclear industry, leading to revised budgets and timelines. Brown and Root's completion forecast shifted to June 1989, with estimated costs ranging from $4.4 billion to $4.8 billion. Due to inadequate progress, Brown and Root was dismissed as architect/engineer in September 1981 and replaced by Bechtel Corporation; Ebasco Constructors assumed construction responsibilities in February 1982 following Brown and Root’s withdrawal.
In November 1981, Austin authorized the sale of its 16% ownership share but was unable to find buyers.
Unit 1 achieved initial criticality on March 8, 1988, commencing commercial operation on August 25; Unit 2 reached initial criticality on March 12, 1989, entering commercial service on June 19.
Both units were temporarily shut down in February 1993 to repair issues with steam-driven auxiliary feedwater pumps; operations resumed by May 1994.
The completion of STNP is particularly notable given that many nuclear projects initiated during this period were canceled following the Three Mile Island incident.
2006–present
On June 19, 2006, NRG Energy submitted a letter of intent to the NRC proposing construction of two advanced boiling water reactors (ABWRs), each rated at 1,358 MWe, at the South Texas Nuclear Project site. Initial plans did not include partners CPS Energy or Austin Energy.
NRG Energy filed the first U.S. nuclear reactor application since 1979 on September 24, 2007, seeking approval to build two Toshiba ABWRs at South Texas. This expansion would potentially double the site's generating capacity by adding approximately 2,700 MW. Construction costs were initially estimated at $10 billion but were expected to rise to $13 billion after financing costs, according to CPS Energy's interim general manager.
By October 2009, Toshiba informed CPS Energy that expenses could escalate by up to $4 billion. As a result, CPS Energy reduced its ownership share from 50% to 7.625% in 2010 after investing $370 million. This reduction threatened the viability of the expansion project.
In October 2010, Tokyo Electric Power Company (TEPCO) agreed to acquire an initial 9.2375% stake in the expansion from Nuclear Innovation North America—a joint venture between Toshiba and NRG—for $125 million, with an option for additional ownership contingent upon securing U.S. Department of Energy loan guarantees.
On April 19, 2011, NRG announced its withdrawal from the permitting process due to escalating costs and slow regulatory approvals; TEPCO's financial difficulties following the Fukushima disaster also influenced this decision. NRG recorded a $331 million write-off on its investment.
Despite NRG’s withdrawal, licensing efforts continued under NRC oversight as of October 2011. Some preliminary construction activities took place by early 2015 with targeted commercial operation dates set for March 2015 for one unit and one year later for another. The NRC granted combined license approval on February 9, 2016; however, no construction has commenced due to prevailing market conditions and no scheduled start date has been established.
During the Texas power crisis on February 15, 2021, Unit 1 at South Texas Nuclear Generation Station underwent an automatic shutdown triggered by low steam generator levels caused by feedwater pump failures. Units 2 and those at Comanche Peak Nuclear Power Plant remained operational throughout this event.
Electricity generation
| Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Total | |||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2001 | 1,886,321 | 1,525,367 | 1,023,965 | 1,693,902 | 1,749,601 | 1,803,826 | 1,862,368 | 1,861,391 | 1,784,413 | 948,097 | 1,821,433 | 1,879,914 | 19,840,598 | |||||||||||||||||||||||||||||||||||||||||||||
| 2002 | 1,877,631 | 1,694,952 | 1,874,294 | 1,802,364 | 1,853,569 | 1,651,816 | 1,804,722 | 1,863,231 | 1,809,080 | 961,912 | 648,839 | 1,207,192 | 19,049,602 | |||||||||||||||||||||||||||||||||||||||||||||
| 2003 | 993,000 | 858,234 | 1,167,859 | 906,020 | 926,323 | 897,961 | 924,414 | 1,550,300 | 1,826,511 | 1,901,587 | 1,835,032 | 1,901,300 | 15,688,541 | |||||||||||||||||||||||||||||||||||||||||||||
| 2004 | 1,794,208 | 1,783,984 | 1,866,066 | 967,940 | 1,898,881 | 1,833,986 | 1,888,035 | 1,886,885 | 1,832,462 | 1,898,705 | 1,846,256 | 1,874,559 | 21,371,967 | |||||||||||||||||||||||||||||||||||||||||||||
| 2005 | 1,910,104</ small > | < small > 1 , 425 , 909 < / small > | < small > 1 , 145 , 000 < / small > | < small > 1 , 347 , 849 < / small > | < small > 1 , 899 , 476 < / small > | < small > 1 , 827 , 979 < / small > | < small > 1 , 882 , 165 < / small > | < small > 1 , 865 , 460 < / small > | < small > 1793 , 374 < / small > | < small > 961 , 783 < / small > | < small > 1812 , 505 < / small > | < small >1917 , 689 </ small > | 19 ,789 ,293 | - | 2006 | < small >1918 ,500 </ small > | < small >1734 ,226 </ small > | < small >1916 ,180 </ small > | < small >1848 ,924 </ small > | < small >1902 ,066 </ small > | < small >1835 ,603 </ small > | < small >1894 ,140 </ small > | < small >1889 ,118 </ small > | < small >1754 ,581 </ small > | < small >949 ,107 </ small > | < small >1751 ,295 </ small > | < small >1974 ,529 </ small > | 21 ,368 ,269 | - | 2007 | < small >1978 ,523 </ small > | < small >1769 ,752 </ small > | < small >1631 ,719 </ small > | < small >1020 ,990 </ small > | < small >1997 ,207 </ small > | < small >1913 ,083 </ small > | < small >1974 ,291 </ small > | < small >1945 ,127 </ small > | < small >1911 ,186 </ small > | < small >1994 ,784 </ small > | < small >1951 ,698 </ small > | < small >2020 ,923 </ small > | 22 ,109 ,283 | - | 2008 | < small >2027 ,749 </ small > | < small >1894 ,252 </ small > | < small >1857 ,380 </ small > | < small >1059 ,644 </ small > | < small >1996 ,808 </ small > | < small >1911 ,071 </ small > | < small >1970 ,008 </ small > | < small >1968 ,743 </ small > | < small >1883 ,018 </ small > | < small >1091 ,075 </.small> | <.small>1804 ,680 </.small> | .<.small>.2028 ,.321.</.smal l. .> | 21 ,.492 ,.749 |
| 2009 |
1985 whistleblower incidentIn 1985, Ronald J. Goldstein, a supervisor employed by EBASCO—one of the principal contractors for the South Texas nuclear facilities—raised safety concerns through SAFETEAM, an internal compliance initiative jointly managed by EBASCO and Houston Lighting. His report highlighted issues such as breaches of safety protocols, omission of mandatory safety documentation, and quality control deficiencies that compromised plant safety. Although SAFETEAM was presented as an autonomous channel for reporting safety matters, employees were not made aware that submissions to this program lacked legal safeguards. After Goldstein submitted his complaint, he was terminated and subsequently initiated legal action invoking federal nuclear whistleblower protection laws. The U.S. Department of Labor determined that Goldstein’s disclosures were protected and declared his termination unlawful; this ruling was affirmed by Labor Secretary Lynn Martin. Nevertheless, the Fifth Circuit Court of Appeals reversed this verdict, concluding that private internal programs did not confer whistleblower protections. This case prompted Congress to revise federal nuclear whistleblower legislation to safeguard reports made through internal mechanisms and to prohibit retaliatory actions. OwnershipThe South Texas Project Electric Generating Station (STPEGS) is managed by the STP Nuclear Operating Company (STPNOC). Ownership stakes are held by Constellation Energy (44%), the municipal utility CPS Energy of San Antonio (40%), and Austin Energy (16%). Nearby populationThe Nuclear Regulatory Commission (NRC) delineates two emergency planning zones around nuclear power plants: a 10-mile radius plume exposure pathway zone addressing airborne radioactive hazards, and a 50-mile ingestion pathway zone concerning contaminated food and water sources. According to 2010 data, the population residing within 50 miles of the facility totaled 254,049—a growth of 10.2% since 2000—while the population within the 10-mile zone decreased by 2.4% to 5,651 individuals. Cities located within a 50-mile radius include Lake Jackson (approximately 40 miles distant) and Bay City. Seismic hazardBased on a 2010 assessment by the NRC, the estimated annual probability of an earthquake intense enough to inflict core damage at the South Texas site is approximately 1 in 158,730. Reactor specificationsThe South Texas Generating Station operates two Westinghouse four-loop pressurized water reactors (PWRs). Plans to add Units 3 and 4, designed as Advanced Boiling Water Reactors (ABWRs), were ultimately abandoned.
See also
Sources
External links |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
- Energy infrastructure completed in 1988
- Energy infrastructure completed in 1989
- Buildings and structures in San Antonio
- Buildings and structures in Matagorda County, Texas
- 1976 establishments in Texas
- Nuclear power stations with proposed reactors
- Nuclear power plants in Texas
- Nuclear power stations using advanced boiling water reactors
- Nuclear power stations using pressurized water reactors
- CPS Energy
- NRG Energy